UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 November 27, 2015 Mr. Peter A. Gardner Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS:
MONTICELLO NUCLEAR GENERATING PLANT, UNIT 1
Dear Mr. Gardner:
We have received your corporate letter L-XE-15-012, dated May 15, 2015, in response to U.S.
Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations. In the letter, you requested initial operator licensing examinations be scheduled for October 2018, and November 2020 at your Monticello Nuclear Generating Plant.
In response, we have scheduled initial operator licensing examinations for the weeks of:
October 8, and 15 with an onsite validation date the week of September 10, 2018.
With consideration for future NRC resource challenges, we have adjusted your requested exam dated from our last RIS Response letter dated January 28, 2015. Based on these anticipated resources challenges, the above dates have changed. Additionally, we have scheduled an initial operator licensing examination for the weeks of:
October 26, and November 2, 2020, with an onsite validation date the week of September 21, 2020.
In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately, upon discovery, of such conditions, and make arrangements to administer the examination at a mutually acceptable date.
We understand that your staff will develop these examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks.
Please inform us if the number of candidates decline below 10 for any examination, as this will impact the examination schedule.
Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.
P. Gardner A supplementary letter will be sent to the training department approximately 150 days prior to the examination informing the training manager of the chief examiners name. This corporate notification letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV
P. Gardner A supplementary letter will be sent to the training department approximately 150 days prior to the examination informing the training manager of the chief examiners name. This corporate notification letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV DISTRIBUTION w/encl:
Janelle Jessie RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu ADAMS Accession Number ML15336A914 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton:cl HPeterson DATE 10/06/15 11/27/15 OFFICIAL RECORD COPY
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 November 27, 2015 Mr. Peter A. Gardner Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS:
MONTICELLO NUCLEAR GENERATING PLANT, UNIT 1
Dear Mr. Gardner:
We have received your corporate letter L-XE-15-012, dated May 15, 2015, in response to U.S.
Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations. In the letter, you requested initial operator licensing examinations be scheduled for October 2018, and November 2020 at your Monticello Nuclear Generating Plant.
In response, we have scheduled initial operator licensing examinations for the weeks of:
October 8, and 15 with an onsite validation date the week of September 10, 2018.
With consideration for future NRC resource challenges, we have adjusted your requested exam dated from our last RIS Response letter dated January 28, 2015. Based on these anticipated resources challenges, the above dates have changed. Additionally, we have scheduled an initial operator licensing examination for the weeks of:
October 26, and November 2, 2020, with an onsite validation date the week of September 21, 2020.
In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately, upon discovery, of such conditions, and make arrangements to administer the examination at a mutually acceptable date.
We understand that your staff will develop these examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks.
Please inform us if the number of candidates decline below 10 for any examination, as this will impact the examination schedule.
Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.
P. Gardner A supplementary letter will be sent to the training department approximately 150 days prior to the examination informing the training manager of the chief examiners name. This corporate notification letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV
P. Gardner A supplementary letter will be sent to the training department approximately 150 days prior to the examination informing the training manager of the chief examiners name. This corporate notification letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV DISTRIBUTION w/encl:
Janelle Jessie RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu ADAMS Accession Number ML15336A914 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton:cl HPeterson DATE 10/06/15 11/27/15 OFFICIAL RECORD COPY