|
---|
Category:Legal-Exhibit
MONTHYEARML15337A3522015-11-17017 November 2015 Official Exhibit - NYS000582-00-BD01 - Diagram of Strength Vs Amplitude by Dr. Richard T. Lahey ML15337A3372015-11-11011 November 2015 Official Exhibit - ENTR00726-00-BD01 - Track 2 Hearing Exhibit List ML15337A3322015-11-0505 November 2015 Official Exhibit - ENT000726-00-BD01 - Entergy Track 2 Hearing Exhibit List ML15337A3352015-11-0505 November 2015 Official Exhibit - RIVR14001-00-BD01 - Riverkeeper Tailored Track 2 Exhibit List ML15337A3362015-11-0505 November 2015 Official Exhibit - NRCR10001-00-BD01 - NRC Staff Track 2 Exhibit List ML15337A3332015-11-0404 November 2015 Official Exhibit - NYSR25001-00-BD01 - NYS Revised Tailored Exhibits List Relevant to Track 2 Contentions ML15337A3312015-11-0303 November 2015 Official Exhibit - NRC000230-00-BD01 - Corrections to Prefiled Testimony NRC000168 and NRC000197 ML15337A3262015-10-29029 October 2015 Official Exhibit - ENT000722-00-BD01 - Supplemental Testimony of Entergy Witnesses Nelson Azevedo, Timothy Griesbach & Randy Lott ML15337A3292015-10-29029 October 2015 Official Exhibit - ENTR16001-00-BD01 - Entergy Revised Exhibit List ML15337A3242015-09-23023 September 2015 Official Exhibit - NYS000576-00-BD01 - Pre-Filed Supplemental Testimony of Richard T. Lahey Re Contentions NYS-25, NYS-26B/RK-TC-1B & NYS-38/RK-TC-5 ML15337A3072015-09-0909 September 2015 Official Exhibit - NYS000573-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2962015-09-0909 September 2015 Official Exhibit - NYS000570-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2832015-09-0909 September 2015 Official Exhibit - NYS000563-00-BD01 - Pressurized Water Reactor (PWR) Systems, USNRC Technical Training Center, Reactor Concepts Manual, Pages 4-1 to 4-28 ML15337A2952015-09-0909 September 2015 Official Exhibit - NYS000569-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2942015-09-0909 September 2015 Official Exhibit - NYS000568-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A2932015-09-0909 September 2015 Official Exhibit - NYS000567-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A3042015-09-0909 September 2015 Official Exhibit - NYS000571-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of David J. Duquette in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2972015-09-0909 September 2015 Official Exhibit - RIV000164-00-BD01 - NUREG-1740, ACRS, Voltage-Based Alternative Repair Criteria: a Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (2001) ML15337A3062015-09-0909 September 2015 Official Exhibit - NYS000572-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2822015-09-0909 September 2015 Official Exhibit - NYS000566-00-BD01 - Figure 1 for Supplemental Reply Testimony of Dr. Richard T. Lahey ML15337A3142015-09-0404 September 2015 Official Exhibit - ENTR00615-PUB-00-BD01 - Entergy'S Statement of Position Re Contention NYS-25 (Embrittlement) - Redacted ML15334A2842015-08-10010 August 2015 Official Exhibit - ENT000687-00-BD01 - NRC, Safety Evaluation Report, Topical Report on ASME Section III Piping and Component Fatigue Analysis Utilizing the Westems Computer Code (WCAP-17577, Revision 2) (Undated) ML15335A2932015-08-10010 August 2015 Official Exhibit - NRCR00104-00-BD01 - on Yee Statement of Professional Qualifications (Revised) ML15337A2642015-08-10010 August 2015 Official Exhibit - NRC000196-PUB-00-BD01 - NRC Staff'S Initial Statement of Position on Contention NYS-25 (Reactor Vessel Internals) ML15337A3192015-08-10010 August 2015 Official Exhibit - ENT000698-PUB-00-BD01 - Entergy'S Revised Statement of Position Regarding Contention NYS-38/RK-TC-5(Safety Commitments) (Aug. 10, 2015)Redacted ML15337A3202015-08-10010 August 2015 Official Exhibit - ENT000699-PUB-00-BD01 - Redacted Revised Testimony of Entergy Witnesses Nelson Azevedo, Robert Dolansky, Alan Cox, Jack Strosnider, Timothy Griesbach, Barry