NRC-015 Submitted Nov. 10, 2015 NRR-PMDAPEm Resource From: Klett, Audrey Sent: Friday, July 18, 2014 1:23 PM To: Tomonto, Bob (Bob.Tomonto@fpl.com); Czaya, Paul (Paul.Czaya@fpl.com)
Cc: 'Hanek, Olga' (Olga.Hanek@fpl.com)
Subject:
Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TAC MF4392 and MF4393)
Follow Up Flag: Follow up Flag Status: Flagged Bob, Paul, By letter dated July 10, 2014, as supplemented by letter dated July 17, 2014, Florida Power & Light Company (the licensee) submitted a license amendment request for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point). The licensee requested revisions to the Turkey Point Technical Specifications (TSs),
Section 3/4.7.4, Ultimate Heat Sink.
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided by the licensee and determined that it needs additional information to complete the review. The NRC staffs request for additional information (RAI) is as follows.
RAI 1
Title 10 of the Code of Federal Regulations (10 CFR), Paragraph 50.36(a) requires each applicant for a license to include proposed TSs as well as a summary statement of the bases or reasons for such specifications.
Please provide a copy of the TS Bases associated with the proposed TSs.
RAI 2
Paragraph 50.36(c)(3) of 10 CFR states that Surveillance Requirements (SRs) assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits and that the limiting conditions for operation [LCOs] will be met. The proposed frequency for the new SR 4.7.4.b is at least once per 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> when water temperature exceeds 100°F [degrees Fahrenheit]. Please provide a justification for the 6-hour frequency that demonstrates that the frequency assures that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the LCO will be met.
RAI 3
The text referring to the water temperature limit is inconsistent between the LCO 3.7.4 statement and SRs 4.7.4.a and b. The LCO statement uses the text less than or equal to 104°F, whereas SR 4.7.4.a uses the text its limit, and SR 4.7.4.b uses the text the limit. Surveillance requirements assure that the LCO will be met. Therefore, please propose new text referring to the water temperature limit in the SRs that is consistent with the LCO text.
United States Nuclear Regulatory Commission Official Hearing Exhibit Audrey Klett In the Matter of: FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)
Project Manager ASLBP #: 15-935-02-LA-BD01 NRR/DORL/LPLII-2 Docket #: 05000250 & 05000251 Exhibit #: NRC-015-00-BD01 Identified: 1/4/2016 301-415-0489 Admitted: 1/4/2016 Withdrawn:
Rejected: Stricken:
Other:
1
Hearing Identifier: NRR_PMDA Email Number: 1440 Mail Envelope Properties (Audrey.Klett@nrc.gov20140718132300)
Subject:
Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TAC MF4392 and MF4393)
Sent Date: 7/18/2014 1:23:24 PM Received Date: 7/18/2014 1:23:00 PM From: Klett, Audrey Created By: Audrey.Klett@nrc.gov Recipients:
"'Hanek, Olga' (Olga.Hanek@fpl.com)" <Olga.Hanek@fpl.com>
Tracking Status: None "Tomonto, Bob (Bob.Tomonto@fpl.com)" <Bob.Tomonto@fpl.com>
Tracking Status: None "Czaya, Paul (Paul.Czaya@fpl.com)" <Paul.Czaya@fpl.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2210 7/18/2014 1:23:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: Follow up
NRC-015 Submitted Nov. 10, 2015 NRR-PMDAPEm Resource From: Klett, Audrey Sent: Friday, July 18, 2014 1:23 PM To: Tomonto, Bob (Bob.Tomonto@fpl.com); Czaya, Paul (Paul.Czaya@fpl.com)
Cc: 'Hanek, Olga' (Olga.Hanek@fpl.com)
Subject:
Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TAC MF4392 and MF4393)
Follow Up Flag: Follow up Flag Status: Flagged Bob, Paul, By letter dated July 10, 2014, as supplemented by letter dated July 17, 2014, Florida Power & Light Company (the licensee) submitted a license amendment request for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point). The licensee requested revisions to the Turkey Point Technical Specifications (TSs),
Section 3/4.7.4, Ultimate Heat Sink.
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided by the licensee and determined that it needs additional information to complete the review. The NRC staffs request for additional information (RAI) is as follows.
RAI 1
Title 10 of the Code of Federal Regulations (10 CFR), Paragraph 50.36(a) requires each applicant for a license to include proposed TSs as well as a summary statement of the bases or reasons for such specifications.
Please provide a copy of the TS Bases associated with the proposed TSs.
RAI 2
Paragraph 50.36(c)(3) of 10 CFR states that Surveillance Requirements (SRs) assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits and that the limiting conditions for operation [LCOs] will be met. The proposed frequency for the new SR 4.7.4.b is at least once per 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> when water temperature exceeds 100°F [degrees Fahrenheit]. Please provide a justification for the 6-hour frequency that demonstrates that the frequency assures that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the LCO will be met.
RAI 3
The text referring to the water temperature limit is inconsistent between the LCO 3.7.4 statement and SRs 4.7.4.a and b. The LCO statement uses the text less than or equal to 104°F, whereas SR 4.7.4.a uses the text its limit, and SR 4.7.4.b uses the text the limit. Surveillance requirements assure that the LCO will be met. Therefore, please propose new text referring to the water temperature limit in the SRs that is consistent with the LCO text.
United States Nuclear Regulatory Commission Official Hearing Exhibit Audrey Klett In the Matter of: FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)
Project Manager ASLBP #: 15-935-02-LA-BD01 NRR/DORL/LPLII-2 Docket #: 05000250 & 05000251 Exhibit #: NRC-015-00-BD01 Identified: 1/4/2016 301-415-0489 Admitted: 1/4/2016 Withdrawn:
Rejected: Stricken:
Other:
1
Hearing Identifier: NRR_PMDA Email Number: 1440 Mail Envelope Properties (Audrey.Klett@nrc.gov20140718132300)
Subject:
Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TAC MF4392 and MF4393)
Sent Date: 7/18/2014 1:23:24 PM Received Date: 7/18/2014 1:23:00 PM From: Klett, Audrey Created By: Audrey.Klett@nrc.gov Recipients:
"'Hanek, Olga' (Olga.Hanek@fpl.com)" <Olga.Hanek@fpl.com>
Tracking Status: None "Tomonto, Bob (Bob.Tomonto@fpl.com)" <Bob.Tomonto@fpl.com>
Tracking Status: None "Czaya, Paul (Paul.Czaya@fpl.com)" <Paul.Czaya@fpl.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2210 7/18/2014 1:23:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: Follow up