Exelon Nuclear Job Performance Measure REVIEW ACCEPTANCE CRITERIA MET FOR THE ACCOUSTIC MONITOR JPM Number: A-N-1-R Revision Number: 04 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-1-R Page 2 of 7 Revision Record (Summary)
Revision 02 Bank JPM.
Revision 03 Revised for ILT 09-1 NRC Exam.
Revision 04 Revised for ILT 14-1 NRC Exam.
A-N-1-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Mark up a copy of DOS 0250-06, Acoustic Monitor Temperature Detector Instrument (Channel) Check.
A-N-1-R Page 4 of 7 INITIAL CONDITIONS
- 1. You are the Unit 3 Aux NSO.
- 2. DOS 0250-06 was performed last shift, for the Acoustic Monitor / Temperature Detector Operability Test.
- 3. The off-going NSO was unable to verify the paperwork, and has turned it over to you.
- 4. The NSO reported all surveillance requirements were within specifications INITIATING CUE
- 1. Verify ALL requirements are within specifications, and paperwork is correct.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-1-R Page 5 of 7 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the Examinee with the supplied copy of DOS 0250-06.
- 1.
Examinee should identify data sheet valve 203-3C threshold volt is out of spec.
Identifies out of spec value.
- 2.
Examinee should identify data sheet valve 203-4A threshold volt is out of spec.
Identifies out of spec value.
- 3.
Examinee should identify data sheet valve 203-3D H-19 in Alarm AND Alarm Reset steps that should NOT be N/Ad.
Identifies N/Ad step.
- 4.
Examinee should identify data sheet valves 203-3B and 203-4G discharge temps are
> 100oF difference.
Identifies 2 temperatures >
100oF difference.
- 5.
Examinee should either report discrepancies to Unit Supervisor OR sign the Calculations Verified By line.
Reports discrepancies to Unit Supervisor OR signs the Calculations Verified By line.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-1-R Page 6 of 7 Operators Name:
Job
Title:
Title:
REVIEW ACCEPTANCE CRITERIA MET FOR THE ACCOUSTIC MONITOR Revision Number: 04 JPM Number: A-N-1-R Task Number and
Title:
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures.
K/A Number and Importance: Generic.2.1.7 4.4 / 4.7 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 10 minutes Actual Time Used:
minutes
References:
DOS 0250-06, rev 14 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-1-R Page 7 of 7 INITIAL CONDITIONS
- 1. You are the Unit 3 Aux NSO.
- 2. DOS 0250-06 was performed last shift, for the Acoustic Monitor /
Temperature Detector Operability Test.
- 3. The off-going NSO was unable to verify the paperwork, and has turned it over to you.
- 4. The NSO reported all surveillance requirements were within specifications INITIATING CUE
- 1. Verify ALL requirements are within specifications, and paperwork is correct.
Exelon Nuclear Job Performance Measure PERFORM ASSIST NSO DAILY LOG FOR U1 AND 2/3 CONDENSATE STORAGE TANKS INVENTORY CALCULATIONS JPM Number: A-N-2-R Revision Number: 01 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-2-R Page 2 of 8 Revision Record (Summary)
Revision 00 Modified for 2013 Cert Exam.
Revision 01 Modified for 14-1 NRC Exam.
A-N-2-R Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1.
Reset the simulator to any IC, with the following conditions:
- a.
2/3A CST level is 15 ft.
- b.
2/3B CST level is 16 ft.
DOCUMENT PREPARATION
- 1. Provide a clean copy of Appendix B, ASSIST NSO DAILY SURVEILLANCE LOG, Attachment A, page 19.
- 2. Photo of the 2/3 CST level meters on the 902-6 panel.
A-N-2-R Page 4 of 8 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Both units are operating at near rated power.
- 3. Today is Monday shift 1.
- 4. Unit 1A CST level is 26%.
INITIATING CUE
- 1. The Unit Supervisor has directed you to complete Appendix B, Attachment A, page 19, for the Unit 1 and 2/3 Condensate Storage Tanks Inventory.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-2-R Page 5 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the supplied copy of Appendix B, Attachment A.
Do NOT provide the supplied photo until correct meters are identified.
- 1.
Examinee identifies and utilizes the Monday shift 1 slot.
Fills out all values on the Monday shift 1 slot.
- 2.
Records value of 26% for U1A CST in INDICATED LEVEL column.
See attached KEY.
CUE:
When examinee locates correct meters, provide the supplied photo of the meters.
- 3.
Locates meters, on the 902-6 panel, for 2/3A and 2/3B CSTs and records correct value in INDICATED LEVEL column:
2/3A CST 15.0 2/3B CST 16.0 See attached KEY.
- 4.
Examinee calculates values and records them in CORRECTED LEVEL column:
U1A CST 19.0 2/3A CST 13.0 2/3B CST 14.0 See attached KEY.
- 5.
Examinee calculates values and records them in ACTUAL LEVEL column:
U1A CST 38,000 2/3A CST 104,000 2/3B CST 112,000 See attached KEY.
A-N-2-R Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 6.
Examinee calculates value and records it in TOTAL CST GALLONS block:
Total: 254,000 See attached KEY.
- 7.
Examinee identifies that TOTAL GALLONS are
<260,000 (130,000 per each unit).
Examinee notifies the Unit Supervisor of value and that minimum required inventory is not met.
- 8.
Informs Unit Supervisor Independent verification is required and task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-2-R Page 7 of 8 Operators Name:
Job
Title:
Title:
PERFORM ASSIST NSO DAILY LOG FOR U1 AND 2/3 CONDENSATE STORAGE TANKS INVENTORY CALCULATIONS.
Revision Number: 01 JPM Number: A-N-2-R Task Number and
Title:
29800LP013, Perform the duties of a Unit NSO including monitoring the unit, answering the phones and radio, completing logs, surveillances, and daily sheets, and filling out and conducting a shift turnover.
K/A Number and Importance: Generic.2.1.18 3.6 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 10 minutes Actual Time Used:
minutes
References:
Appendix B, rev 80 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-2-R Page 8 of 8 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Both units are operating at near rated power.
- 3. Today is Monday shift 1.
- 4. Unit 1A CST is 26%.
INITIATING CUE
- 1. The Unit Supervisor has directed you to complete Appendix B, Attachment A, page 19, for the Unit 1 and 2/3 Condensate Storage Tanks Inventory.
- 2. Inform the Unit Supervisor when the task is complete.
A-N-3-R Page 1 of 8 Exelon Nuclear Job Performance Measure VERIFY VALVE OPERABILITY AND TIMING JPM Number: A-N-3-R Revision Number: 00 Date: 12/14 Developed By:
Instructor Date Approved By:
Training Department Date
A-N-3-R Page 2 of 8 Revision Record (Summary)
Revision 00 New JPM for ILT 14-1 NRC Exam
A-N-3-R Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS Use any IC that accommodates other JPMs.
This is a table top JPM utilizing Simulator procedures.
Verify the DISACM is available.
PROCEDURE PREPARATION Mark up a copy of DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, as follows:
o Indicate that testing is complete for step I.6. Leave the other steps blank.
o For MO 2-1601-24, enter a close stroke time in the ALERT range of the DISACM.
o For MO 2-1601-23, enter a close stroke time in the REQUIRED ACTION range of the DISACM.
o For ALL other step I.6 valves, enter a time within the ACCEPTABLE range.
Provide a copy of ER-AA-321, Administrative Requirements for Inservice Testing.
A-N-3-R Page 4 of 8 INITIAL CONDITIONS You are the Unit 2 Aux NSO.
An extra NSO just completed surveillance DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, step I.6 only at this time. The other steps will be performed later.
INITIATING CUE Per step H.3.a of DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, review the completed portion of the surveillance and report to the Unit Supervisor the results of your review.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information for Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
- (Filled bullet) indicates a CRITICAL part of the step.
o (Open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The time clock starts when the candidate acknowledges the initiating cue.
A-N-3-R Page 5 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
- 1. Evaluate valve performance by comparing the Actual Stroke Time to the established IST ranges listed in the DISACM.
Reviews Checklist 1, UNIT 2 QUARTERLY VALVE TIMING and determines the following:
MO 2-1601-24 stroke close time is in the ALERT range of the DISACM.
- 2. Evaluate valve performance by comparing the Actual Stroke Time to the established IST ranges listed in the DISACM.
Reviews Checklist 1, UNIT 2 QUARTERLY VALVE TIMING and determines the following:
MO 2-1601-23 stroke close time is in the REQUIRED ACTION range of the DISACM.
- 3. Notify Unit Supervisor of above results Notifies Unit Supervisor of above results Cue:
As the Unit Supervisor, direct examinee to determine required actions per ER-AA-321 Attachment 2.
