ML15362A609
| ML15362A609 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 01/11/2016 |
| From: | Martin R, Michael Orenak Plant Licensing Branch II |
| To: | Pierce C Southern Nuclear Operating Co |
| Martin B, NRR/DORL/LPLII-1 | |
| References | |
| TAC MF6063, TAC MF6064 | |
| Download: ML15362A609 (7) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 11, 2016 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc.
P. 0. Box 1295/Bin - 038 Birmingham, AL 35201-1295
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MF6063 AND MF6064)
Dear Mr. Pierce:
By letter dated April 2, 2015, as supplemented by letter dated November 12, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML15092A856 and ML15322A089, respectively), Southern Nuclear Operating Company requested a license amendment to modify Technical Specifications (TS) Section 1.0, "Definitions", Limiting Conditions for Operation and Surveillance Requirement Applicability Section 3.4.9, "RCS Pressure and Temperature (PIT) Limits,", and Section 5.0, "Administrative Controls," at the Edwin I. Hatch Nuclear Plant, Units 1 and 2.
The U.S. Nuclear Regulatory Commission staff has found that further information is needed to complete its review. The draft information request is included in the attached document.
Please provide your response by within 30 days of the date of this letter.
Docket Nos. : 50-321, 50-366 cc: Distribution via Listserv Sincerely,
- wvJ r)) (G}u Michael D. Orenak, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
REQUEST FOR ADDITIONAL INFORMATION REGARDING CHANGES TO TECHNICAL SPECIFICATION SECTIONS 1.0, 3.4.9, AND 5.0 EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 SOUTHERN NUCLEAR OPERATING COMPANY. INC.
DOCKET NOS. 50-321 AND 50-366 By letter dated April 2, 2015, as supplemented by letter dated November 12, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML15092A856 and ML15322A089, respectively), Southern Nuclear Operating Company requested a license amendment to modify Technical Specifications (TS) Section 1.0, "Definitions", Limiting Conditions for Operation and Surveillance Requirement Applicability Section 3.4.9, "RCS Pressure and Temperature (Pff) Limits,", and Section 5.0, "Administrative Controls," at the Edwin I. Hatch Nuclear Plant (HNP), Units 1 and 2.
The U.S. Nuclear Regulatory Commission (NRC) staff has found that further information is needed to complete its review. Please provide the requested information below.
The responses to RAI 2, RAI 4, and RAI 6 from the November 12, 2015, letter included information that could result in revised Pressure Temperature Limit Reports (PTLRs). If this information does revise the PLTRs, please submit a revision for both HNP, Units 1 and 2. If the information does not require revised PL TRs, please provide a justification.
The NRC staff was able to successfully reproduce all of the pressure-temperature (P-T) curves for HNP, Unit 2, for 50.1 effective full power years (EFPY). The NRC staff was able to successfully reproduce all of the P-T curves for HNP, Unit 1, for 38 EFPY except for one portion of Curve C. Figures 1 and 2 provide the results of the NRC's independent evaluation for HNP, Unit 1, at 38 EFPY for Curves B and C, respectively. As noted by the two text box annotations in Figure 1 and the lower text box in Figure 2 that begins with, "Curve C is controlled... ", the NRC's evaluation indicates that the licensee's Curve C may not meet ASME Boiler and Pressure Vessel (B&PV) Code,Section XI, Appendix G (2004 Edition, per the PTLR Topical Report BWROG-TP-11-022-A, Revision 1 ), minimum temperature limits arid therefore may be non-conservative.
Page 15 of Calculation No. 1001527.304, Rev. 2, as provided in the November 12, 2015, supplement, states that the feedwater nozzle thermal stress intensity factor (K1r) was scaled based on the available temperature differential. The NRC staff approximated this scaling in their independent assessment based on the information available in the documents supplied by the licensee. The NRC staff recognizes that there may be some differences caused by this approximation. However, based on the comparison of results in Figure 1, the staff's Enclosure approximation yields very close agreement to the licensee's Curve B for temperatures greater than 76 degrees Fahrenheit (F), so any differences caused by the staff's approximation appear to be insignificant.
