ML15338A077
| ML15338A077 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 11/24/2015 |
| From: | Kay J Southern California Edison Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML15338A077 (2) | |
Text
James A. Kay Manager, Nuclear Regulatory Affairs An EDISON INTERNATIONAL'~ Company SAFEGUARDS INFORMATION Withhold from public disclosure Decontrolled upon removal of Enclosures 2 and 3 November 24, 2015 10 CFR 50.54(p)
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Docket Nos. 50-361, 50-362 and 72-41 Revision 15 to the Physical Security Plan San Onofre Nuclear Generating Station, Units 2 and 3, and Independent Spent Fuel Storage Installation
Dear Sir or Madam:
Southern California Edison (SCE) has made changes to the Physical Security Plan for the San Onofre Nuclear Generating Station (SONGS) that SCE has determined does not decrease the safeguards effectiveness of this plan.
In accordance with 10 CFR 50.54(p)(2), a report containing a description of these changes is enclosed for your information and a record of the changes has been made and is available for inspection at SONGS.
r There are no new regulatory commitments made by this letter or its enclosures.
Note that Enclosures 2 and 3 to this letter contain safeguards information and should be withheld from public disclosure. This letter may be decontrolled upon separation from Enclosures 2 and 3.
P. 0. Box 128 San Clemente, CA 92672 SAFEGUARDS INFORMATION Withhold from public disclosure Decontrolled upon removal of Enclosures 2 and 3
Document Control Desk November 24, 2015 SAFEGUARDS INFORMATION Withhold from public disclosure Decontrolled upon removal of Enclosures 2 and 3 If you have any questions regarding this matter, please contact me at (949) 368-7418.
Sincerely,
. '. (""':\\
Enclosures:
- 1.
- Screening Criteria Forms
- 2. (SGI) Physical Security Plan Changed Pages, Line-in/Line-out Version
- 3. (SGI), Physical Security Plan Changed Pages, Clean Version cc:
M. Haire, NRG Region IV, Branch Chief, Plant Support Branch SAFEGUARDS INFORMATION Withhold from public disclosure Decontrolled upon removal of Enclosures 2 and 3
James A. Kay Manager, Nuclear Regulatory Affairs An EDISON INTERNATIONAL'~ Company SAFEGUARDS INFORMATION Withhold from public disclosure Decontrolled upon removal of Enclosures 2 and 3 November 24, 2015 10 CFR 50.54(p)
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Docket Nos. 50-361, 50-362 and 72-41 Revision 15 to the Physical Security Plan San Onofre Nuclear Generating Station, Units 2 and 3, and Independent Spent Fuel Storage Installation
Dear Sir or Madam:
Southern California Edison (SCE) has made changes to the Physical Security Plan for the San Onofre Nuclear Generating Station (SONGS) that SCE has determined does not decrease the safeguards effectiveness of this plan.
In accordance with 10 CFR 50.54(p)(2), a report containing a description of these changes is enclosed for your information and a record of the changes has been made and is available for inspection at SONGS.
r There are no new regulatory commitments made by this letter or its enclosures.
Note that Enclosures 2 and 3 to this letter contain safeguards information and should be withheld from public disclosure. This letter may be decontrolled upon separation from Enclosures 2 and 3.
P. 0. Box 128 San Clemente, CA 92672 SAFEGUARDS INFORMATION Withhold from public disclosure Decontrolled upon removal of Enclosures 2 and 3
Document Control Desk November 24, 2015 SAFEGUARDS INFORMATION Withhold from public disclosure Decontrolled upon removal of Enclosures 2 and 3 If you have any questions regarding this matter, please contact me at (949) 368-7418.
Sincerely,
. '. (""':\\
Enclosures:
- 1.
- Screening Criteria Forms
- 2. (SGI) Physical Security Plan Changed Pages, Line-in/Line-out Version
- 3. (SGI), Physical Security Plan Changed Pages, Clean Version cc:
M. Haire, NRG Region IV, Branch Chief, Plant Support Branch SAFEGUARDS INFORMATION Withhold from public disclosure Decontrolled upon removal of Enclosures 2 and 3