Areva Tn - Follow-up Notification of Non-Reportable Condition, Per 10 CFR Part 21
ML15317A386
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 11/05/2015
From: Bondre J, Vesey G
AREVA TN, AREVA
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
E-43746 2015-183
Download: ML15317A386 (1)


Text

AR EVA U.S. Nuclear Regulatory Commission 5 November 2015 ATTN: Document Control Desk E-43746 Washington, DC 20555-0001

Subject:

Follow-up Notification of Non-reportable Condition, per 10 CFR Part 21

References:

1. Letter from Gregory T. Vesey (AREVA) to Document Control Desk (NRC), "Sixty Day Interim Report Notification per 10CFR 21 .21(a)(2)," dated 14 August 2015
2. AREVA TN Corrective Action Report 2015-183 Reference 1 provided the information required for a 60-Day Interim Report Notification per § 21.21(a)(2),

concerning an evaluation being performed by AREVA TN regarding the identification of weld indications on a NUHOMS" 61BTH Type 1 Dry Shielded Canister (DSC) during the Nine Mile Point Nuclear Station spent fuel storage loading campaign. AREVA TN had not concluded that this was a reportable condition in accordance with the requirements of 10CFR 21.21(d) and additional time was required for completion of inspections, determination of a root cause, and evaluation of potentially affected systems.

It was expected at that time that the evaluation of this condition would be completed by 13 November 2015.

The purpose of this letter is to inform the Commission that the evaluation is complete and the situation has been determined to be not reportable under 10 CFR Part 21.

If you have any questions, please feel free to contact our Licensing Manager, Don Shaw, at (410) 910-6878 or myself at (410) 910-6831.

Sincerely, Vice President and Chief Operating Officer AREVA TN For Gregory T. Vesey Senior Vice President AREVA TN CC:

Jayant Bondre Peter Shih Dennis Lang Chris Lloyd Don Shaw I

IC)

AREVA TN AREVA Inc.

71 3. Minstrel Way - .Suite 300 - Columbia, MD 21 045 USA JJfl~4 Tel.: (410O) 910-6900 - Fax: (410O) 91 0-6902 us.areva.com/AREVATN

AR EVA U.S. Nuclear Regulatory Commission 5 November 2015 ATTN: Document Control Desk E-43746 Washington, DC 20555-0001

Subject:

Follow-up Notification of Non-reportable Condition, per 10 CFR Part 21

References:

1. Letter from Gregory T. Vesey (AREVA) to Document Control Desk (NRC), "Sixty Day Interim Report Notification per 10CFR 21 .21(a)(2)," dated 14 August 2015
2. AREVA TN Corrective Action Report 2015-183 Reference 1 provided the information required for a 60-Day Interim Report Notification per § 21.21(a)(2),

concerning an evaluation being performed by AREVA TN regarding the identification of weld indications on a NUHOMS" 61BTH Type 1 Dry Shielded Canister (DSC) during the Nine Mile Point Nuclear Station spent fuel storage loading campaign. AREVA TN had not concluded that this was a reportable condition in accordance with the requirements of 10CFR 21.21(d) and additional time was required for completion of inspections, determination of a root cause, and evaluation of potentially affected systems.

It was expected at that time that the evaluation of this condition would be completed by 13 November 2015.

The purpose of this letter is to inform the Commission that the evaluation is complete and the situation has been determined to be not reportable under 10 CFR Part 21.

If you have any questions, please feel free to contact our Licensing Manager, Don Shaw, at (410) 910-6878 or myself at (410) 910-6831.

Sincerely, Vice President and Chief Operating Officer AREVA TN For Gregory T. Vesey Senior Vice President AREVA TN CC:

Jayant Bondre Peter Shih Dennis Lang Chris Lloyd Don Shaw I

IC)

AREVA TN AREVA Inc.

71 3. Minstrel Way - .Suite 300 - Columbia, MD 21 045 USA JJfl~4 Tel.: (410O) 910-6900 - Fax: (410O) 91 0-6902 us.areva.com/AREVATN