Gordon, Randy Lott, and Mark Gray Regarding Contention NYS-38/RK ML15337A3172015-08-10010 August 2015 Official Exhibit - ENT000678-PUB-00-BD01 - NL-07-140, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, ?Reply to Request for Additional Information Regarding License Renewal Application? (Nov. 28, 2007)Redacted ML15337A2652015-08-10010 August 2015 Official Exhibit - NRC000197-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, and Gary Stevens on NYS-25 and NYS-38/RK-TC-5 ML15337A2412015-08-10010 August 2015 Official Exhibit - NRCR00147-00-BD01 - NRC Staff'S Revised Statement of Position on State of New York and Riverkeeper'S Joint Contention NYS-38/RK-TC5 (Revised) ML15335A2902015-08-10010 August 2015 Official Exhibit - NRC000222-00-BD01 - IP3 FSAR Rev. 04 Chapter 3 (2011) (Excerpt) ML15334A2632015-08-10010 August 2015 Official Exhibit - ENT000648-00-BD01 - M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-227 Pressurized Water Reactor Internals Inspection and Evaluat ML15337A2622015-08-10010 August 2015 Official Exhibit - NRC000228-00-BD01 - Indian Point Unit 2 Technical Specifications 3.1.4 ML15337A2452015-08-10010 August 2015 Official Exhibit - NRC000227-00-BD01 - Gary Stevens Statement of Professional Qualifications ML15337A2632015-08-10010 August 2015 Official Exhibit - NRC000229-00-BD01 - Indian Point, Unit 3 Technical Specifications 3.1.4 ML15335A2192015-08-10010 August 2015 Official Exhibit - ENTR00031-00-BD01 - Curriculum Vitae of Alan B. Cox ML15335A2112015-08-10010 August 2015 Official Exhibit - ENTR20186-00-BD01 - Curriculum Vitae of Mark A. Gray ML15337A3162015-08-10010 August 2015 Official Exhibit - ENT000616-PUB-00-BD01 - Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-25 (Embrittleme ML15337A2782015-08-10010 August 2015 Official Exhibit - NRC000168-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, Mr. Gary Stevens, P.E., and Mr. on Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS-38/RK-TC-5 ML15337A2712015-08-10010 August 2015 Official Exhibit - NRC000223-00-BD01 - IP3 FSAR Rev. 04 Chapter 14 (2011) ML15337A2592015-08-10010 August 2015 Official Exhibit - NRC000224-00-BD01 - IP3 FSAR Rev. 04 Chapter 16 ML15337A2442015-08-10010 August 2015 Official Exhibit - NRCR00161-00-BD01 - NRC Staff Testimony of Dr. Allen L. Hiser and Mr. Kenneth J. Karwoski Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (Revised) ML15334A2822015-08-10010 August 2015 Official Exhibit - ENT000680-00-BD01 - Curriculum Vitae of Barry M. Gordon ML15335A2912015-08-10010 August 2015 Official Exhibit - NRCR00118-00-BD01 - Indian Point Unit 3 Technical Specifications (Excerpt) (Revised) ML15334A2282015-08-10010 August 2015 Official Exhibit - ENT000634-00-BD01 - Entergy, IP2, FSAR Update, Revision 25 (2014) (Excerpts) ML15335A2822015-08-10010 August 2015 Official Exhibit - NRC000220-00-BD01 - Pressurized Water Reactor Owners Group (PWROG) Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical Exchange: Clevis Insert Bolt Update, (June 2014) ML15337A2692015-08-10010 August 2015 Official Exhibit - NRC000169-00-BD01 - NRC000169 - Indian Point, Unit 2 Technical Specifications (Excerpt) ML15337A2602015-08-10010 August 2015 Official Exhibit - NRC000226-00-BD01 - Jeffrey C. Poehler Statement of Professional Qualifications ML15335A2732015-08-10010 August 2015 Official Exhibit - NRC000183-00-BD01 - NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013) ML15335A2202015-08-10010 August 2015 Official Exhibit - ENTR00184-00-BD01 - Curriculum Vitae of Jack R. Strosnider ML15335A3012015-08-10010 August 2015 Official Exhibit - NRC000206-00-BD01 - Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 25, Chapter 14 - Safety Analysis (2014) 2015-09-09
[Table view] |
Text
NRC00221D Submitted: August 10, 2015 B&W Technical Services Group S-1473-002 66 Figure 41 (continued): Macro and stereo photographs of bolt 2400-7 taken at 450 increments.
