Areva, Inc. - Revision to Authorization for Shipment of the Model No. 51032-2 Package from Crystal River 3 to Oconee Nuclear Power Plant
ML16022A145
Person / Time
Site: Oconee, Crystal River, 07109252  Duke Energy icon.png
Issue date: 01/19/2016
From: Travis Tate
AREVA
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
TJT:16:003
Download: ML16022A145 (3)


Text

A AR EVA January 19, 2016 TJT:1 6:003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Director, Division of Spent Fuei Management Office of Nuclear Material Safety and Safeguards 11555 Rockville Pike One White Flint North Rockville, MD 20852 Gentlemen:

Subject:

Revision to Authorization for Shipment of the Model No. 51032-2 Package from Crystal River 3 to Oconee Nuclear Power Plant Ref. 1.

Letter, T. Tate to USNRC Document Control Desk; "Docket 71-9252, Model 51032-2 Shipping Container; Request for Letter of Authorization for Approval for Shipment of Crystal River 3 Contaminated Fresh Fuel Assemblies;" June 30, 2015.

Ref. 2.

Letter, M. Sampson to T. Tate; "Authorization for Shipment of the Model No.

51032-2 Package from Crystal River 3 to Oconee Nuclear Power Plant";

October 29, 2015.

Via Reference 1, AREVA Inc. (AREVA) requested that the NRC amend Certificate of Compliance (CoC) No. 9252 for the Model No. 51032-2 package via a Letter of Authorization allowing shipment of 4.95 wt.%-enriched fuel assemblies from the Crystal River 3 nuclear power plant to the Oconee nuclear power plant. Via Reference 2 the NRC granted the requested authorization and set forth the special conditions applicable to the shipments. The authorization was limited to shipments made between July 1 and September 30, 2016 and between July 1 and September 30, 2017. This was based on AREVA's statement in Reference 1 that the shipments would occur from "July to September of 2016 and from July to September of 2017."

The planned date ranges for the shipments were provided by AREVA's customer Duke Energy and were based on the best information available to Duke at that time. Duke Energy has since (December 2015) contacted AREVA requesting added flexibility in the dates of shipments based on the likelihood of schedule changes for the fuel transfers.

Accordingly in behalf of its customer, AREVA requests that the period of validity for the authorization, as stated in the first paragraph of Reference 2, be revised to read:

"This authorization is valid for packages to be shipped within two four-month windows determined mutually by Duke Energy and AREVA and communicated 21 01 Horn Rapids Road. Richiand WA 99354 S

Tel.: 509 375 8100 - www, areva.com

USNRC TJT: 16:003 January 19, 2016 Page 2 to the NRC by ARE VA at least ninety (90) days prior to the start of each window."

All other conditions imposed by the Reference 2 NRC authorization will remain unchanged. AREVA requests NRC action on this request to support a 90-day pre-notification of an initial shipping window commencing as early as July 2016. Please feel free to contact me at 509-375-8550 if you have questions or need additional information.

Sincerely, T. J. Tate, Manager EHS&L

USNRC January 19, 2016 TJT: 16:003 Page 3 C:

Huda Akhavannik NMSS/DSFM/SFLB Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738

A AR EVA January 19, 2016 TJT:1 6:003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Director, Division of Spent Fuei Management Office of Nuclear Material Safety and Safeguards 11555 Rockville Pike One White Flint North Rockville, MD 20852 Gentlemen:

Subject:

Revision to Authorization for Shipment of the Model No. 51032-2 Package from Crystal River 3 to Oconee Nuclear Power Plant Ref. 1.

Letter, T. Tate to USNRC Document Control Desk; "Docket 71-9252, Model 51032-2 Shipping Container; Request for Letter of Authorization for Approval for Shipment of Crystal River 3 Contaminated Fresh Fuel Assemblies;" June 30, 2015.

Ref. 2.

Letter, M. Sampson to T. Tate; "Authorization for Shipment of the Model No.

51032-2 Package from Crystal River 3 to Oconee Nuclear Power Plant";

October 29, 2015.

Via Reference 1, AREVA Inc. (AREVA) requested that the NRC amend Certificate of Compliance (CoC) No. 9252 for the Model No. 51032-2 package via a Letter of Authorization allowing shipment of 4.95 wt.%-enriched fuel assemblies from the Crystal River 3 nuclear power plant to the Oconee nuclear power plant. Via Reference 2 the NRC granted the requested authorization and set forth the special conditions applicable to the shipments. The authorization was limited to shipments made between July 1 and September 30, 2016 and between July 1 and September 30, 2017. This was based on AREVA's statement in Reference 1 that the shipments would occur from "July to September of 2016 and from July to September of 2017."

The planned date ranges for the shipments were provided by AREVA's customer Duke Energy and were based on the best information available to Duke at that time. Duke Energy has since (December 2015) contacted AREVA requesting added flexibility in the dates of shipments based on the likelihood of schedule changes for the fuel transfers.

Accordingly in behalf of its customer, AREVA requests that the period of validity for the authorization, as stated in the first paragraph of Reference 2, be revised to read:

"This authorization is valid for packages to be shipped within two four-month windows determined mutually by Duke Energy and AREVA and communicated 21 01 Horn Rapids Road. Richiand WA 99354 S

Tel.: 509 375 8100 - www, areva.com

USNRC TJT: 16:003 January 19, 2016 Page 2 to the NRC by ARE VA at least ninety (90) days prior to the start of each window."

All other conditions imposed by the Reference 2 NRC authorization will remain unchanged. AREVA requests NRC action on this request to support a 90-day pre-notification of an initial shipping window commencing as early as July 2016. Please feel free to contact me at 509-375-8550 if you have questions or need additional information.

Sincerely, T. J. Tate, Manager EHS&L