- 4. Per Acceptance Criteria, refer to ER-AA-321,, and determine that MO 2-1601-24 should be restroked.
Per Acceptance Criteria, refers to ER-AA-321, Attachment 2, and determines that MO 2-1601-24 should be restroked.
- 5. Per Acceptance Criteria and ER-AA-321,,
determine that MO 2-1601-23 should be declared inoperable.
Per Acceptance Criteria and ER-AA-321, Attachment 2, determines that MO 2-1601-23 should be declared inoperable.
A-N-3-R Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
- 6. Notify Unit Supervisor of above results Notifies Unit Supervisor of above results:
MO 2-1601-24 should be restroked.
MO 2-1601-23 should be declared inoperable.
- 7. Notify the Unit Supervisor that step H.3.a is complete and the task is complete.
- 8. Notifies the Unit Supervisor that step H.3.a is complete and the task is complete.
Cue:
As the Unit Supervisor, acknowledge report.
END JPM Stop Time:_________
A-N-3-R Page 7 of 8 Operators Name: ___________________________________
Job
Title:
Title:
VERIFY VALVE OPERABILITY AND TIMING JPM Number: A-N-3-R Revision Number:
00 Task Number and
Title:
298L057, Perform an operability check of the following pieces of equipment: MO/AO Valves.
K/A Number and Importance: 2.2.14 3.9/4.3 Suggested Testing Environment:
Simulator Actual Testing Environment:
Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
15 minutes Actual Time Used: _______minutes
References:
DOS 1600-03, R 51, UNIT 2 QUARTERLY VALVE TIMING Dresden In-Service Testing Acceptance Criteria Manual (DISACM)
ER-AA-321 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-3-R Page 8 of 8 INITIAL CONDITIONS You are the Unit 2 Aux NSO.
An extra NSO just completed surveillance DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, step I.6 only for Post Maintenance testing. The other steps will be performed later.
INITIATING CUE Per step H.3.a of DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, review the completed portion of the surveillance and report to the Unit Supervisor the results of your review.
Exelon Nuclear Job Performance Measure DETERMINE RADIOLOGICAL BRIEF AND PROTECTIVE CLOTHING REQUIREMENTS JPM Number: A-N-4-R Revision Number: 00 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-4-R Page 2 of 7 Revision Record (Summary)
Revision 00 New for Dresden ILT 14-1 exam.
A-N-4-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Provide a copy of RP-AA-460
- 2. Copy of survey map for Unit 3 Reactor Building, El. 545 RWCU Pump Room
- 3. Copy of RWP# 10004555, U3 RWCU pump room.
A-N-4-R Page 4 of 7 INITIAL CONDITIONS
- 1. You are the Unit 3 Aux NSO.
- 2. Following maintenance, it was reported that valve 3-1201-128A, 3A RWCU RECIRC PMP SUCT VLV, appeared to have packing leakage.
- 3. The Unit Supervisor is unable to obtain any more information regarding the packing leakage.
INITIATING CUE
- 1. The Unit Supervisor has directed you to determine the radiological controls needed (if any) to investigate the leakage on 3-1201-128A.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-4-R Page 5 of 7 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
WHEN the examinee asks RP for the survey map of the area, THEN provide the map attached to this JPM.
WHEN the examinee asks RP for the RWP for the job THEN provide RWP 10004555 attached to this JPM.
If the examinee asks for the procedure for Control of High and Very High Radiation Areas, RP-AA-460, provide them with a copy.
- 1.
Examinee reviews RWP and survey map and determines protective clothing requirement.
Determines the following minimum protective clothing requirements:
Zone 2 Protective Clothing Modesty garments Cloth hood or half hood Cloth coveralls Cloth shoe covers Shoe rubbers Glove liners Rubber gloves
- 2.
Examinee reviews RWP and RP-AA-460 and determines briefing requirements to enter a Locked High Rad Area (IAW RP-AA-460 step 4.4.2)
Determines a Locked High Rad Area brief from Radiation Protection is required.
- 3.
Informs the Unit Supervisor of clothing and briefing requirements Informs Unit Supervisor of the information in steps 1 and 2.
- 4.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-4-R Page 6 of 7 Operators Name:
Job
Title:
Title:
Determine Radiological Brief and protective clothing requirements Revision Number: 00 JPM Number: A-N-4-R Task Number and
Title:
299L029, Conduct shift operations K/A Number and Importance: Generic.2.3.7 3.5 / 3.6 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 20 minutes Actual Time Used:
minutes
References:
RP-AA-460 Rev. 26 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-4-R Page 7 of 7 INITIAL CONDITIONS
- 1. You are the Unit 3 Aux NSO.
- 2. Following maintenance, it was reported that valve 3-1201-128A, 3A RWCU RECIRC PMP SUCT VLV, appeared to have packing leakage.
- 3. The Unit Supervisor is unable to obtain any more information regarding the packing leakage.
INITIATING CUE
- 1. The Unit Supervisor has directed you to determine the radiological controls needed (if any) to investigate the leakage on 3-1201-128A.
- 2. Inform the Unit Supervisor when the task is complete.
S-RD-11 Page 1 of 8 Exelon Nuclear Job Performance Measure Reportability Determination JPM Number: A-N-1-S Revision Number: 01 Date: 01/15 Developed By:
Developer Date Validated By:
SME or Instructor Date Review By:
Operations Representative Date Approved By:
Training Department Date
S-RD-10 Job Performance Measure (JPM)
Page 2 of 8 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
- 1.
Task description and number, JPM description and number are identified.
- 2.
Knowledge and Abilities (K/A) references are included.
- 3.
Performance location specified. (in-plant, control room, simulator, or other)
- 4.
Initial setup conditions are identified.
- 5.
Initiating cue (and terminating cue if required) are properly identified.
- 6.
Task standards identified and verified by SME review.
- 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
- 8.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure LS-AA-1120 Rev: 18 Procedure Rev:
Procedure Rev:
- 9.
Verify cues both verbal and visual are free of conflict.
- 10. Verify performance time is accurate
- 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date
S-RD-10 Job Performance Measure (JPM)
Page 3 of 8 Revision Record (Summary)
Revision 00 New JPM created for 2013 LORT Exam.
Revision 01 Revised for use on 2015 ILT Exam.
S-RD-10 Job Performance Measure (JPM)
Page 4 of 8 SIMULATOR SETUP INSTRUCTIONS Any IC to accommodate other JPMs.
This is a table top JPM utilizing Simulator procedures.
S-RD-10 Job Performance Measure (JPM)
Page 5 of 8 INITIAL CONDITIONS An event has occurred at Dresden resulting in the following conditions:
- A worker has been injured.
- The individual is contaminated, and must be transported to the hospital immediately.
- You are the Unit Supervisor.
INITIATING CUE
- 1. Determine the Reportability requirements, including the Event Classification and the Time Limit of any Notifications or Reports.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
Operator Fundamentals: During this JPM, the evaluator should look at the Operators performance of the task in regards to the following SER 3-05 Operator Fundamentals.
Monitoring Plant Conditions and Indications Closely Know and monitor critical parameters Understand limitations/design of indications Use multiple indications Give attention to detail Uses procedures, clearances, or other documents to change plant configuration Do not deviate from procedures Uses error reduction techniques effectively Have a low problem threshold
S-RD-10 Job Performance Measure (JPM)
Page 6 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
- 1.
Determines the event is reportable per RAD 1.6 Determines the event is reportable per RAD 1.6 Transport of contaminated person to Medical Facility
- 2.
Determines the time limit to make a phone report is 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to NRC Determines the time limit to make a phone report is 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to NRC.
END JPM Stop Time:_________
S-RD-10 Job Performance Measure (JPM)
Page 7 of 8 Operators Name: ___________________________________
Job
Title:
Title:
Reportability Determination JPM Number: A-N-1-S Revision Number:
01 Task Number and
Title:
299L001, Determine Reportability requirements as outlined in station Reportability manual.
K/A Number and Importance: 2.1.1
--/4.2 Suggested Testing Environment:
Simulator Actual Testing Environment:
Simulator Plant Control Room Testing Method: Simulate SRO Only: Yes No Perform Alternate Path: Yes No Time Critical:
Yes No Estimated Time to Complete:
10 minutes Actual Time Used: _______minutes
References:
LS-AA-1120 rev 18 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
S-RD-10 Job Performance Measure (JPM)
Page 8 of 8 INITIAL CONDITIONS An event has occurred at Dresden resulting in the following conditions:
- A worker has been injured.
- The individual is contaminated, and must be transported to the hospital immediately.
- You are the Unit Supervisor.
INITIATING CUE
- 2. Determine the Reportability requirements, including the Event Classification and the Time Limit of any Notifications or Reports.
