2015 Clinton Power Station Initial License Examination Outline Submittal Letter
ML15314A058
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/09/2015
From:
NRC/RGN-III
To:
Exelon Generation Co
Zoia, C D
Shared Package
ML15124A069 List:
References
Download: ML15314A058 (2)


Text

Exelon Generation Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604192 De c embe r 9 , 20 14 Regional Administrator Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

Submittal of Initial License Training Examination Outline Enclosed are the examination outlines supporting the initial license training examination scheduled for the weeks of March 16, 2015, through March 23, 2015 , at Clinton Power Station (CPS) . This submittal includes all appropriate examination standard forms and outlines in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1.

In accordance with NUREG-1021 , Section ES-201, "I nitial Operator Licensing Examination Process," please ensure that these materials are withheld from public disclosure until after the examinations are complete.

There are no regulatory commitments contained in this letter.

Should you have any questions concerning this letter please contact Mr. Christopher Dunn ,

Director Site Training at (217) 937-4000. For questions concerning examination materials please contact Mr. Tony Jennings, Senior Training Instructor, at (217) 937-3930.

Respectfully,

~ l_1~

~~r~~w~~~r Site Vice President Clinton Power Station ORA/cas

U.S. Nuclear Regulatory Commission U-604192 Page 2 of 2

Enclosures:

(Hand delivered to NRC Region Ill Chief Examiner)

Examination Security Agreements (Form ES-201-3)

Administrative Topics Outline(s) (Form ES-301-1)

Control Room/In-Plant Systems Outline (Form ES-301 -2)

BWR Examination Outline (Forms ES-401-1)

Generic Knowledge and Abilities Outline (Tier 3) (Form ES-401 -3)

Statement detailing method of Written Exam Outline generation Scenario Outlines (Form ES-0-1)

Record of Rejected K/As (Form ES-401-4)

Completed Checklists:

Examination Outline Quality Checklist (Form ES-201-2)

Transient and Event Checklist (Form ES-301-5) cc: Chief, NRC Operator Licensing Branch (without Enclosures)

NRC Senior Resident Inspector - Clinton Power Station (without Enclosures)

NRC Project Manager, NRA - Clinton Power Station (without Enclosures)

Exelon Generation Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604192 De c embe r 9 , 20 14 Regional Administrator Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

Submittal of Initial License Training Examination Outline Enclosed are the examination outlines supporting the initial license training examination scheduled for the weeks of March 16, 2015, through March 23, 2015 , at Clinton Power Station (CPS) . This submittal includes all appropriate examination standard forms and outlines in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1.

In accordance with NUREG-1021 , Section ES-201, "I nitial Operator Licensing Examination Process," please ensure that these materials are withheld from public disclosure until after the examinations are complete.

There are no regulatory commitments contained in this letter.

Should you have any questions concerning this letter please contact Mr. Christopher Dunn ,

Director Site Training at (217) 937-4000. For questions concerning examination materials please contact Mr. Tony Jennings, Senior Training Instructor, at (217) 937-3930.

Respectfully,

~ l_1~

~~r~~w~~~r Site Vice President Clinton Power Station ORA/cas

U.S. Nuclear Regulatory Commission U-604192 Page 2 of 2

Enclosures:

(Hand delivered to NRC Region Ill Chief Examiner)

Examination Security Agreements (Form ES-201-3)

Administrative Topics Outline(s) (Form ES-301-1)

Control Room/In-Plant Systems Outline (Form ES-301 -2)

BWR Examination Outline (Forms ES-401-1)

Generic Knowledge and Abilities Outline (Tier 3) (Form ES-401 -3)

Statement detailing method of Written Exam Outline generation Scenario Outlines (Form ES-0-1)

Record of Rejected K/As (Form ES-401-4)

Completed Checklists:

Examination Outline Quality Checklist (Form ES-201-2)

Transient and Event Checklist (Form ES-301-5) cc: Chief, NRC Operator Licensing Branch (without Enclosures)

NRC Senior Resident Inspector - Clinton Power Station (without Enclosures)

NRC Project Manager, NRA - Clinton Power Station (without Enclosures)