Please clarify whether the lower portions of Curve C for Hatch 1 for HNP, Unit 1, 38 and 49.3 EFPY adequately bound the non-beltline region.
Figure 1: Results of NRC's Independent Calculation of Curve B for Hatch Unit 1 at 38 1300
~
f a '
1,200
(
b f
f
~
+
f 1,100 6
I>
I I Q
~b f
1,000 ef>
~
a>
J, I I
+
ii
~ '
I Cl.
J
~
900 I
t
~
- h. '
800
~
~
j I I I
~
f 700
+ J y
t I
+
600 ASMEApp. G I
calrulations
/i t
extended by 40"F to I
500 allow for a Curve C sftift of 40"F.
v I
+
I
\\
. /
I
+
I 400 I
+
I,
NRC Beltline I +
300
.t:. - ---- 6.-
+
PTLR Limiting Beltlne
/i
-f
\\
NRC Bottom Head f
+
PTLR Bottom Head 0
200
)
T
- - - -NRC FW Nozzle I
I
/
~
fl PTLR Non-Beltline 100 NRC WU Nozzle 0
vj 0
50 100 150 200 250 30 0 MINIMUM REACTOR VESSEL METAL TEMPERATURE (°F)
Non-Beltline ( FW Nozzle)wrve is more Unit 1 Heatup-Cooldown Curve B, 38 EFPY limiting here than the limiting beltline fWU Noulelwrve.
EFPY Figure 2: Results of NRC's Independent Calculation of Curve C for Hatch Unit 1 at 38 1,300 A
- PTLR Belln e Curve c 4
1,200 PTLR Bottom Head CLJVe c I
1
- PTLR Non-Beltline Curve C 1,100 -
* Curve A Min. Tell1>. at Pressure lt
~
-- NRC COll1lOSie Curve C
-;;1,000
'ii
.9J Q
900 us
- c
- a.
0 800 I-_,
w tn tn w 700 a:
0 t; 600 us a:
z I-500 i
- i w 400 a:
~
tn tn w
a:
300
- a.
200 100 0
I I
I A
. I 10CFRSOApp. G minimum limits. Purple point is atT = 212"F I
from revised Table 3 in Endmure 7 to RAf
~
)
responses. This is I
inconsistent with the I I value of 202"F stated in the response to RAI 6 and plotted in Figure 3 I 1/
of the PTlR.
. ~
Ci].)
/
~-
CUrve C is controlled by the Non-
~
Beltline (FW Nonie) rurve here when the Curve 8 plot is shifted
~ by 40'F. c.urve C in Figure 3of
........... ~
PTLR (shown by purple dotted v
line) does not reflect tills and appears non-oonservative.
I 0
50 100 150 200 250 300 MINIMUM REACTOR VESSEL METAL TEMPERATURE (
0 F)
Unit 1 Curve C, 38 EFPY EFPY
RAI 10
In the response to RAI 6 of the November 12, 2015, supplement, the licensee states that the values in Table 3 of the HNP, Unit 1, PTLR should list a temperature of 202 degrees F for pressures greater than 312.6 pounds per square inch gauge (psig). A revised Table 3 was provided in Enclosure 7 to the licensee's RAI responses. However, revised Table 3 in that enclosure lists a revised temperature of 212 degrees F for pressures greater than 312.6 psig.
This value does not match the licensee's response, nor does it match the value plotted in Figure 3 of the HNP, Unit 1, PTLR. Refer to the text box that begins with, "1 O CFR 50 App. G minimum limits," in Figure 2 above. Please clarify this discrepancy.
RAI 11
In the response to RAI 7 in the November 12, 2015, supplement, the licensee states, The current methodology, used to develop the curves in the PTLR, is based on Reference [1]...
However, Reference 1 is the NRC request for additional information, and not a methodology for computing P-T curves. Please provide the correct Reference 1.
- via email OFFICE NRR/LPLll-1/PM NRR/LPLll-1/LA NRR/EVIB/BC NRR/LPLll-1/BC NRR/LPLll-1/PM NAME MOrenak SFigueroa JMcHale MMarkley MOrenak DATE 01/07/16 12/29/15 01/08/16 01/11/16 01/11/16