Exelon Nuclear Job Performance Measure DETERMINATION OF ON LINE RISK JPM Number: A-N-2-S Revision Number: 00 Date: 01/15 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-2-S Page 2 of 8 Revision Record (Summary)
Revision 00 New JPM for 2015 NRC exam.
A-N-2-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1.
Simulator Center Desk computer cleared and available.
DOCUMENT PREPARATION
- 1. None.
A-N-2-S Page 4 of 8 INITIAL CONDITIONS
- 1. You are the Unit 3 Supervisor.
- 2. Unit 2 and Unit 3 are at near rated power.
- 3. The 345kv BT CB 8-15 has failed open and will take 2 days to repair.
- 4. The U3 Isolation Condenser is scheduled to come OOS the next shift.
INITIATING CUE
- 1. The Shift Manager requests that you run Paragon to determine the current On-line Risk;
- AND,
- 2. Determine the fire risk if the Isolation Condenser work is allowed.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-2-S Page 5 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Have center desk computer up and on the desktop screen
- 1.
Enter Paragon.
Clicks on the ICON for Paragon.
CUE:
When asked login is simcr, and no password is required
- 2.
Select Operations Module Selects Operations Module when 3 options are on screen
- 3.
Selects Switchyard Tab, then significant breakers.
Clicks on Switchyard tab and then clicks on significant breakers.
- 4.
Select OCB 8-15 and selects unavailable.
Clicks on OCB 8-15, then clicks on unavailable,
- 5.
Select Execute. Determine that On-line is YELLOW.
Runs program identifies On-line risk is YELLOW.
- 6.
Select ECCS Tab.
Clicks on ECCS Tab.
- 7.
Select Isolation Condenser, then unavailable.
Clicks on Isolation Condenser, then clicks on unavailable.
- 8.
Select Execute. Determine that fire risk is YELLOW if Isolation Condenser is taken OOS.
Runs program and identifies fire risk is YELLOW if Isolation Condenser is taken OOS.
A-N-2-S Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 8.
Report to Shift Manager that current On-Line Risk is YELLOW and fire risk will be YELLOW if the Isolation Condenser work is allowed.
Reports to Shift Manager that current On-Line Risk is YELLOW and fire risk will be YELLOW if the Isolation Condenser work is allowed.
CUE:
Acknowledge the report END JPM Stop Time:_________
A-N-2-S Page 7 of 8 Operators Name:
Job
Title:
Title:
REVIEW OFF-SITE POWER SOURCES AVAILABLE PAPERWORK Revision Number: 00 JPM Number: A-N-2-S Task Number and
Title:
CM198081 Determine on line risk and protected pathway equipment per WC
-AA-101, OP-AA-117, and OP-DR-108-117-1001.
K/A Number and Importance: Generic.2.1.19 3.9/3.8 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes
References:
WC-AA-101 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-2-S Page 8 of 8 INITIAL CONDITIONS
- 1. You are the Unit 3 US.
- 2. Unit 2 and Unit 3 are at near rated power.
- 3. The 345kv BT CB 8-15 has failed open and will take 2 days to repair.
- 4. The U3 Isolation Condenser is scheduled to come OOS the next shift.
INITIATING CUE
- 1. The Shift Manager request that you run Paragon to determine current On-line Risk;
- AND,
- 2. Determine the fire risk if the Isolation Condenser work is allowed.
Exelon Nuclear Job Performance Measure DECLARE EDG OPERABLE AFTER SURVEILLANCE REVIEW JPM Number: A-N-3-S Revision Number: 01 Date: 01/15 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-3-S Page 2 of 8 Revision Record (Summary)
Revision 00 Modified JPM for ILT 12-1 (2013-301) NRC Exam.
Revision 01 Revise for ILT 14-1 NRC Exam.
A-N-3-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Provide a marked up copy of DOS 6600-01
A-N-3-S Page 4 of 8 INITIAL CONDITIONS
- 1. You are the Unit 3 Unit Supervisor.
- 2. The Unit 3 EDG was run for a normal even month surveillance.
- 3. No maintenance was performed on the Unit 3 EDG.
- 4. The Unit 3 NSO has completed DOS 6600-01, DIESEL GENERATOR SURVEILLANCE TESTS for the Unit 3 EDG.
INITIATING CUE
- 1. Verify the Unit 3 EDG surveillance has been completed correctly.
- 2. Review the surveillance and determine the operability of the Unit 3 EDG.
- 3. Inform the Shift Manager when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-3-S Page 5 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the supplied copy of DOS 6600-01 NOTE:
Other unidentified errors exist. Only items marked as critical are required.
- 1.
Verify D/G has operated for
> 60 minutes with a load of 2340 to 2600 kW Recognizes that the diesel ran for less than 60 minutes. Acceptance criteria not met.
- 2.
Diesel fuel oil day tank level >
29.5 inches (for U2 or U3 EDG)
Recognizes that Diesel fuel oil day tank level is less than 29.5 inches Acceptance criteria not met.
- 3.
Verify D/G START AIR A1/A2 RECEIVER TANK pressure in Step 3.a.(16) is greater than D/G START AIR B1/B2 RECEIVER TANK in Step 3.a.(16)
Recognizes that A1/A2 RECEIVER TANK pressure is not greater than B1/B2 RECEIVER TANK pressure.
Acceptance criteria not met.
- 4.
IF air pressure between banks has equalized, THEN initiate an Issue Report to repair check valve.
Recognizes that an issue report needs to be generated to repair the check valve.
- 5.
Verify A compressor stops between 245 and 260 psig.
Recognizes that the A compressor stopped > 260 psig.
- 6.
IF Compressor A OR "B" stop pressures are NOT within expected range (224 to 260 psig), THEN contact the Plant Engineering System Manager AND initiate an Issue Report.
Recognizes that compressor A did not stop within the expected range (265 psig), the System Engineer needs to be contacted.
A-N-3-S Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 7.
Notify System Engineer that A compressor did not stop at the expected band.
Notifies System Engineer that A compressor did not start at the expected band.
- 8.
Declare D/G Operable Recognizes that the Acceptance Criteria for the Unit 3 EDG is not met and determines the EDG is inoperable.
- 9.
Informs Shift Manager task is complete.
Examinee notifies the Shift Manager.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-3-S Page 7 of 8 Operators Name:
Job
Title:
Title:
DECLARE EDG OPERABLE AFTER SURVEILLANCE REVIEW Revision Number: 01 JPM Number: A-N-3-S Task Number and
Title:
264L009, Perform Surveillance Testing K/A Number and Importance: Generic 2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes
References:
DOS 6600-01, rev 127 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-3-S Page 8 of 8 INITIAL CONDITIONS
- 1. You are the Unit 3 Unit Supervisor.
- 2. The Unit 3 EDG was run for a normal even month surveillance.
- 3. No maintenance was performed on the Unit 3 EDG.
- 4. The Unit 3 NSO has completed DOS 6600-01, DIESEL GENERATOR SURVEILLANCE TESTS for the Unit 3 EDG.
INITIATING CUE
- 1. Verify the Unit 3 EDG surveillance has been completed correctly.
- 2. Review the surveillance and determine the operability of the Unit 3 EDG.
- 3. Inform the Shift Manager when the task is complete.
Exelon Nuclear Job Performance Measure SELECT PERSONNEL FOR RADIATION WORK JPM Number: A-N-4-S Revision Number: 00 Date: 01/15 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-4-S Page 2 of 10 Revision Record (Summary)
Revision 00 Modified JPM for ILT 12-1 (2013-301) NRC Exam.
Revision 01 Revised for ILT 14-1 NRC Exam.
A-N-4-S Page 3 of 10 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 2. Markup a survey map for the Unit 3 RWCU Pump Room.
- 3. Clean copy of RP-AA-203.
A-N-4-S Page 4 of 10 INITIAL CONDITIONS
- 1. You are a Unit Supervisor and will be briefing NLOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555.
- 2. Five NLOs are available this shift.
- None of the five have received dose at any location other than Dresden Station.
- None of the five have received dose since midnight on any RWPs other than 10004555.
- 3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five NLOs to assist you in your planning:
Name DDE dose received on RWP 10004555 Today Annual TEDE dose To Date Alex 40 mrem 1550 mrem Dan 5 mrem 1950 mrem Mike 0 mrem 1920 mrem Sue 45 mrem 1850 mrem Tom 10 mrem 1750 mrem
- 4. The total expected stay time for each NLO will be 60 minutes. Based on past job history, it will breakdown as follows:
- 45 minutes total in the area near the following two valves:
3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)
- 15 minutes total in the area near the following one valve:
3-1201-128A A RWCU Pump Suction (at A RWCU Pump)
INITIATING CUE
- 1. CALCULATE the expected dose for the work in RWCU Pump Room. DETERMINE which NLO(s) CAN and which NLO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.
