Fifth Ten-Year Inservice Inspection (Isi), Response to Request for Additional Information (RAI) for Relief Request No. 2
ML15331A036
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/13/2015
From: Summers T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2015-275
Download: ML15331A036 (3)


Text

F=PLo NOV 1 3 2015 L-2015-275 10 CFR 50.55a U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 RE:

Florida Power and Light Company Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Fifth Ten-Year Inservice Inspection (ISI)

Response to Reauest for Additional Information (RA]) for Relief Request No. 2 By letter L-2015-100, dated June 8, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15177A085), Florida Power & Light Company (FPL) submitted Relief Request 2 (RR-2) for the fifth 10-year inservice inspection intervals for Turkey Point Nuclear Generating Unit Nos. 3 and 4. The subject relief was requested from the Code required examinations on the Regenerative Heat Exchanger shell welds, support welds, and component supports.

On October 1, 2015, via electronic mail, Ms. Audrey Klett, NRC Project Manager for Turkey Point Units 3 and 4, requested additional information regarding RR-2.

The Attachment to this letter contains the NRC's Request for Additional question and the corresponding FPL response.

If you have any questions or require additional information, please contact Mr.

Licensing Manager, at (305) 246-6698.

Sincerely, Thomas Summers Site Vice President Turkey Point Nuclear Plant Attachment cc:

Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Information (RAI)

Mitch Guth, 4>~LF7 Fiorida Power & Li.ght Company 9760 S.W. 344t' Street Homestead, FL 33035

FPL Letter L-201 5-275 Attachment Florida Power & Light Company Turkey Point Nuclear Plant Units 3 and 4 Response to NRC Request for Additional Information (RAI)

Relief Request No. 2

L-201 5-275, Attachment Page 1 of 1 NRC RAI-1:*

The staff notes that RR-2 is a request for approval of an alternative with an acceptable level of quality and safety, pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Paragraph 50.55a(z)(1). However, the discussion in Section 4, "Reason for Request," of the application appears to be a description of hardship, which is pursuant to 10 CER 50.55a(z)(2).

The staff notes that the March 3, 2005, precedent (ADAMS Accession No. ML050350363) referenced in the application is a safety evaluation of the same alternative during the previous (i.e., fourth) ten-year interval for the same regenerative heat exchanger shell welds, support welds, and component supports, and that the alternative was authorized,pursuant to 10 CFR 50.55a(a)(3)(ii) (now 10 CFR 50.55a(z)(2)). The staff requests the licensee to confirm that RR-2 should be considered pursuant to 10 CFR 50.55a(z)(2) instead of 10 CER 50.55a(z)(1).

FPL Response to RAI-1 :

FPL confirms that RR-2 should be considered pursuant to 10 CFR 50.55a(z)(2) instead of 10 CFR 50.55a(z)(1).

F=PLo NOV 1 3 2015 L-2015-275 10 CFR 50.55a U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 RE:

Florida Power and Light Company Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Fifth Ten-Year Inservice Inspection (ISI)

Response to Reauest for Additional Information (RA]) for Relief Request No. 2 By letter L-2015-100, dated June 8, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15177A085), Florida Power & Light Company (FPL) submitted Relief Request 2 (RR-2) for the fifth 10-year inservice inspection intervals for Turkey Point Nuclear Generating Unit Nos. 3 and 4. The subject relief was requested from the Code required examinations on the Regenerative Heat Exchanger shell welds, support welds, and component supports.

On October 1, 2015, via electronic mail, Ms. Audrey Klett, NRC Project Manager for Turkey Point Units 3 and 4, requested additional information regarding RR-2.

The Attachment to this letter contains the NRC's Request for Additional question and the corresponding FPL response.

If you have any questions or require additional information, please contact Mr.

Licensing Manager, at (305) 246-6698.

Sincerely, Thomas Summers Site Vice President Turkey Point Nuclear Plant Attachment cc:

Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Information (RAI)

Mitch Guth, 4>~LF7 Fiorida Power & Li.ght Company 9760 S.W. 344t' Street Homestead, FL 33035

FPL Letter L-201 5-275 Attachment Florida Power & Light Company Turkey Point Nuclear Plant Units 3 and 4 Response to NRC Request for Additional Information (RAI)

Relief Request No. 2

L-201 5-275, Attachment Page 1 of 1 NRC RAI-1:*

The staff notes that RR-2 is a request for approval of an alternative with an acceptable level of quality and safety, pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Paragraph 50.55a(z)(1). However, the discussion in Section 4, "Reason for Request," of the application appears to be a description of hardship, which is pursuant to 10 CER 50.55a(z)(2).

The staff notes that the March 3, 2005, precedent (ADAMS Accession No. ML050350363) referenced in the application is a safety evaluation of the same alternative during the previous (i.e., fourth) ten-year interval for the same regenerative heat exchanger shell welds, support welds, and component supports, and that the alternative was authorized,pursuant to 10 CFR 50.55a(a)(3)(ii) (now 10 CFR 50.55a(z)(2)). The staff requests the licensee to confirm that RR-2 should be considered pursuant to 10 CFR 50.55a(z)(2) instead of 10 CER 50.55a(z)(1).

FPL Response to RAI-1 :

FPL confirms that RR-2 should be considered pursuant to 10 CFR 50.55a(z)(2) instead of 10 CFR 50.55a(z)(1).