|
---|
Category:Letter
MONTHYEARIR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20243012023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23212B2682023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000324/20224032022-11-10010 November 2022 Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 ML22307A1762022-11-0707 November 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) IR 05000324/20220032022-11-0707 November 2022 Integrated Inspection Report 05000324/2022003 and 05000325/2022003 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000324/20220052022-08-24024 August 2022 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2022005 and 05000325/2022005) ML22230D0692022-08-22022 August 2022 Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident IR 05000324/20220022022-08-0505 August 2022 Integrated Inspection Report 05000324/2022002 and 05000325/2022002 IR 05000324/20220102022-06-27027 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000324 2022010 and 05000325 2022010 ML22028A1742022-05-12012 May 2022 Issuance of Amendment Nos. 309 and 337 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-580, Revision 1 IR 05000324/20220012022-05-10010 May 2022 Integrated Inspection Report 05000324/2022001 and 05000325/2022001 ML22119A1352022-05-0909 May 2022 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000325/2022403; 05000324/2022403 ML22082A2682022-05-0202 May 2022 Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML22102A0502022-04-11011 April 2022 301 Corporate Notification Letter IR 05000324/20224012022-03-16016 March 2022 Security Baseline Inspection Report 05000324/2022401 and 05000325/2022401 ML22054A2152022-03-0808 March 2022 Correction to Amendments to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications IR 05000324/20210062022-03-0202 March 2022 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 (Reports No. 05000324/2021006 and 05000325/2021006) IR 05000324/20210042022-02-14014 February 2022 Integrated Inspection Report 05000324/2021004 and 05000325/2021004 ML22035A1262022-02-0909 February 2022 Withdrawal of Exemption Request from the Requirements of 10 CFR Part 50, Appendix E, Section IV.F.2.d (EPID L-2021-LLE-0055 (COVID-19)) ML21354A5032022-01-24024 January 2022 Requested Exemption from 10 CFR 50, Appendix E, Section IV.F.2.D Not Required (EPID L-2021-LLE-0055 (COVID-19)) ML22018A1842022-01-18018 January 2022 Notification of Brunswick Steam Electric Plant, Units 1 & 2 - Design Bases Assurance Inspection - U.S. Nuclear Regulatory Inspection Report 05000324/2022010 and 05000325/2022010 ML21348A7192021-12-21021 December 2021 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times 2023-09-25
[Table view] |
See also: IR 05000324/2015301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
December 11, 2015
Duke Energy Progress, Inc.
ATTN: Mr. Jonathan L. Hicks
Manager, Training
Brunswick Steam Electric Plant
P. O. Box 10429
Southport, NC 28461-0429
SUBJECT: BRUNSWICK NUCLEAR PLANT - OPERATOR LICENSING WRITTEN
EXAMINATION APPROVAL 05000325/2015301 AND 05000324/2015301
Dear Mr. Hicks:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing written
examination at Brunswick Nuclear Plant.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license
applications submitted in connection with this examination and separately provided a list of approved
applicants to your office. The NRC staff administered operating tests to these individuals, as applicable,
from December 1-7, 2015. Note that any examination waivers and application denials have been
addressed in separate correspondence.
The NRC has approved the subject written examination and hereby authorizes you to administer the
written examination in accordance with Revision 10 of NUREG-1021, Operator Licensing Examination
Standards for Power Reactors, on December 15, 2015.
This examination has undergone extensive review by my staff and representatives responsible for
operator training at your facility. Based on this review, I have concluded that the examination meets the
guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this
examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the
qualifications of licensed operators at your facility. If you determine that this examination is not
appropriate for licensing operators at your facility, do not administer the examination and contact me at
(404) 997-4662.
Please contact the Chief Examiner, Mr. Richard S. Baldwin, at (404) 997-4642 if you have any questions
or identify any errors or changes in license level (RO or SRO) or type of examination (partial or complete
written examination and/or operating test) specified for each applicant on the list of approved applicants.
Sincerely,
/RA/
Eugene F. Guthrie, Chief
Operations Branch 2
Division of Reactor Safety
Docket Nos.: 50-325, 50-324
License Nos.: DPR-71, DPR-62
Duke Energy Progress, Inc.
ATTN: Mr. Jonathan L. Hicks
Manager, Training
Brunswick Steam Electric Plant
P. O. Box 10429
Southport, NC 28461-0429
SUBJECT: BRUNSWICK NUCLEAR PLANT - OPERATOR LICENSING WRITTEN
EXAMINATION APPROVAL 05000325/2015301 AND 05000324/2015301
Dear Mr. Hicks:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing written
examination at Brunswick Nuclear Plant.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license
applications submitted in connection with this examination and separately provided a list of approved
applicants to your office. The NRC staff administered operating tests to these individuals, as applicable,
from December 1-7, 2015. Note that any examination waivers and application denials have been
addressed in separate correspondence.
The NRC has approved the subject written examination and hereby authorizes you to administer the
written examination in accordance with Revision 10 of NUREG-1021, Operator Licensing Examination
Standards for Power Reactors, on December 15, 2015.
This examination has undergone extensive review by my staff and representatives responsible for
operator training at your facility. Based on this review, I have concluded that the examination meets the
guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this
examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the
qualifications of licensed operators at your facility. If you determine that this examination is not
appropriate for licensing operators at your facility, do not administer the examination and contact me at
(404) 997-4662.
Please contact the Chief Examiner, Mr. Richard S. Baldwin, at (404) 997-4642 if you have any questions
or identify any errors or changes in license level (RO or SRO) or type of examination (partial or complete
written examination and/or operating test) specified for each applicant on the list of approved applicants.
Sincerely,
/RA/
Eugene F. Guthrie, Chief
Operations Branch 2
Division of Reactor Safety
Docket Nos.: 50-325, 50-324
License Nos.: DPR-71, DPR-62
x PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE x NON-SENSITIVE
ADAMS: Yes ACCESSION NUMBER: ML15351A513 X SUNSI REVIEW COMPLETE
OFFICE RII:DRS RII:DRS RII:DRS
SIGNATURE JHK BAC EFG
NAME JKIRBY BCABALLERO EGUTHRIE
DATE 12/ /2015 12/ 11 /2015 12/11/2015 12/ /2015 12/ /2015 12/ /2015
E-MAIL COPY? YES NO YES YES YES NO YES NO YES NO