A-N-4-S Page 5 of 10 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-4-S Page 6 of 10 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the supplied copy of the RWP and survey map of the RWCU pump room and the supplied copy of RP-AA-203.
The following steps may be performed in any order.
- 1.
Reviews Survey Maps to determine area dose rates.
Reviews the survey maps and determines area dose rates to be 50 mr/hr for the first group of 2 valves and 160 mr/hr for the remaining valve.
NOTE:
The following calculations should be made:
2 valve clearance projected dose = 0.75 hr x 40 mr/hr = 30 mrem 1 valve clearance projected dose = 0.25 hr x 140 mr/hr = 35 mrem Total projected dose for the job = 40 mrem + 30 mrem = 65 mrem
- 2.
Calculates that the projected dose that will be received for the task is 65 mrem.
Determines the NLOs will receive 30 mrem on the first 2 valves and 35 on the next valve.
CUE:
IF the candidate inquires whether or not any of the NLOs has received permission to exceed any dose limits, respond: None of the Non Licensed Operators have received permission to exceed any limits.
NOTE:
The following steps may be performed in any order.
- 3.
Determines that ALEX CAN NOT perform the job because he would exceed the 80 mrem dose alarm on RWP 10004555.
Alexs total daily dose on RWP 10004555 would be 105 mrem.
A-N-4-S Page 7 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 4.
Determines that Dan CAN NOT perform the job because he would exceed the 2000 mrem Exelon Annual limit.
Dans total Annual dose would be 2015 mrem.
- 5.
Determines that Mike CAN perform the job because no limits will be exceeded.
Mikes total RWP daily dose and Annual dose will remain below the limits.
- 6.
Determines that Sue CAN NOT perform the job because she would exceed the 80 mrem dose alarm on RWP 10004555.
Sues total daily dose on RWP 10004555 would be 110 mrem.
- 7.
Determines that Tom CAN perform the job because no limits will be exceeded.
Toms total RWP daily dose and Annual dose will remain below the limits.
END JPM Stop Time:_________
A-N-4-S Page 8 of 10 Operators Name:
Job
Title:
Title:
SELECT PERSONEL FOR RADIATION WORK Revision Number: 01 JPM Number: A-N-4-S Task Number and
Title:
29900LK119, Discuss the items to be considered prior to work authorization K/A Number and Importance: Generic.2.3.13 3.4 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 10 minutes Actual Time Used:
minutes
References:
RP-AA-203, rev 03 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-4-S Page 9 of 10 KEY EVALUATOR: The candidate must determine that dose for the task will be 65 mrem and determine that only two NLOs can receive the dose, necessary to complete the task. They are Mike and Tom. See the table below for projected job dose, 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> total dose on RWP 10004555, and total Annual TEDE dose for each Operator.
Calculation:
2 valves clearance (at RWCU Aux Pump) projected dose = 0.75 hr x 40 mr/hr =
30mrem 1 valve clearance (at A RWCU Pump) projected dose = 0.25hr x 140 mr/hr =
35mrem 30mrem + 35 mrem = 65 mrem projected job dose for clearance order hanging Name DDE dose received on RWP 10004555 today Annual TEDE dose as of Midnight To Date Projected dose on RWP 10004555 for the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period Projected Annual TEDE (including all dose from last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)
Alex 40 mrem 1550 mrem (40 + 65 =)
105 mrem (1550 + 65 =)
1615 mrem Dan 5 mrem 1950 mrem (5 + 65 =)
70 mrem (1950 + 65 =)
2015 mrem Mike 0 mrem 1920 mrem (0 + 65 =)
65 mrem (1920 + 65 =)
1985 mrem Sue 45 mrem 1850 mrem (45 + 65 =)
110 mrem (1850 + 65 =)
1915 mrem Tom 10 mrem 1750 mrem (10 + 65 =)
75 mrem (1750 + 65 =)
1815 mrem The bolded values in the table exceed the applicable Company, RWP, or 10CFR limit.
A-N-4-S Page 10 of 10 INITIAL CONDITIONS
- 1. You are a Unit Supervisor and will be briefing NLOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555.
- 2. Five NLOs are available this shift.
- None of the five have received dose at any location other than Dresden Station.
- None of the five have received dose since midnight on any RWPs other than 10004555.
- 3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five NLOs to assist you in your planning:
Name DDE dose received on RWP 10004555 Today Annual TEDE dose To Date Alex 40 mrem 1550 mrem Dan 5 mrem 1950 mrem Mike 0 mrem 1920 mrem Sue 45 mrem 1850 mrem Tom 10 mrem 1750 mrem
- 4. The total expected stay time for each NLO will be 60 minutes. Based on past job history, it will breakdown as follows:
- 45 minutes total in the area near the following two valves:
3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)
- 15 minutes total in the area near the following one valve:
3-1201-128A A RWCU Pump Suction (at A RWCU Pump)
INITIATING CUE
- 1. CALCULATE the expected dose for the work in RWCU Pump Room.
DETERMINE which NLO(s) CAN and which NLO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.
Exelon Nuclear Job Performance Measure DETERMINE EMERGENCY CLASSIFICATION AND FILL OUT NARS FORM JPM Number: A-N-5-S Revision Number: 01 Date: 01/15 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-5-S Page 2 of 8 Revision Record (Summary)
Revision 00 New JPM developed for.........
Revision 01 Revised for ILT 14-1 NRC
A-N-5-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Screenshot of meteorological data.
A-N-5-S Page 4 of 8 INITIAL CONDITIONS
- 1. This is a time critical JPM.
- 2. You are the Shift Emergency Director.
- 3. Unit 2 was operating at near rated conditions when a transient occurred causing ALL high pressure feed to be lost and RPV water level dropped to -20 inches.
- 4. An automatic scram did NOT occur.
- 5. The Unit 2 NSO initiated a manual scram and initiated ARI.
- 6. One (1) minute after the manual scram was initiated, the following conditions exist:
- SBLC is injecting with one pump.
- Drywell pressure is 2.5 psig and steady.
- Drywell temperature is 138oF and steady.
- Torus temperature is 117oF and rising slowly.
- RPV Pressure is 920 psig and dropping slowly.
- Reactor power is 10% and steady on the APRMs.
- RPV water level is -170 inches and dropping rapidly.
INITIATING CUES
- 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.
A-N-5-S Page 5 of 8 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-5-S Page 6 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Examinee locates a copy of Radiological Emergency Plan Annex for Dresden EP-AA-1004 charts.
Provide the supplied NARS Form.
Provide the supplied screen shot of the meteorological data.
- 1.
Determines a classification of GENERAL EMERGENCY, due to a the failure of an automatic AND manual scram AND there is an indication of an extreme challenge to the ability to cool the core.
Determines highest classification is a SITE EMERGENCY per EAL MS2 (15 minute requirement).
NOTE:
Determines classification start time _______ and stop time _______.
(15 minute limit)
NOTE:
Automatic scram, manual scram, and ARI were not successful from Reactor Console Reactor power is 17% on the APRMs AND RPV water level is -182 inches and dropping rapidly with NO high pressure feed available
- 2.
Properly fills out NARS form.
See attached key for the areas that must be filled out correctly (13 minute requirement):
NOTE:
Fill out NARS form start time (when declaration completed) _______ and stop time _______.
(13 minute limit)
END JPM Stop Time:_________
A-N-5-S Page 7 of 8 Operators Name:
Job
Title:
Title:
DETERMINE EMERGENCY CLASSIFICATION and fill out nars form Revision Number: 01 JPM Number: A-N-5-S Task Number and
Title:
- 295L160, Given a plant in an off normal condition, determine the EP classification K/A Number and Importance: Generic.2.4.44 2.4 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 (declare) 13 (fill out) minutes Actual Time Used:
minutes
References:
EP-AA-1004, Addendum 3, Rev 00 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-5-S Page 8 of 8 INITIAL CONDITIONS
- 1. This is a time critical JPM.
- 2. You are the Shift Emergency Director.
- 3. Unit 2 was operating at near rated conditions when a transient occurred causing ALL high pressure feed to be lost and RPV water level dropped to -
20 inches.
- 4. An automatic scram did NOT occur.
- 5. The Unit 2 NSO initiated a manual scram and initiated ARI.
- 6. One (1) minute after the manual scram was initiated, the following conditions exist:
- SBLC is injecting with one pump.
- Drywell pressure is 2.5 psig and steady.
- Drywell temperature is 138oF and steady.
- Torus temperature is 117oF and rising slowly.
- RPV Pressure is 920 psig and dropping slowly.
- Reactor power is 10% and steady on the APRMs.
- RPV water level is -170 inches and dropping rapidly.
INITIATING CUES
Give the NARS form to the WEC Supervisor, who will make the state notification.
