ML16007A117
| ML16007A117 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/07/2016 |
| From: | Balwant Singal Plant Licensing Branch IV |
| To: | Linda Williams Energy Northwest |
| References | |
| MF7154 | |
| Download: ML16007A117 (2) | |
Text
1 NRR-PMDAPEm Resource From:
Singal, Balwant Sent:
Thursday, January 07, 2016 9:11 AM To:
'Williams, Lisa L.'
Subject:
Acceptance Review - Relief Request 4ISI-02 for Columbia Generating Station (CAC MF 7154)
- Lisa, By letter dated December 10, 2015 (Agencywide Documents Access and Management System (ADAMS)
Accession Number ML15344A519), Energy Northwest (the licensee) requested relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, specifically related to system leakage test following repair/replacement activities for Columbia Generating Station.
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Balwant K. Singal Senior Project Manager (Comanche Peak and Columbia)
Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222
Hearing Identifier:
NRR_PMDA Email Number:
2578 Mail Envelope Properties (323fee38af8e4b58bfbe9a52346c74ac)
Subject:
Acceptance Review - Relief Request 4ISI-02 for Columbia Generating Station (CAC MF 7154)
Sent Date:
1/7/2016 9:10:54 AM Received Date:
1/7/2016 9:10:55 AM From:
Singal, Balwant Created By:
Balwant.Singal@nrc.gov Recipients:
"'Williams, Lisa L.'" <llwilliams@energy-northwest.com>
Tracking Status: None Post Office:
HQPWMSMRS02.nrc.gov Files Size Date & Time MESSAGE 1994 1/7/2016 9:10:55 AM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
1 NRR-PMDAPEm Resource From:
Singal, Balwant Sent:
Thursday, January 07, 2016 9:11 AM To:
'Williams, Lisa L.'
Subject:
Acceptance Review - Relief Request 4ISI-02 for Columbia Generating Station (CAC MF 7154)
- Lisa, By letter dated December 10, 2015 (Agencywide Documents Access and Management System (ADAMS)
Accession Number ML15344A519), Energy Northwest (the licensee) requested relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, specifically related to system leakage test following repair/replacement activities for Columbia Generating Station.
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Balwant K. Singal Senior Project Manager (Comanche Peak and Columbia)
Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222
Hearing Identifier:
NRR_PMDA Email Number:
2578 Mail Envelope Properties (323fee38af8e4b58bfbe9a52346c74ac)
Subject:
Acceptance Review - Relief Request 4ISI-02 for Columbia Generating Station (CAC MF 7154)
Sent Date:
1/7/2016 9:10:54 AM Received Date:
1/7/2016 9:10:55 AM From:
Singal, Balwant Created By:
Balwant.Singal@nrc.gov Recipients:
"'Williams, Lisa L.'" <llwilliams@energy-northwest.com>
Tracking Status: None Post Office:
HQPWMSMRS02.nrc.gov Files Size Date & Time MESSAGE 1994 1/7/2016 9:10:55 AM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: