Exelon Nuclear Job Performance Measure REVIEW ACCEPTANCE CRITERIA MET FOR THE ACCOUSTIC MONITOR JPM Number: A-N-1-R Revision Number: 04 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 02 Bank JPM.

Revision 03 Revised for ILT 09-1 NRC Exam.

Revision 04 Revised for ILT 14-1 NRC Exam.

A-N-1-R Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Mark up a copy of DOS 0250-06, Acoustic Monitor Temperature Detector Instrument (Channel) Check.

A-N-1-R Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Aux NSO.
2. DOS 0250-06 was performed last shift, for the Acoustic Monitor / Temperature Detector Operability Test.
3. The off-going NSO was unable to verify the paperwork, and has turned it over to you.
4. The NSO reported all surveillance requirements were within specifications INITIATING CUE
1. Verify ALL requirements are within specifications, and paperwork is correct.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-1-R Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the supplied copy of DOS 0250-06.

  • 1. Examinee should identify Identifies out of spec data sheet valve 203-3C value.

threshold volt is out of spec. _____ _____ _____

  • 2. Examinee should identify Identifies out of spec data sheet valve 203-4A value.

threshold volt is out of spec. _____ _____ _____

3. Examinee should identify Identifies N/Ad step.

data sheet valve 203-3D H-19 in Alarm AND Alarm _____ _____ _____

Reset steps that should NOT be N/Ad.

  • 4. Examinee should identify Identifies 2 temperatures >

data sheet valves 203-3B and 100oF difference.

203-4G discharge temps are

> 100oF difference. _____ _____ _____

5. Examinee should either Reports discrepancies to report discrepancies to Unit Unit Supervisor OR signs Supervisor OR sign the the Calculations Verified Calculations Verified By By line. _____ _____ _____

line.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-1-R Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO JPM

Title:

REVIEW ACCEPTANCE CRITERIA MET FOR THE ACCOUSTIC MONITOR Revision Number: 04 JPM Number: A-N-1-R Task Number and

Title:

299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures.

K/A Number and Importance: Generic.2.1.7 4.4 / 4.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

DOS 0250-06, rev 14 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-1-R Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Aux NSO.
2. DOS 0250-06 was performed last shift, for the Acoustic Monitor /

Temperature Detector Operability Test.

3. The off-going NSO was unable to verify the paperwork, and has turned it over to you.
4. The NSO reported all surveillance requirements were within specifications INITIATING CUE
1. Verify ALL requirements are within specifications, and paperwork is correct.

A-N-1-R Page 7 of 7

Exelon Nuclear Job Performance Measure PERFORM ASSIST NSO DAILY LOG FOR U1 AND 2/3 CONDENSATE STORAGE TANKS INVENTORY CALCULATIONS JPM Number: A-N-2-R Revision Number: 01 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Modified for 2013 Cert Exam.

Revision 01 Modified for 14-1 NRC Exam.

A-N-2-R Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC, with the following conditions:
a. 2/3A CST level is 15 ft.
b. 2/3B CST level is 16 ft.

DOCUMENT PREPARATION

1. Provide a clean copy of Appendix B, ASSIST NSO DAILY SURVEILLANCE LOG, Attachment A, page 19.
2. Photo of the 2/3 CST level meters on the 902-6 panel.

A-N-2-R Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Both units are operating at near rated power.
3. Today is Monday shift 1.
4. Unit 1A CST level is 26%.

INITIATING CUE

1. The Unit Supervisor has directed you to complete Appendix B, Attachment A, page 19, for the Unit 1 and 2/3 Condensate Storage Tanks Inventory.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-2-R Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of Appendix B, Attachment A.

Do NOT provide the supplied photo until correct meters are identified.

1. Examinee identifies and Fills out all values on the utilizes the Monday shift 1 Monday shift 1 slot.

slot. _____ _____ _____

  • 2. Records value of 26% for See attached KEY.

U1A CST in INDICATED LEVEL column. _____ _____ _____

CUE:

When examinee locates correct meters, provide the supplied photo of the meters.

  • 3. Locates meters, on the 902-6 See attached KEY.

panel, for 2/3A and 2/3B CSTs and records correct value in INDICATED LEVEL column:

2/3A CST 15.0 2/3B CST 16.0 _____ _____ _____

  • 4. Examinee calculates values See attached KEY.

and records them in CORRECTED LEVEL column:

U1A CST 19.0 2/3A CST 13.0 2/3B CST 14.0

  • 5. Examinee calculates values See attached KEY.

and records them in ACTUAL LEVEL column:

U1A CST 38,000 2/3A CST 104,000 _____ _____ _____

2/3B CST 112,000 A-N-2-R Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 6. Examinee calculates value See attached KEY.

and records it in TOTAL CST GALLONS block:

Total: 254,000 _____ _____ _____

  • 7. Examinee identifies that Examinee notifies the Unit TOTAL GALLONS are Supervisor of value and

<260,000 (130,000 per each that minimum required _____ _____ _____

unit). inventory is not met.

8. Informs Unit Supervisor Examinee notifies the Unit Independent verification is Supervisor.

required and task is _____ _____ _____

complete.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-2-R Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO JPM

Title:

PERFORM ASSIST NSO DAILY LOG FOR U1 AND 2/3 CONDENSATE STORAGE TANKS INVENTORY CALCULATIONS.

Revision Number: 01 JPM Number: A-N-2-R Task Number and

Title:

29800LP013, Perform the duties of a Unit NSO including monitoring the unit, answering the phones and radio, completing logs, surveillances, and daily sheets, and filling out and conducting a shift turnover.

K/A Number and Importance: Generic.2.1.18 3.6 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

Appendix B, rev 80 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-2-R Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Both units are operating at near rated power.
3. Today is Monday shift 1.
4. Unit 1A CST is 26%.

INITIATING CUE

1. The Unit Supervisor has directed you to complete Appendix B, Attachment A, page 19, for the Unit 1 and 2/3 Condensate Storage Tanks Inventory.
2. Inform the Unit Supervisor when the task is complete.

A-N-2-R Page 8 of 8

Exelon Nuclear Job Performance Measure VERIFY VALVE OPERABILITY AND TIMING JPM Number: A-N-3-R Revision Number: 00 Date: 12/14 Developed By:

Instructor Date Approved By:

Training Department Date A-N-3-R Page 1 of 8

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM for ILT 14-1 NRC Exam A-N-3-R Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS Use any IC that accommodates other JPMs.

This is a table top JPM utilizing Simulator procedures.

Verify the DISACM is available.

PROCEDURE PREPARATION Mark up a copy of DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, as follows:

o Indicate that testing is complete for step I.6. Leave the other steps blank.

o For MO 2-1601-24, enter a close stroke time in the ALERT range of the DISACM.

o For MO 2-1601-23, enter a close stroke time in the REQUIRED ACTION range of the DISACM.

o For ALL other step I.6 valves, enter a time within the ACCEPTABLE range.

Provide a copy of ER-AA-321, Administrative Requirements for Inservice Testing.

A-N-3-R Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS You are the Unit 2 Aux NSO.

An extra NSO just completed surveillance DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, step I.6 only at this time. The other steps will be performed later.

INITIATING CUE Per step H.3.a of DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, review the completed portion of the surveillance and report to the Unit Supervisor the results of your review.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information for Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

If a CRITICAL step has more than one part, then:

  • (Filled bullet) indicates a CRITICAL part of the step.

o (Open bullet) indicates a NON-CRITICAL part of the step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The time clock starts when the candidate acknowledges the initiating cue.

A-N-3-R Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT

  • 1. Evaluate valve Reviews Checklist 1, UNIT 2 performance by QUARTERLY VALVE TIMING comparing the Actual and determines the following:

Stroke Time to the _____ _____ _____

  • MO 2-1601-24 stroke close established IST ranges time is in the ALERT range listed in the DISACM.

of the DISACM.

  • 2. Evaluate valve Reviews Checklist 1, UNIT 2 performance by QUARTERLY VALVE TIMING comparing the Actual and determines the following:

Stroke Time to the _____ _____ _____

  • MO 2-1601-23 stroke close established IST ranges time is in the REQUIRED listed in the DISACM.

ACTION range of the DISACM.

  • 3. Notify Unit Supervisor Notifies Unit Supervisor of of above results above results Cue:

As the Unit Supervisor, direct examinee to determine required actions per ER-AA-321 Attachment 2.

  • 4. Per Acceptance Per Acceptance Criteria, refers Criteria, refer to to ER-AA-321, Attachment 2, ER-AA-321, and determines that MO Attachment 2, and 2-1601-24 should be _____ _____ _____

determine that MO restroked.

2-1601-24 should be restroked.

  • 5. Per Acceptance Per Acceptance Criteria and Criteria and ER-AA-321, Attachment 2, ER-AA-321, determines that MO 2-1601-23 Attachment 2, should be declared inoperable. _____ _____ _____

determine that MO 2-1601-23 should be declared inoperable.

A-N-3-R Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT

  • 6. Notify Unit Supervisor Notifies Unit Supervisor of of above results above results:
  • MO 2-1601-24 should be restroked.
7. Notify the Unit 8. Notifies the Unit Supervisor that step Supervisor that step H.3.a H.3.a is complete and is complete and the task is the task is complete. complete.

Cue:

As the Unit Supervisor, acknowledge report.

END JPM Stop Time:_________

A-N-3-R Page 6 of 8

Job Performance Measure (JPM)

Operators Name: ___________________________________

Job

Title:

RO SRO JPM

Title:

VERIFY VALVE OPERABILITY AND TIMING JPM Number: A-N-3-R Revision Number: 00 Task Number and

Title:

298L057, Perform an operability check of the following pieces of equipment: MO/AO Valves.

K/A Number and Importance: 2.2.14 3.9/4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: _______minutes

References:

DOS 1600-03, R 51, UNIT 2 QUARTERLY VALVE TIMING Dresden In-Service Testing Acceptance Criteria Manual (DISACM)

ER-AA-321 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

A-N-3-R Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS You are the Unit 2 Aux NSO.

An extra NSO just completed surveillance DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, step I.6 only for Post Maintenance testing. The other steps will be performed later.

INITIATING CUE Per step H.3.a of DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, review the completed portion of the surveillance and report to the Unit Supervisor the results of your review.

A-N-3-R Page 8 of 8

Exelon Nuclear Job Performance Measure DETERMINE RADIOLOGICAL BRIEF AND PROTECTIVE CLOTHING REQUIREMENTS JPM Number: A-N-4-R Revision Number: 00 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New for Dresden ILT 14-1 exam.

A-N-4-R Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a copy of RP-AA-460
2. Copy of survey map for Unit 3 Reactor Building, El. 545 RWCU Pump Room
3. Copy of RWP# 10004555, U3 RWCU pump room.

A-N-4-R Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Aux NSO.
2. Following maintenance, it was reported that valve 3-1201-128A, 3A RWCU RECIRC PMP SUCT VLV, appeared to have packing leakage.
3. The Unit Supervisor is unable to obtain any more information regarding the packing leakage.

INITIATING CUE

1. The Unit Supervisor has directed you to determine the radiological controls needed (if any) to investigate the leakage on 3-1201-128A.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-4-R Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

WHEN the examinee asks RP for the survey map of the area, THEN provide the map attached to this JPM.

WHEN the examinee asks RP for the RWP for the job THEN provide RWP 10004555 attached to this JPM.

If the examinee asks for the procedure for Control of High and Very High Radiation Areas, RP-AA-460, provide them with a copy.

  • 1. Examinee reviews RWP and Determines the following survey map and determines minimum protective protective clothing clothing requirements:

requirement. Zone 2 Protective Clothing

  • Modesty garments
  • Cloth hood or half hood
  • Cloth coveralls
  • Cloth shoe covers
  • Shoe rubbers
  • Glove liners
  • Rubber gloves
  • 2. Examinee reviews RWP and Determines a Locked High RP-AA-460 and determines Rad Area brief from briefing requirements to enter Radiation Protection is a Locked High Rad Area required.

(IAW RP-AA-460 step 4.4.2)

3. Informs the Unit Supervisor of Informs Unit Supervisor of clothing and briefing the information in steps 1 requirements and 2.
4. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-4-R Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO JPM

Title:

Determine Radiological Brief and protective clothing requirements Revision Number: 00 JPM Number: A-N-4-R Task Number and

Title:

299L029, Conduct shift operations K/A Number and Importance: Generic.2.3.7 3.5 / 3.6 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

RP-AA-460 Rev. 26 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-4-R Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Aux NSO.
2. Following maintenance, it was reported that valve 3-1201-128A, 3A RWCU RECIRC PMP SUCT VLV, appeared to have packing leakage.
3. The Unit Supervisor is unable to obtain any more information regarding the packing leakage.

INITIATING CUE

1. The Unit Supervisor has directed you to determine the radiological controls needed (if any) to investigate the leakage on 3-1201-128A.
2. Inform the Unit Supervisor when the task is complete.

A-N-4-R Page 7 of 7

S-RD-11 Exelon Nuclear Job Performance Measure Reportability Determination JPM Number: A-N-1-S Revision Number: 01 Date: 01/15 Developed By:

Developer Date Validated By:

SME or Instructor Date Review By:

Operations Representative Date Approved By:

Training Department Date Page 1 of 8

S-RD-10 Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure LS-AA-1120 Rev: 18 Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 8

S-RD-10 Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM created for 2013 LORT Exam.

Revision 01 Revised for use on 2015 ILT Exam.

Page 3 of 8

S-RD-10 Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS Any IC to accommodate other JPMs.

This is a table top JPM utilizing Simulator procedures.

Page 4 of 8

S-RD-10 Job Performance Measure (JPM)

INITIAL CONDITIONS An event has occurred at Dresden resulting in the following conditions:

  • A worker has been injured.
  • The individual is contaminated, and must be transported to the hospital immediately.
  • You are the Unit Supervisor.

INITIATING CUE

1. Determine the Reportability requirements, including the Event Classification and the Time Limit of any Notifications or Reports.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Operator Fundamentals: During this JPM, the evaluator should look at the Operators performance of the task in regards to the following SER 3-05 Operator Fundamentals.

Monitoring Plant Conditions and Indications Closely

  • Know and monitor critical parameters
  • Understand limitations/design of indications
  • Use multiple indications
  • Give attention to detail
  • Uses procedures, clearances, or other documents to change plant configuration
  • Do not deviate from procedures
  • Uses error reduction techniques effectively
  • Have a low problem threshold Page 5 of 8

S-RD-10 Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT

  • 1. Determines the event is Determines the event is reportable per RAD 1.6 reportable per RAD 1.6 Transport of contaminated person to Medical Facility _____ _____ _____
  • 2. Determines the time limit Determines the time limit to to make a phone report make a phone report is 8 is 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to NRC hours to NRC.

END JPM Stop Time:_________

Page 6 of 8

S-RD-10 Job Performance Measure (JPM)

Operators Name: ___________________________________

Job

Title:

SRO SRO Cert JPM

Title:

Reportability Determination JPM Number: A-N-1-S Revision Number: 01 Task Number and

Title:

299L001, Determine Reportability requirements as outlined in station Reportability manual.

K/A Number and Importance: 2.1.1 --/4.2 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate SRO Only: Yes No Perform Alternate Path: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: _______minutes

References:

LS-AA-1120 rev 18 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Page 7 of 8

S-RD-10 Job Performance Measure (JPM)

INITIAL CONDITIONS An event has occurred at Dresden resulting in the following conditions:

  • A worker has been injured.
  • The individual is contaminated, and must be transported to the hospital immediately.
  • You are the Unit Supervisor.

INITIATING CUE

2. Determine the Reportability requirements, including the Event Classification and the Time Limit of any Notifications or Reports.

Page 8 of 8

Exelon Nuclear Job Performance Measure DETERMINATION OF ON LINE RISK JPM Number: A-N-2-S Revision Number: 00 Date: 01/15 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM for 2015 NRC exam.

A-N-2-S Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Simulator Center Desk computer cleared and available.

DOCUMENT PREPARATION

1. None.

A-N-2-S Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Supervisor.
2. Unit 2 and Unit 3 are at near rated power.
3. The 345kv BT CB 8-15 has failed open and will take 2 days to repair.
4. The U3 Isolation Condenser is scheduled to come OOS the next shift.

INITIATING CUE

1. The Shift Manager requests that you run Paragon to determine the current On- line Risk; AND,
2. Determine the fire risk if the Isolation Condenser work is allowed.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-2-S Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Have center desk computer up and on the desktop screen

1. Enter Paragon. Clicks on the ICON for Paragon.

CUE:

When asked login is simcr, and no password is required

2. Select Operations Module Selects Operations Module when 3 options are on screen
3. Selects Switchyard Tab, then Clicks on Switchyard tab significant breakers. and then clicks on significant breakers. _____ _____ _____
  • 4. Select OCB 8-15 and selects Clicks on OCB 8-15, then unavailable. clicks on unavailable,
  • 5. Select Execute. Determine Runs program identifies that On-line is YELLOW. On-line risk is YELLOW.
6. Select ECCS Tab. Clicks on ECCS Tab.
  • 7. Select Isolation Condenser, Clicks on Isolation then unavailable. Condenser, then clicks on unavailable. _____ _____ _____
  • 8. Select Execute. Determine Runs program and that fire risk is YELLOW if identifies fire risk is Isolation Condenser is taken YELLOW if Isolation _____ _____ _____

OOS. Condenser is taken OOS.

A-N-2-S Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

8. Report to Shift Manager that Reports to Shift Manager current On-Line Risk is that current On-Line Risk YELLOW and fire risk will be is YELLOW and fire risk YELLOW if the Isolation will be YELLOW if the _____ _____ _____

Condenser work is allowed. Isolation Condenser work is allowed.

CUE:

Acknowledge the report END JPM Stop Time:_________

A-N-2-S Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

REVIEW OFF-SITE POWER SOURCES AVAILABLE PAPERWORK Revision Number: 00 JPM Number: A-N-2-S Task Number and

Title:

CM198081 Determine on line risk and protected pathway equipment per WC

-AA-101, OP-AA-117, and OP-DR-108-117-1001.

K/A Number and Importance: Generic.2.1.19 3.9/3.8 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

WC-AA-101 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-2-S Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 US.
2. Unit 2 and Unit 3 are at near rated power.
3. The 345kv BT CB 8-15 has failed open and will take 2 days to repair.
4. The U3 Isolation Condenser is scheduled to come OOS the next shift.

INITIATING CUE

1. The Shift Manager request that you run Paragon to determine current On-line Risk; AND,
2. Determine the fire risk if the Isolation Condenser work is allowed.

A-N-2-S Page 8 of 8

Exelon Nuclear Job Performance Measure DECLARE EDG OPERABLE AFTER SURVEILLANCE REVIEW JPM Number: A-N-3-S Revision Number: 01 Date: 01/15 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Modified JPM for ILT 12-1 (2013-301) NRC Exam.

Revision 01 Revise for ILT 14-1 NRC Exam.

A-N-3-S Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a marked up copy of DOS 6600-01 A-N-3-S Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Unit Supervisor.
2. The Unit 3 EDG was run for a normal even month surveillance.
3. No maintenance was performed on the Unit 3 EDG.
4. The Unit 3 NSO has completed DOS 6600-01, DIESEL GENERATOR SURVEILLANCE TESTS for the Unit 3 EDG.

INITIATING CUE

1. Verify the Unit 3 EDG surveillance has been completed correctly.
2. Review the surveillance and determine the operability of the Unit 3 EDG.
3. Inform the Shift Manager when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-3-S Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DOS 6600-01 NOTE:

Other unidentified errors exist. Only items marked as critical are required.

  • 1. Verify D/G has operated for Recognizes that the diesel

> 60 minutes with a load of ran for less than 60 2340 to 2600 kW minutes. Acceptance criteria not met. _____ _____ _____

  • 2. Diesel fuel oil day tank level > Recognizes that Diesel 29.5 inches (for U2 or U3 fuel oil day tank level is EDG) less than 29.5 inches Acceptance criteria not _____ _____ _____

met.

  • 3. Verify D/G START AIR A1/A2 Recognizes that A1/A2 RECEIVER TANK pressure in RECEIVER TANK Step 3.a.(16) is greater than pressure is not greater D/G START AIR B1/B2 than B1/B2 RECEIVER RECEIVER TANK in Step TANK pressure.

3.a.(16) Acceptance criteria not _____ _____ _____

met.

4. IF air pressure between Recognizes that an issue banks has equalized, THEN report needs to be initiate an Issue Report to generated to repair the repair check valve. check valve. _____ _____ _____
5. Verify A compressor stops Recognizes that the A between 245 and 260 psig. compressor stopped > 260 psig. _____ _____ _____
6. IF Compressor A OR "B" Recognizes that stop pressures are NOT compressor A did not stop within expected range (224 to within the expected range 260 psig), THEN contact the (265 psig), the System Plant Engineering System Engineer needs to be Manager AND initiate an contacted. _____ _____ _____

Issue Report.

A-N-3-S Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

7. Notify System Engineer that Notifies System Engineer A compressor did not stop at that A compressor did not the expected band. start at the expected band. _____ _____ _____
  • 8. Declare D/G Operable Recognizes that the Acceptance Criteria for the Unit 3 EDG is not met and _____ _____ _____

determines the EDG is inoperable.

9. Informs Shift Manager task is Examinee notifies the Shift complete. Manager.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-3-S Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

DECLARE EDG OPERABLE AFTER SURVEILLANCE REVIEW Revision Number: 01 JPM Number: A-N-3-S Task Number and

Title:

264L009, Perform Surveillance Testing K/A Number and Importance: Generic 2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

DOS 6600-01, rev 127 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-3-S Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Unit Supervisor.
2. The Unit 3 EDG was run for a normal even month surveillance.
3. No maintenance was performed on the Unit 3 EDG.
4. The Unit 3 NSO has completed DOS 6600-01, DIESEL GENERATOR SURVEILLANCE TESTS for the Unit 3 EDG.

INITIATING CUE

1. Verify the Unit 3 EDG surveillance has been completed correctly.
2. Review the surveillance and determine the operability of the Unit 3 EDG.
3. Inform the Shift Manager when the task is complete.

A-N-3-S Page 8 of 8

Exelon Nuclear Job Performance Measure SELECT PERSONNEL FOR RADIATION WORK JPM Number: A-N-4-S Revision Number: 00 Date: 01/15 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Modified JPM for ILT 12-1 (2013-301) NRC Exam.