Exelon Nuclear Job Performance Measure REVIEW ACCEPTANCE CRITERIA MET FOR THE ACCOUSTIC MONITOR JPM Number: A-N-1-R Revision Number: 04 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-1-R Page 2 of 7 Revision Record (Summary)
Revision 02 Bank JPM.
Revision 03 Revised for ILT 09-1 NRC Exam.
Revision 04 Revised for ILT 14-1 NRC Exam.
A-N-1-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Mark up a copy of DOS 0250-06, Acoustic Monitor Temperature Detector Instrument (Channel) Check.
A-N-1-R Page 4 of 7 INITIAL CONDITIONS
- 1. You are the Unit 3 Aux NSO.
- 2. DOS 0250-06 was performed last shift, for the Acoustic Monitor / Temperature Detector Operability Test.
- 3. The off-going NSO was unable to verify the paperwork, and has turned it over to you.
- 4. The NSO reported all surveillance requirements were within specifications INITIATING CUE
- 1. Verify ALL requirements are within specifications, and paperwork is correct.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-1-R Page 5 of 7 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the Examinee with the supplied copy of DOS 0250-06.
- 1.
Examinee should identify data sheet valve 203-3C threshold volt is out of spec.
Identifies out of spec value.
- 2.
Examinee should identify data sheet valve 203-4A threshold volt is out of spec.
Identifies out of spec value.
- 3.
Examinee should identify data sheet valve 203-3D H-19 in Alarm AND Alarm Reset steps that should NOT be N/Ad.
Identifies N/Ad step.
- 4.
Examinee should identify data sheet valves 203-3B and 203-4G discharge temps are
> 100oF difference.
Identifies 2 temperatures >
100oF difference.
- 5.
Examinee should either report discrepancies to Unit Supervisor OR sign the Calculations Verified By line.
Reports discrepancies to Unit Supervisor OR signs the Calculations Verified By line.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-1-R Page 6 of 7 Operators Name:
Job
Title:
Title:
REVIEW ACCEPTANCE CRITERIA MET FOR THE ACCOUSTIC MONITOR Revision Number: 04 JPM Number: A-N-1-R Task Number and
Title:
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures.
K/A Number and Importance: Generic.2.1.7 4.4 / 4.7 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 10 minutes Actual Time Used:
minutes
References:
DOS 0250-06, rev 14 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-1-R Page 7 of 7 INITIAL CONDITIONS
- 1. You are the Unit 3 Aux NSO.
- 2. DOS 0250-06 was performed last shift, for the Acoustic Monitor /
Temperature Detector Operability Test.
- 3. The off-going NSO was unable to verify the paperwork, and has turned it over to you.
- 4. The NSO reported all surveillance requirements were within specifications INITIATING CUE
- 1. Verify ALL requirements are within specifications, and paperwork is correct.
Exelon Nuclear Job Performance Measure PERFORM ASSIST NSO DAILY LOG FOR U1 AND 2/3 CONDENSATE STORAGE TANKS INVENTORY CALCULATIONS JPM Number: A-N-2-R Revision Number: 01 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-2-R Page 2 of 8 Revision Record (Summary)
Revision 00 Modified for 2013 Cert Exam.
Revision 01 Modified for 14-1 NRC Exam.
A-N-2-R Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1.
Reset the simulator to any IC, with the following conditions:
- a.
2/3A CST level is 15 ft.
- b.
2/3B CST level is 16 ft.
DOCUMENT PREPARATION
- 1. Provide a clean copy of Appendix B, ASSIST NSO DAILY SURVEILLANCE LOG, Attachment A, page 19.
- 2. Photo of the 2/3 CST level meters on the 902-6 panel.
A-N-2-R Page 4 of 8 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Both units are operating at near rated power.
- 3. Today is Monday shift 1.
- 4. Unit 1A CST level is 26%.
INITIATING CUE
- 1. The Unit Supervisor has directed you to complete Appendix B, Attachment A, page 19, for the Unit 1 and 2/3 Condensate Storage Tanks Inventory.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-2-R Page 5 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the supplied copy of Appendix B, Attachment A.
Do NOT provide the supplied photo until correct meters are identified.
- 1.
Examinee identifies and utilizes the Monday shift 1 slot.
Fills out all values on the Monday shift 1 slot.
- 2.
Records value of 26% for U1A CST in INDICATED LEVEL column.
See attached KEY.
CUE:
When examinee locates correct meters, provide the supplied photo of the meters.
- 3.
Locates meters, on the 902-6 panel, for 2/3A and 2/3B CSTs and records correct value in INDICATED LEVEL column:
2/3A CST 15.0 2/3B CST 16.0 See attached KEY.
- 4.
Examinee calculates values and records them in CORRECTED LEVEL column:
U1A CST 19.0 2/3A CST 13.0 2/3B CST 14.0 See attached KEY.
- 5.
Examinee calculates values and records them in ACTUAL LEVEL column:
U1A CST 38,000 2/3A CST 104,000 2/3B CST 112,000 See attached KEY.
A-N-2-R Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 6.
Examinee calculates value and records it in TOTAL CST GALLONS block:
Total: 254,000 See attached KEY.
- 7.
Examinee identifies that TOTAL GALLONS are
<260,000 (130,000 per each unit).
Examinee notifies the Unit Supervisor of value and that minimum required inventory is not met.
- 8.
Informs Unit Supervisor Independent verification is required and task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-2-R Page 7 of 8 Operators Name:
Job
Title:
Title:
PERFORM ASSIST NSO DAILY LOG FOR U1 AND 2/3 CONDENSATE STORAGE TANKS INVENTORY CALCULATIONS.
Revision Number: 01 JPM Number: A-N-2-R Task Number and
Title:
29800LP013, Perform the duties of a Unit NSO including monitoring the unit, answering the phones and radio, completing logs, surveillances, and daily sheets, and filling out and conducting a shift turnover.
K/A Number and Importance: Generic.2.1.18 3.6 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 10 minutes Actual Time Used:
minutes
References:
Appendix B, rev 80 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-2-R Page 8 of 8 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Both units are operating at near rated power.
- 3. Today is Monday shift 1.
- 4. Unit 1A CST is 26%.
INITIATING CUE
- 1. The Unit Supervisor has directed you to complete Appendix B, Attachment A, page 19, for the Unit 1 and 2/3 Condensate Storage Tanks Inventory.
- 2. Inform the Unit Supervisor when the task is complete.
A-N-3-R Page 1 of 8 Exelon Nuclear Job Performance Measure VERIFY VALVE OPERABILITY AND TIMING JPM Number: A-N-3-R Revision Number: 00 Date: 12/14 Developed By:
Instructor Date Approved By:
Training Department Date
A-N-3-R Page 2 of 8 Revision Record (Summary)
Revision 00 New JPM for ILT 14-1 NRC Exam
A-N-3-R Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS Use any IC that accommodates other JPMs.
This is a table top JPM utilizing Simulator procedures.
Verify the DISACM is available.
PROCEDURE PREPARATION Mark up a copy of DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, as follows:
o Indicate that testing is complete for step I.6. Leave the other steps blank.
o For MO 2-1601-24, enter a close stroke time in the ALERT range of the DISACM.
o For MO 2-1601-23, enter a close stroke time in the REQUIRED ACTION range of the DISACM.
o For ALL other step I.6 valves, enter a time within the ACCEPTABLE range.
Provide a copy of ER-AA-321, Administrative Requirements for Inservice Testing.
A-N-3-R Page 4 of 8 INITIAL CONDITIONS You are the Unit 2 Aux NSO.
An extra NSO just completed surveillance DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, step I.6 only at this time. The other steps will be performed later.
INITIATING CUE Per step H.3.a of DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, review the completed portion of the surveillance and report to the Unit Supervisor the results of your review.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information for Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
- (Filled bullet) indicates a CRITICAL part of the step.
o (Open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The time clock starts when the candidate acknowledges the initiating cue.
A-N-3-R Page 5 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
- 1. Evaluate valve performance by comparing the Actual Stroke Time to the established IST ranges listed in the DISACM.
Reviews Checklist 1, UNIT 2 QUARTERLY VALVE TIMING and determines the following:
MO 2-1601-24 stroke close time is in the ALERT range of the DISACM.
- 2. Evaluate valve performance by comparing the Actual Stroke Time to the established IST ranges listed in the DISACM.
Reviews Checklist 1, UNIT 2 QUARTERLY VALVE TIMING and determines the following:
MO 2-1601-23 stroke close time is in the REQUIRED ACTION range of the DISACM.
- 3. Notify Unit Supervisor of above results Notifies Unit Supervisor of above results Cue:
As the Unit Supervisor, direct examinee to determine required actions per ER-AA-321 Attachment 2.