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: Entergy Nuclear Operations, Inc.
(Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: NRC00221D-00-BD01 Identified: 11/5/2015 Admitted: 11/5/2015 Withdrawn:
Rejected: Stricken:
Other:
B&W Technical Services Group S-1473-002 67 B&W Technical Services Group 5-1473-002 67 icro at 2250 orientation I :Eww *uuL.u iia~
11u 0
Figure 41 (continued): Macro and stereo photographs of bolt 2400-7 taken at 450 increments.
B&W Technical Services Group S-1473-002 68 B&W Technical Services Group S-I 473-002 68 Figure 41 (continued): Macro and stereo photographs of bolt 2400-7 taken at 450 increments.
B&W Technical Services Group S-1473-002 69 cope image Figure 42: Macro and stereo photographs of bolt 300-1 taken at 450 increments.
B&W Technical Services Group S-1473-002 70 B&W Technical Services Group s-I 473-002 70 I
!-1 Macro at 900 orientation at ope image Figure 42 (continued): Macro and stereo photographs of bolt 300°-1 taken at 450 increments.
B&W Technical Services Group S-1473-002 71 B&W Technical Services Group S-I 473-0 02 71 icro at 1800 o ,ntation =Cw IIIIOUW ro at orientation -Itm IIIIOUV Figure 42 (continued): Macro and stereo photographs of bolt 300°-1 taken at 450 increments.
B&W Technical Services Group S-1473-002 72 B&W Technical Services Group S-1473-002 72 cro at 2700 orientation *'1 II*U I I I IIL*I U*IL*U JJIl*
cro at 3156 orientation VIWLP IIII%.Ij Figure 42 (continued): Macro and stereo photographs of bolt 300-1 taken at 450 increments.
B&W Technical Services Group S-1473-002 73 B&W Technical Services Group S-1473-002 73 Figure 43: Wire EDM was used to section each bolt for destructive examinations. The above photo shows initial machining of the threaded region for hardness and tensile testing.
Figure 44: Section photograph for bolt 240°-7 showing the typical locations chosen for subsequent analysis. The five Rockwell C hardness indents are visible on the upper surface of the hardness/tensile blank.
B&W Technical Services Group S-1473-002 74 B&W Technical Services Group S-1473-002 74 Figure 45: ypical location of tensile specirmens machined from each bolt. The IDs of the tested specinhens are shown.
1.000 0.030
-W
-W2k 0.030 W1 = 0.060+/-0.002 (typ. - 4 places) W2 = 0.0005 to 0.0010 greater than W1; with smooth transition from W1 to W2.
Figure 46: Miniature tensile specimen design showing dimensions.
B&W Technical Services Group S-1473-002 75 B&W Technical Services Group S -1473-002 75 Figure 47: Bolt 240-7 after breaking open the crack for SEM/EDS. The two mating halves of the crack are shown. The head side of the fracture (to left) was analyzed by SEMIEDS.
Figure 48: Bolt 300-1 showing plunge cut EDM surface, which removed much of the in-service cracking. Thickness measurements taken around the circumference indicated the EDM was skewed slightly toward the 2700 direction (i.e. to the left in photo).
B&W Technical Services Group S-1473-002 76 B&W Technical Services Group S-I 473-002 76 Figure 49: Macro photograph showing the open crack surface for bolt 120-2. The areas within the white rectangles are shown at higher magnification in the following figures.
B&W Technical Services Group S-1473-002 77 enter oT rigure OU,
B&W Technical Services Group S-1473-002 78 B&W Technical Services Group S-1473-002 79 B&W Technical Services Group S-1473-002 80 B&W Technical Services Group S-I 473-002 80 Figure 56: Macro photograph showing the open crack surface for bolt 120°-6. The areas within the white rectangles are shown at higher magnification in the following figures.