Revision 01 Revised for ILT 14-1 NRC Exam.

A-N-4-S Page 2 of 10

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Markup a copy of an RWP for the Unit 3 RWCU Pump Room.
2. Markup a survey map for the Unit 3 RWCU Pump Room.
3. Clean copy of RP-AA-203.

A-N-4-S Page 3 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are a Unit Supervisor and will be briefing NLOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555.
2. Five NLOs are available this shift.
  • None of the five have received dose at any location other than Dresden Station.
  • None of the five have received dose since midnight on any RWPs other than 10004555.
3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five NLOs to assist you in your planning:

DDE dose received on Annual TEDE dose Name RWP 10004555 Today To Date Alex 40 mrem 1550 mrem Dan 5 mrem 1950 mrem Mike 0 mrem 1920 mrem Sue 45 mrem 1850 mrem Tom 10 mrem 1750 mrem

4. The total expected stay time for each NLO will be 60 minutes. Based on past job history, it will breakdown as follows:
  • 45 minutes total in the area near the following two valves:

3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)

  • 15 minutes total in the area near the following one valve:

3-1201-128A A RWCU Pump Suction (at A RWCU Pump)

INITIATING CUE

1. CALCULATE the expected dose for the work in RWCU Pump Room. DETERMINE which NLO(s) CAN and which NLO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.

A-N-4-S Page 4 of 10

Job Performance Measure (JPM)

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-4-S Page 5 of 10

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of the RWP and survey map of the RWCU pump room and the supplied copy of RP-AA-203.

The following steps may be performed in any order.

1. Reviews Survey Maps to Reviews the survey maps determine area dose rates. and determines area dose rates to be 50 mr/hr for the first group of 2 valves and _____ _____ _____

160 mr/hr for the remaining valve.

NOTE:

The following calculations should be made:

2 valve clearance projected dose = 0.75 hr x 40 mr/hr = 30 mrem 1 valve clearance projected dose = 0.25 hr x 140 mr/hr = 35 mrem Total projected dose for the job = 40 mrem + 30 mrem = 65 mrem

  • 2. Calculates that the projected Determines the NLOs will dose that will be received for receive 30 mrem on the the task is 65 mrem. first 2 valves and 35 on the next valve. _____ _____ _____

CUE:

IF the candidate inquires whether or not any of the NLOs has received permission to exceed any dose limits, respond: None of the Non Licensed Operators have received permission to exceed any limits.

NOTE:

The following steps may be performed in any order.

  • 3. Determines that ALEX Alexs total daily dose on CAN NOT perform the job RWP 10004555 would be because he would exceed the 105 mrem.

80 mrem dose alarm on RWP _____ _____ _____

10004555.

A-N-4-S Page 6 of 10

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 4. Determines that Dan Dans total Annual dose CAN NOT perform the job would be 2015 mrem.

because he would exceed the 2000 mrem Exelon Annual _____ _____ _____

limit.

  • 5. Determines that Mike CAN Mikes total RWP daily perform the job because no dose and Annual dose will limits will be exceeded. remain below the limits.
  • 6. Determines that Sue Sues total daily dose on CAN NOT perform the job RWP 10004555 would be because she would exceed 110 mrem.

the 80 mrem dose alarm on RWP 10004555.

  • 7. Determines that Tom CAN Toms total RWP daily perform the job because no dose and Annual dose will limits will be exceeded. remain below the limits.

END JPM Stop Time:_________

A-N-4-S Page 7 of 10

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

SELECT PERSONEL FOR RADIATION WORK Revision Number: 01 JPM Number: A-N-4-S Task Number and

Title:

29900LK119, Discuss the items to be considered prior to work authorization K/A Number and Importance: Generic.2.3.13 3.4 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

RP-AA-203, rev 03 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-4-S Page 8 of 10

Job Performance Measure (JPM)

KEY EVALUATOR: The candidate must determine that dose for the task will be 65 mrem and determine that only two NLOs can receive the dose, necessary to complete the task. They are Mike and Tom. See the table below for projected job dose, 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> total dose on RWP 10004555, and total Annual TEDE dose for each Operator.