- 4. Per Acceptance Criteria, refer to ER-AA-321,, and determine that MO 2-1601-24 should be restroked.
Per Acceptance Criteria, refers to ER-AA-321, Attachment 2, and determines that MO 2-1601-24 should be restroked.
- 5. Per Acceptance Criteria and ER-AA-321,,
determine that MO 2-1601-23 should be declared inoperable.
Per Acceptance Criteria and ER-AA-321, Attachment 2, determines that MO 2-1601-23 should be declared inoperable.
A-N-3-R Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
- 6. Notify Unit Supervisor of above results Notifies Unit Supervisor of above results:
MO 2-1601-24 should be restroked.
MO 2-1601-23 should be declared inoperable.
- 7. Notify the Unit Supervisor that step H.3.a is complete and the task is complete.
- 8. Notifies the Unit Supervisor that step H.3.a is complete and the task is complete.
Cue:
As the Unit Supervisor, acknowledge report.
END JPM Stop Time:_________
A-N-3-R Page 7 of 8 Operators Name: ___________________________________
Job
Title:
Title:
VERIFY VALVE OPERABILITY AND TIMING JPM Number: A-N-3-R Revision Number:
00 Task Number and
Title:
298L057, Perform an operability check of the following pieces of equipment: MO/AO Valves.
K/A Number and Importance: 2.2.14 3.9/4.3 Suggested Testing Environment:
Simulator Actual Testing Environment:
Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
15 minutes Actual Time Used: _______minutes
References:
DOS 1600-03, R 51, UNIT 2 QUARTERLY VALVE TIMING Dresden In-Service Testing Acceptance Criteria Manual (DISACM)
ER-AA-321 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-3-R Page 8 of 8 INITIAL CONDITIONS You are the Unit 2 Aux NSO.
An extra NSO just completed surveillance DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, step I.6 only for Post Maintenance testing. The other steps will be performed later.
INITIATING CUE Per step H.3.a of DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, review the completed portion of the surveillance and report to the Unit Supervisor the results of your review.
Exelon Nuclear Job Performance Measure DETERMINE RADIOLOGICAL BRIEF AND PROTECTIVE CLOTHING REQUIREMENTS JPM Number: A-N-4-R Revision Number: 00 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-4-R Page 2 of 7 Revision Record (Summary)
Revision 00 New for Dresden ILT 14-1 exam.
A-N-4-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Provide a copy of RP-AA-460
- 2. Copy of survey map for Unit 3 Reactor Building, El. 545 RWCU Pump Room
- 3. Copy of RWP# 10004555, U3 RWCU pump room.
A-N-4-R Page 4 of 7 INITIAL CONDITIONS
- 1. You are the Unit 3 Aux NSO.
- 2. Following maintenance, it was reported that valve 3-1201-128A, 3A RWCU RECIRC PMP SUCT VLV, appeared to have packing leakage.
- 3. The Unit Supervisor is unable to obtain any more information regarding the packing leakage.
INITIATING CUE
- 1. The Unit Supervisor has directed you to determine the radiological controls needed (if any) to investigate the leakage on 3-1201-128A.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-4-R Page 5 of 7 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
WHEN the examinee asks RP for the survey map of the area, THEN provide the map attached to this JPM.
WHEN the examinee asks RP for the RWP for the job THEN provide RWP 10004555 attached to this JPM.
If the examinee asks for the procedure for Control of High and Very High Radiation Areas, RP-AA-460, provide them with a copy.
- 1.
Examinee reviews RWP and survey map and determines protective clothing requirement.
Determines the following minimum protective clothing requirements:
Zone 2 Protective Clothing Modesty garments Cloth hood or half hood Cloth coveralls Cloth shoe covers Shoe rubbers Glove liners Rubber gloves
- 2.
Examinee reviews RWP and RP-AA-460 and determines briefing requirements to enter a Locked High Rad Area (IAW RP-AA-460 step 4.4.2)
Determines a Locked High Rad Area brief from Radiation Protection is required.
- 3.
Informs the Unit Supervisor of clothing and briefing requirements Informs Unit Supervisor of the information in steps 1 and 2.
- 4.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-4-R Page 6 of 7 Operators Name:
Job
Title:
Title:
Determine Radiological Brief and protective clothing requirements Revision Number: 00 JPM Number: A-N-4-R Task Number and
Title:
299L029, Conduct shift operations K/A Number and Importance: Generic.2.3.7 3.5 / 3.6 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 20 minutes Actual Time Used:
minutes
References:
RP-AA-460 Rev. 26 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-4-R Page 7 of 7 INITIAL CONDITIONS
- 1. You are the Unit 3 Aux NSO.
- 2. Following maintenance, it was reported that valve 3-1201-128A, 3A RWCU RECIRC PMP SUCT VLV, appeared to have packing leakage.
- 3. The Unit Supervisor is unable to obtain any more information regarding the packing leakage.
INITIATING CUE
- 1. The Unit Supervisor has directed you to determine the radiological controls needed (if any) to investigate the leakage on 3-1201-128A.
- 2. Inform the Unit Supervisor when the task is complete.
S-RD-11 Page 1 of 8 Exelon Nuclear Job Performance Measure Reportability Determination JPM Number: A-N-1-S Revision Number: 01 Date: 01/15 Developed By:
Developer Date Validated By:
SME or Instructor Date Review By:
Operations Representative Date Approved By:
Training Department Date
S-RD-10 Job Performance Measure (JPM)
Page 2 of 8 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
- 1.
Task description and number, JPM description and number are identified.
- 2.
Knowledge and Abilities (K/A) references are included.
- 3.
Performance location specified. (in-plant, control room, simulator, or other)
- 4.
Initial setup conditions are identified.
- 5.
Initiating cue (and terminating cue if required) are properly identified.
- 6.
Task standards identified and verified by SME review.
- 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
- 8.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure LS-AA-1120 Rev: 18 Procedure Rev:
Procedure Rev:
- 9.
Verify cues both verbal and visual are free of conflict.
- 10. Verify performance time is accurate
- 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date
S-RD-10 Job Performance Measure (JPM)
Page 3 of 8 Revision Record (Summary)
Revision 00 New JPM created for 2013 LORT Exam.
Revision 01 Revised for use on 2015 ILT Exam.
S-RD-10 Job Performance Measure (JPM)
Page 4 of 8 SIMULATOR SETUP INSTRUCTIONS Any IC to accommodate other JPMs.
This is a table top JPM utilizing Simulator procedures.
S-RD-10 Job Performance Measure (JPM)
Page 5 of 8 INITIAL CONDITIONS An event has occurred at Dresden resulting in the following conditions:
- A worker has been injured.
- The individual is contaminated, and must be transported to the hospital immediately.
- You are the Unit Supervisor.
INITIATING CUE
- 1. Determine the Reportability requirements, including the Event Classification and the Time Limit of any Notifications or Reports.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
Operator Fundamentals: During this JPM, the evaluator should look at the Operators performance of the task in regards to the following SER 3-05 Operator Fundamentals.
Monitoring Plant Conditions and Indications Closely Know and monitor critical parameters Understand limitations/design of indications Use multiple indications Give attention to detail Uses procedures, clearances, or other documents to change plant configuration Do not deviate from procedures Uses error reduction techniques effectively Have a low problem threshold
S-RD-10 Job Performance Measure (JPM)
Page 6 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
- 1.
Determines the event is reportable per RAD 1.6 Determines the event is reportable per RAD 1.6 Transport of contaminated person to Medical Facility
- 2.
Determines the time limit to make a phone report is 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to NRC Determines the time limit to make a phone report is 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to NRC.
END JPM Stop Time:_________
S-RD-10 Job Performance Measure (JPM)
Page 7 of 8 Operators Name: ___________________________________
Job
Title:
Title:
Reportability Determination JPM Number: A-N-1-S Revision Number:
01 Task Number and
Title:
299L001, Determine Reportability requirements as outlined in station Reportability manual.
K/A Number and Importance: 2.1.1
--/4.2 Suggested Testing Environment:
Simulator Actual Testing Environment:
Simulator Plant Control Room Testing Method: Simulate SRO Only: Yes No Perform Alternate Path: Yes No Time Critical:
Yes No Estimated Time to Complete:
10 minutes Actual Time Used: _______minutes
References:
LS-AA-1120 rev 18 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
S-RD-10 Job Performance Measure (JPM)
Page 8 of 8 INITIAL CONDITIONS An event has occurred at Dresden resulting in the following conditions:
- A worker has been injured.
- The individual is contaminated, and must be transported to the hospital immediately.
- You are the Unit Supervisor.
INITIATING CUE
- 2. Determine the Reportability requirements, including the Event Classification and the Time Limit of any Notifications or Reports.