NRC00221D Submitted: August 10, 2015 B&W Technical Services Group S-1473-002 66 Figure 41 (continued): Macro and stereo photographs of bolt 2400-7 taken at 450 increments.
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: Entergy Nuclear Operations, Inc.
(Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: NRC00221D-00-BD01 Identified: 11/5/2015 Admitted: 11/5/2015 Withdrawn:
Rejected: Stricken:
Other:
B&W Technical Services Group S-1473-002 67 B&W Technical Services Group 5-1473-002 67 icro at 2250 orientation I :Eww *uuL.u iia~
11u 0
Figure 41 (continued): Macro and stereo photographs of bolt 2400-7 taken at 450 increments.
B&W Technical Services Group S-1473-002 68 B&W Technical Services Group S-I 473-002 68 Figure 41 (continued): Macro and stereo photographs of bolt 2400-7 taken at 450 increments.
B&W Technical Services Group S-1473-002 69 cope image Figure 42: Macro and stereo photographs of bolt 300-1 taken at 450 increments.
B&W Technical Services Group S-1473-002 70 B&W Technical Services Group s-I 473-002 70 I
!-1 Macro at 900 orientation at ope image Figure 42 (continued): Macro and stereo photographs of bolt 300°-1 taken at 450 increments.
B&W Technical Services Group S-1473-002 71 B&W Technical Services Group S-I 473-0 02 71 icro at 1800 o ,ntation =Cw IIIIOUW ro at orientation -Itm IIIIOUV Figure 42 (continued): Macro and stereo photographs of bolt 300°-1 taken at 450 increments.
B&W Technical Services Group S-1473-002 72 B&W Technical Services Group S-1473-002 72 cro at 2700 orientation *'1 II*U I I I IIL*I U*IL*U JJIl*
cro at 3156 orientation VIWLP IIII%.Ij Figure 42 (continued): Macro and stereo photographs of bolt 300-1 taken at 450 increments.
B&W Technical Services Group S-1473-002 73 B&W Technical Services Group S-1473-002 73 Figure 43: Wire EDM was used to section each bolt for destructive examinations. The above photo shows initial machining of the threaded region for hardness and tensile testing.
Figure 44: Section photograph for bolt 240°-7 showing the typical locations chosen for subsequent analysis. The five Rockwell C hardness indents are visible on the upper surface of the hardness/tensile blank.
B&W Technical Services Group S-1473-002 74 B&W Technical Services Group S-1473-002 74 Figure 45: ypical location of tensile specirmens machined from each bolt. The IDs of the tested specinhens are shown.
1.000 0.030
-W
-W2k 0.030 W1 = 0.060+/-0.002 (typ. - 4 places) W2 = 0.0005 to 0.0010 greater than W1; with smooth transition from W1 to W2.
Figure 46: Miniature tensile specimen design showing dimensions.
B&W Technical Services Group S-1473-002 75 B&W Technical Services Group S -1473-002 75 Figure 47: Bolt 240-7 after breaking open the crack for SEM/EDS. The two mating halves of the crack are shown. The head side of the fracture (to left) was analyzed by SEMIEDS.
Figure 48: Bolt 300-1 showing plunge cut EDM surface, which removed much of the in-service cracking. Thickness measurements taken around the circumference indicated the EDM was skewed slightly toward the 2700 direction (i.e. to the left in photo).
B&W Technical Services Group S-1473-002 76 B&W Technical Services Group S-I 473-002 76 Figure 49: Macro photograph showing the open crack surface for bolt 120-2. The areas within the white rectangles are shown at higher magnification in the following figures.
B&W Technical Services Group S-1473-002 77 enter oT rigure OU,
B&W Technical Services Group S-1473-002 78 B&W Technical Services Group S-1473-002 79 B&W Technical Services Group S-1473-002 80 B&W Technical Services Group S-I 473-002 80 Figure 56: Macro photograph showing the open crack surface for bolt 120°-6. The areas within the white rectangles are shown at higher magnification in the following figures.