Calculation:

2 valves clearance (at RWCU Aux Pump) projected dose = 0.75 hr x 40 mr/hr =

30mrem 1 valve clearance (at A RWCU Pump) projected dose = 0.25hr x 140 mr/hr =

35mrem 30mrem + 35 mrem = 65 mrem projected job dose for clearance order hanging DDE dose Annual TEDE Projected dose on Projected Annual TEDE Name received on RWP dose as of RWP 10004555 (including all dose from 10004555 today Midnight To Date for the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)

(40 + 65 =) (1550 + 65 =)

Alex 40 mrem 1550 mrem 105 mrem 1615 mrem (5 + 65 =) (1950 + 65 =)

Dan 5 mrem 1950 mrem 70 mrem 2015 mrem (0 + 65 =) (1920 + 65 =)

Mike 0 mrem 1920 mrem 65 mrem 1985 mrem (45 + 65 =) (1850 + 65 =)

Sue 45 mrem 1850 mrem 110 mrem 1915 mrem (10 + 65 =) (1750 + 65 =)

Tom 10 mrem 1750 mrem 75 mrem 1815 mrem The bolded values in the table exceed the applicable Company, RWP, or 10CFR limit.

A-N-4-S Page 9 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are a Unit Supervisor and will be briefing NLOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555.
2. Five NLOs are available this shift.
  • None of the five have received dose at any location other than Dresden Station.
  • None of the five have received dose since midnight on any RWPs other than 10004555.
3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five NLOs to assist you in your planning:

DDE dose received on Annual TEDE dose Name RWP 10004555 Today To Date Alex 40 mrem 1550 mrem Dan 5 mrem 1950 mrem Mike 0 mrem 1920 mrem Sue 45 mrem 1850 mrem Tom 10 mrem 1750 mrem

4. The total expected stay time for each NLO will be 60 minutes. Based on past job history, it will breakdown as follows:
  • 45 minutes total in the area near the following two valves:

3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)

  • 15 minutes total in the area near the following one valve:

3-1201-128A A RWCU Pump Suction (at A RWCU Pump)

INITIATING CUE

1. CALCULATE the expected dose for the work in RWCU Pump Room.

DETERMINE which NLO(s) CAN and which NLO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.

A-N-4-S Page 10 of 10

Exelon Nuclear Job Performance Measure DETERMINE EMERGENCY CLASSIFICATION AND FILL OUT NARS FORM JPM Number: A-N-5-S Revision Number: 01 Date: 01/15 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM developed for. . . . . . . . .

Revision 01 Revised for ILT 14-1 NRC A-N-5-S Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Screenshot of meteorological data.

A-N-5-S Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. This is a time critical JPM.
2. You are the Shift Emergency Director.
3. Unit 2 was operating at near rated conditions when a transient occurred causing ALL high pressure feed to be lost and RPV water level dropped to -20 inches.
4. An automatic scram did NOT occur.
5. The Unit 2 NSO initiated a manual scram and initiated ARI.
6. One (1) minute after the manual scram was initiated, the following conditions exist:
  • SBLC is injecting with one pump.
  • Drywell pressure is 2.5 psig and steady.
  • Drywell temperature is 138oF and steady.
  • Torus temperature is 117oF and rising slowly.
  • RPV Pressure is 920 psig and dropping slowly.
  • Reactor power is 10% and steady on the APRMs.
  • RPV water level is -170 inches and dropping rapidly.

INITIATING CUES

1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.

A-N-5-S Page 4 of 8

Job Performance Measure (JPM)

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-5-S Page 5 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Examinee locates a copy of Radiological Emergency Plan Annex for Dresden EP-AA-1004 charts.

Provide the supplied NARS Form.

Provide the supplied screen shot of the meteorological data.

  • 1. Determines a classification of Determines highest GENERAL EMERGENCY, classification is a SITE due to a the failure of an EMERGENCY per EAL _____ _____ _____

automatic AND manual scram MS2 (15 minute AND there is an indication of requirement).

an extreme challenge to the ability to cool the core.

NOTE:

Determines classification start time _______ and stop time _______ .

(15 minute limit)

NOTE:

Automatic scram, manual scram, and ARI were not successful from Reactor Console

  • Reactor power is 17% on the APRMs AND
  • RPV water level is -182 inches and dropping rapidly with NO high pressure feed available
  • 2. Properly fills out NARS form. See attached key for the areas that must be filled out correctly (13 minute requirement): _____ _____ _____

NOTE:

Fill out NARS form start time (when declaration completed) _______ and stop time _______ .

(13 minute limit)

END JPM Stop Time:_________

A-N-5-S Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

DETERMINE EMERGENCY CLASSIFICATION and fill out nars form Revision Number: 01 JPM Number: A-N-5-S Task Number and

Title:

295L160, Given a plant in an off normal condition, determine the EP classification K/A Number and Importance: Generic.2.4.44 2.4 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 (declare) 13 (fill out) minutes Actual Time Used: minutes

References:

EP-AA-1004, Addendum 3, Rev 00 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-5-S Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. This is a time critical JPM.
2. You are the Shift Emergency Director.
3. Unit 2 was operating at near rated conditions when a transient occurred causing ALL high pressure feed to be lost and RPV water level dropped to -

20 inches.