Exelon Nuclear Job Performance Measure DETERMINATION OF ON LINE RISK JPM Number: A-N-2-S Revision Number: 00 Date: 01/15 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-2-S Page 2 of 8 Revision Record (Summary)
Revision 00 New JPM for 2015 NRC exam.
A-N-2-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1.
Simulator Center Desk computer cleared and available.
DOCUMENT PREPARATION
- 1. None.
A-N-2-S Page 4 of 8 INITIAL CONDITIONS
- 1. You are the Unit 3 Supervisor.
- 2. Unit 2 and Unit 3 are at near rated power.
- 3. The 345kv BT CB 8-15 has failed open and will take 2 days to repair.
- 4. The U3 Isolation Condenser is scheduled to come OOS the next shift.
INITIATING CUE
- 1. The Shift Manager requests that you run Paragon to determine the current On-line Risk;
- AND,
- 2. Determine the fire risk if the Isolation Condenser work is allowed.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-2-S Page 5 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Have center desk computer up and on the desktop screen
- 1.
Enter Paragon.
Clicks on the ICON for Paragon.
CUE:
When asked login is simcr, and no password is required
- 2.
Select Operations Module Selects Operations Module when 3 options are on screen
- 3.
Selects Switchyard Tab, then significant breakers.
Clicks on Switchyard tab and then clicks on significant breakers.
- 4.
Select OCB 8-15 and selects unavailable.
Clicks on OCB 8-15, then clicks on unavailable,
- 5.
Select Execute. Determine that On-line is YELLOW.
Runs program identifies On-line risk is YELLOW.
- 6.
Select ECCS Tab.
Clicks on ECCS Tab.
- 7.
Select Isolation Condenser, then unavailable.
Clicks on Isolation Condenser, then clicks on unavailable.
- 8.
Select Execute. Determine that fire risk is YELLOW if Isolation Condenser is taken OOS.
Runs program and identifies fire risk is YELLOW if Isolation Condenser is taken OOS.
A-N-2-S Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 8.
Report to Shift Manager that current On-Line Risk is YELLOW and fire risk will be YELLOW if the Isolation Condenser work is allowed.
Reports to Shift Manager that current On-Line Risk is YELLOW and fire risk will be YELLOW if the Isolation Condenser work is allowed.
CUE:
Acknowledge the report END JPM Stop Time:_________
A-N-2-S Page 7 of 8 Operators Name:
Job
Title:
Title:
REVIEW OFF-SITE POWER SOURCES AVAILABLE PAPERWORK Revision Number: 00 JPM Number: A-N-2-S Task Number and
Title:
CM198081 Determine on line risk and protected pathway equipment per WC
-AA-101, OP-AA-117, and OP-DR-108-117-1001.
K/A Number and Importance: Generic.2.1.19 3.9/3.8 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes
References:
WC-AA-101 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-2-S Page 8 of 8 INITIAL CONDITIONS
- 1. You are the Unit 3 US.
- 2. Unit 2 and Unit 3 are at near rated power.
- 3. The 345kv BT CB 8-15 has failed open and will take 2 days to repair.
- 4. The U3 Isolation Condenser is scheduled to come OOS the next shift.
INITIATING CUE
- 1. The Shift Manager request that you run Paragon to determine current On-line Risk;
- AND,
- 2. Determine the fire risk if the Isolation Condenser work is allowed.
Exelon Nuclear Job Performance Measure DECLARE EDG OPERABLE AFTER SURVEILLANCE REVIEW JPM Number: A-N-3-S Revision Number: 01 Date: 01/15 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-3-S Page 2 of 8 Revision Record (Summary)
Revision 00 Modified JPM for ILT 12-1 (2013-301) NRC Exam.
Revision 01 Revise for ILT 14-1 NRC Exam.
A-N-3-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Provide a marked up copy of DOS 6600-01
A-N-3-S Page 4 of 8 INITIAL CONDITIONS
- 1. You are the Unit 3 Unit Supervisor.
- 2. The Unit 3 EDG was run for a normal even month surveillance.
- 3. No maintenance was performed on the Unit 3 EDG.
- 4. The Unit 3 NSO has completed DOS 6600-01, DIESEL GENERATOR SURVEILLANCE TESTS for the Unit 3 EDG.
INITIATING CUE
- 1. Verify the Unit 3 EDG surveillance has been completed correctly.
- 2. Review the surveillance and determine the operability of the Unit 3 EDG.
- 3. Inform the Shift Manager when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-3-S Page 5 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the supplied copy of DOS 6600-01 NOTE:
Other unidentified errors exist. Only items marked as critical are required.
- 1.
Verify D/G has operated for
> 60 minutes with a load of 2340 to 2600 kW Recognizes that the diesel ran for less than 60 minutes. Acceptance criteria not met.
- 2.
Diesel fuel oil day tank level >
29.5 inches (for U2 or U3 EDG)
Recognizes that Diesel fuel oil day tank level is less than 29.5 inches Acceptance criteria not met.
- 3.
Verify D/G START AIR A1/A2 RECEIVER TANK pressure in Step 3.a.(16) is greater than D/G START AIR B1/B2 RECEIVER TANK in Step 3.a.(16)
Recognizes that A1/A2 RECEIVER TANK pressure is not greater than B1/B2 RECEIVER TANK pressure.
Acceptance criteria not met.
- 4.
IF air pressure between banks has equalized, THEN initiate an Issue Report to repair check valve.
Recognizes that an issue report needs to be generated to repair the check valve.
- 5.
Verify A compressor stops between 245 and 260 psig.
Recognizes that the A compressor stopped > 260 psig.
- 6.
IF Compressor A OR "B" stop pressures are NOT within expected range (224 to 260 psig), THEN contact the Plant Engineering System Manager AND initiate an Issue Report.
Recognizes that compressor A did not stop within the expected range (265 psig), the System Engineer needs to be contacted.
A-N-3-S Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 7.
Notify System Engineer that A compressor did not stop at the expected band.
Notifies System Engineer that A compressor did not start at the expected band.
- 8.
Declare D/G Operable Recognizes that the Acceptance Criteria for the Unit 3 EDG is not met and determines the EDG is inoperable.
- 9.
Informs Shift Manager task is complete.
Examinee notifies the Shift Manager.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-3-S Page 7 of 8 Operators Name:
Job
Title:
Title:
DECLARE EDG OPERABLE AFTER SURVEILLANCE REVIEW Revision Number: 01 JPM Number: A-N-3-S Task Number and
Title:
264L009, Perform Surveillance Testing K/A Number and Importance: Generic 2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes
References:
DOS 6600-01, rev 127 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-3-S Page 8 of 8 INITIAL CONDITIONS
- 1. You are the Unit 3 Unit Supervisor.
- 2. The Unit 3 EDG was run for a normal even month surveillance.
- 3. No maintenance was performed on the Unit 3 EDG.
- 4. The Unit 3 NSO has completed DOS 6600-01, DIESEL GENERATOR SURVEILLANCE TESTS for the Unit 3 EDG.
INITIATING CUE
- 1. Verify the Unit 3 EDG surveillance has been completed correctly.
- 2. Review the surveillance and determine the operability of the Unit 3 EDG.
- 3. Inform the Shift Manager when the task is complete.
Exelon Nuclear Job Performance Measure SELECT PERSONNEL FOR RADIATION WORK JPM Number: A-N-4-S Revision Number: 00 Date: 01/15 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-4-S Page 2 of 10 Revision Record (Summary)
Revision 00 Modified JPM for ILT 12-1 (2013-301) NRC Exam.
Revision 01 Revised for ILT 14-1 NRC Exam.
A-N-4-S Page 3 of 10 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 2. Markup a survey map for the Unit 3 RWCU Pump Room.
- 3. Clean copy of RP-AA-203.
A-N-4-S Page 4 of 10 INITIAL CONDITIONS
- 1. You are a Unit Supervisor and will be briefing NLOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555.
- 2. Five NLOs are available this shift.
- None of the five have received dose at any location other than Dresden Station.
- None of the five have received dose since midnight on any RWPs other than 10004555.
- 3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five NLOs to assist you in your planning:
Name DDE dose received on RWP 10004555 Today Annual TEDE dose To Date Alex 40 mrem 1550 mrem Dan 5 mrem 1950 mrem Mike 0 mrem 1920 mrem Sue 45 mrem 1850 mrem Tom 10 mrem 1750 mrem
- 4. The total expected stay time for each NLO will be 60 minutes. Based on past job history, it will breakdown as follows:
- 45 minutes total in the area near the following two valves:
3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)
- 15 minutes total in the area near the following one valve:
3-1201-128A A RWCU Pump Suction (at A RWCU Pump)
INITIATING CUE
- 1. CALCULATE the expected dose for the work in RWCU Pump Room. DETERMINE which NLO(s) CAN and which NLO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.
A-N-4-S Page 5 of 10 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-4-S Page 6 of 10 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the supplied copy of the RWP and survey map of the RWCU pump room and the supplied copy of RP-AA-203.
The following steps may be performed in any order.
- 1.
Reviews Survey Maps to determine area dose rates.
Reviews the survey maps and determines area dose rates to be 50 mr/hr for the first group of 2 valves and 160 mr/hr for the remaining valve.
NOTE:
The following calculations should be made:
2 valve clearance projected dose = 0.75 hr x 40 mr/hr = 30 mrem 1 valve clearance projected dose = 0.25 hr x 140 mr/hr = 35 mrem Total projected dose for the job = 40 mrem + 30 mrem = 65 mrem
- 2.
Calculates that the projected dose that will be received for the task is 65 mrem.
Determines the NLOs will receive 30 mrem on the first 2 valves and 35 on the next valve.
CUE:
IF the candidate inquires whether or not any of the NLOs has received permission to exceed any dose limits, respond: None of the Non Licensed Operators have received permission to exceed any limits.
NOTE:
The following steps may be performed in any order.
- 3.
Determines that ALEX CAN NOT perform the job because he would exceed the 80 mrem dose alarm on RWP 10004555.
Alexs total daily dose on RWP 10004555 would be 105 mrem.
A-N-4-S Page 7 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 4.
Determines that Dan CAN NOT perform the job because he would exceed the 2000 mrem Exelon Annual limit.
Dans total Annual dose would be 2015 mrem.
- 5.
Determines that Mike CAN perform the job because no limits will be exceeded.
Mikes total RWP daily dose and Annual dose will remain below the limits.
- 6.
Determines that Sue CAN NOT perform the job because she would exceed the 80 mrem dose alarm on RWP 10004555.
Sues total daily dose on RWP 10004555 would be 110 mrem.
- 7.
Determines that Tom CAN perform the job because no limits will be exceeded.
Toms total RWP daily dose and Annual dose will remain below the limits.
END JPM Stop Time:_________
A-N-4-S Page 8 of 10 Operators Name:
Job
Title:
Title:
SELECT PERSONEL FOR RADIATION WORK Revision Number: 01 JPM Number: A-N-4-S Task Number and
Title:
29900LK119, Discuss the items to be considered prior to work authorization K/A Number and Importance: Generic.2.3.13 3.4 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 10 minutes Actual Time Used:
minutes
References:
RP-AA-203, rev 03 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-4-S Page 9 of 10 KEY EVALUATOR: The candidate must determine that dose for the task will be 65 mrem and determine that only two NLOs can receive the dose, necessary to complete the task. They are Mike and Tom. See the table below for projected job dose, 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> total dose on RWP 10004555, and total Annual TEDE dose for each Operator.
Calculation:
2 valves clearance (at RWCU Aux Pump) projected dose = 0.75 hr x 40 mr/hr =
30mrem 1 valve clearance (at A RWCU Pump) projected dose = 0.25hr x 140 mr/hr =
35mrem 30mrem + 35 mrem = 65 mrem projected job dose for clearance order hanging Name DDE dose received on RWP 10004555 today Annual TEDE dose as of Midnight To Date Projected dose on RWP 10004555 for the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period Projected Annual TEDE (including all dose from last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)
Alex 40 mrem 1550 mrem (40 + 65 =)
105 mrem (1550 + 65 =)
1615 mrem Dan 5 mrem 1950 mrem (5 + 65 =)
70 mrem (1950 + 65 =)
2015 mrem Mike 0 mrem 1920 mrem (0 + 65 =)
65 mrem (1920 + 65 =)
1985 mrem Sue 45 mrem 1850 mrem (45 + 65 =)
110 mrem (1850 + 65 =)
1915 mrem Tom 10 mrem 1750 mrem (10 + 65 =)
75 mrem (1750 + 65 =)
1815 mrem The bolded values in the table exceed the applicable Company, RWP, or 10CFR limit.
A-N-4-S Page 10 of 10 INITIAL CONDITIONS
- 1. You are a Unit Supervisor and will be briefing NLOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555.
- 2. Five NLOs are available this shift.
- None of the five have received dose at any location other than Dresden Station.
- None of the five have received dose since midnight on any RWPs other than 10004555.
- 3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five NLOs to assist you in your planning:
Name DDE dose received on RWP 10004555 Today Annual TEDE dose To Date Alex 40 mrem 1550 mrem Dan 5 mrem 1950 mrem Mike 0 mrem 1920 mrem Sue 45 mrem 1850 mrem Tom 10 mrem 1750 mrem
- 4. The total expected stay time for each NLO will be 60 minutes. Based on past job history, it will breakdown as follows:
- 45 minutes total in the area near the following two valves:
3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)
- 15 minutes total in the area near the following one valve:
3-1201-128A A RWCU Pump Suction (at A RWCU Pump)
INITIATING CUE
- 1. CALCULATE the expected dose for the work in RWCU Pump Room.
DETERMINE which NLO(s) CAN and which NLO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.
Exelon Nuclear Job Performance Measure DETERMINE EMERGENCY CLASSIFICATION AND FILL OUT NARS FORM JPM Number: A-N-5-S Revision Number: 01 Date: 01/15 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-5-S Page 2 of 8 Revision Record (Summary)
Revision 00 New JPM developed for.........
Revision 01 Revised for ILT 14-1 NRC
A-N-5-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Screenshot of meteorological data.
A-N-5-S Page 4 of 8 INITIAL CONDITIONS
- 1. This is a time critical JPM.
- 2. You are the Shift Emergency Director.
- 3. Unit 2 was operating at near rated conditions when a transient occurred causing ALL high pressure feed to be lost and RPV water level dropped to -20 inches.
- 4. An automatic scram did NOT occur.
- 5. The Unit 2 NSO initiated a manual scram and initiated ARI.
- 6. One (1) minute after the manual scram was initiated, the following conditions exist:
- SBLC is injecting with one pump.
- Drywell pressure is 2.5 psig and steady.
- Drywell temperature is 138oF and steady.
- Torus temperature is 117oF and rising slowly.
- RPV Pressure is 920 psig and dropping slowly.
- Reactor power is 10% and steady on the APRMs.
- RPV water level is -170 inches and dropping rapidly.
INITIATING CUES
- 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.
A-N-5-S Page 5 of 8 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-5-S Page 6 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Examinee locates a copy of Radiological Emergency Plan Annex for Dresden EP-AA-1004 charts.
Provide the supplied NARS Form.
Provide the supplied screen shot of the meteorological data.
- 1.
Determines a classification of GENERAL EMERGENCY, due to a the failure of an automatic AND manual scram AND there is an indication of an extreme challenge to the ability to cool the core.
Determines highest classification is a SITE EMERGENCY per EAL MS2 (15 minute requirement).
NOTE:
Determines classification start time _______ and stop time _______.
(15 minute limit)
NOTE:
Automatic scram, manual scram, and ARI were not successful from Reactor Console Reactor power is 17% on the APRMs AND RPV water level is -182 inches and dropping rapidly with NO high pressure feed available
- 2.
Properly fills out NARS form.
See attached key for the areas that must be filled out correctly (13 minute requirement):
NOTE:
Fill out NARS form start time (when declaration completed) _______ and stop time _______.
(13 minute limit)
END JPM Stop Time:_________
A-N-5-S Page 7 of 8 Operators Name:
Job
Title:
Title:
DETERMINE EMERGENCY CLASSIFICATION and fill out nars form Revision Number: 01 JPM Number: A-N-5-S Task Number and
Title:
- 295L160, Given a plant in an off normal condition, determine the EP classification K/A Number and Importance: Generic.2.4.44 2.4 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 (declare) 13 (fill out) minutes Actual Time Used:
minutes
References:
EP-AA-1004, Addendum 3, Rev 00 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-5-S Page 8 of 8 INITIAL CONDITIONS
- 1. This is a time critical JPM.
- 2. You are the Shift Emergency Director.
- 3. Unit 2 was operating at near rated conditions when a transient occurred causing ALL high pressure feed to be lost and RPV water level dropped to -
20 inches.
- 4. An automatic scram did NOT occur.
- 5. The Unit 2 NSO initiated a manual scram and initiated ARI.
- 6. One (1) minute after the manual scram was initiated, the following conditions exist:
- SBLC is injecting with one pump.
- Drywell pressure is 2.5 psig and steady.
- Drywell temperature is 138oF and steady.
- Torus temperature is 117oF and rising slowly.
- RPV Pressure is 920 psig and dropping slowly.
- Reactor power is 10% and steady on the APRMs.
- RPV water level is -170 inches and dropping rapidly.
INITIATING CUES
Give the NARS form to the WEC Supervisor, who will make the state notification.