4. An automatic scram did NOT occur.
5. The Unit 2 NSO initiated a manual scram and initiated ARI.
6. One (1) minute after the manual scram was initiated, the following conditions exist:
  • SBLC is injecting with one pump.
  • Drywell pressure is 2.5 psig and steady.
  • Drywell temperature is 138oF and steady.
  • Torus temperature is 117oF and rising slowly.
  • RPV Pressure is 920 psig and dropping slowly.
  • Reactor power is 10% and steady on the APRMs.
  • RPV water level is -170 inches and dropping rapidly.

INITIATING CUES

1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form.

Give the NARS form to the WEC Supervisor, who will make the state notification.

A-N-5-S Page 8 of 8

Exelon Nuclear Job Performance Measure REVIEW ACCEPTANCE CRITERIA MET FOR THE ACCOUSTIC MONITOR JPM Number: A-N-1-R Revision Number: 04 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 02 Bank JPM.

Revision 03 Revised for ILT 09-1 NRC Exam.

Revision 04 Revised for ILT 14-1 NRC Exam.

A-N-1-R Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Mark up a copy of DOS 0250-06, Acoustic Monitor Temperature Detector Instrument (Channel) Check.

A-N-1-R Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Aux NSO.
2. DOS 0250-06 was performed last shift, for the Acoustic Monitor / Temperature Detector Operability Test.
3. The off-going NSO was unable to verify the paperwork, and has turned it over to you.
4. The NSO reported all surveillance requirements were within specifications INITIATING CUE
1. Verify ALL requirements are within specifications, and paperwork is correct.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-1-R Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the supplied copy of DOS 0250-06.

  • 1. Examinee should identify Identifies out of spec data sheet valve 203-3C value.

threshold volt is out of spec. _____ _____ _____

  • 2. Examinee should identify Identifies out of spec data sheet valve 203-4A value.

threshold volt is out of spec. _____ _____ _____

3. Examinee should identify Identifies N/Ad step.

data sheet valve 203-3D H-19 in Alarm AND Alarm _____ _____ _____

Reset steps that should NOT be N/Ad.

  • 4. Examinee should identify Identifies 2 temperatures >

data sheet valves 203-3B and 100oF difference.

203-4G discharge temps are

> 100oF difference. _____ _____ _____

5. Examinee should either Reports discrepancies to report discrepancies to Unit Unit Supervisor OR signs Supervisor OR sign the the Calculations Verified Calculations Verified By By line. _____ _____ _____

line.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-1-R Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO JPM

Title:

REVIEW ACCEPTANCE CRITERIA MET FOR THE ACCOUSTIC MONITOR Revision Number: 04 JPM Number: A-N-1-R Task Number and

Title:

299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures.

K/A Number and Importance: Generic.2.1.7 4.4 / 4.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

DOS 0250-06, rev 14 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-1-R Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Aux NSO.
2. DOS 0250-06 was performed last shift, for the Acoustic Monitor /

Temperature Detector Operability Test.

3. The off-going NSO was unable to verify the paperwork, and has turned it over to you.
4. The NSO reported all surveillance requirements were within specifications INITIATING CUE
1. Verify ALL requirements are within specifications, and paperwork is correct.

A-N-1-R Page 7 of 7

Exelon Nuclear Job Performance Measure PERFORM ASSIST NSO DAILY LOG FOR U1 AND 2/3 CONDENSATE STORAGE TANKS INVENTORY CALCULATIONS JPM Number: A-N-2-R Revision Number: 01 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Modified for 2013 Cert Exam.

Revision 01 Modified for 14-1 NRC Exam.

A-N-2-R Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC, with the following conditions:
a. 2/3A CST level is 15 ft.
b. 2/3B CST level is 16 ft.

DOCUMENT PREPARATION

1. Provide a clean copy of Appendix B, ASSIST NSO DAILY SURVEILLANCE LOG, Attachment A, page 19.
2. Photo of the 2/3 CST level meters on the 902-6 panel.

A-N-2-R Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Both units are operating at near rated power.
3. Today is Monday shift 1.
4. Unit 1A CST level is 26%.

INITIATING CUE

1. The Unit Supervisor has directed you to complete Appendix B, Attachment A, page 19, for the Unit 1 and 2/3 Condensate Storage Tanks Inventory.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-2-R Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of Appendix B, Attachment A.

Do NOT provide the supplied photo until correct meters are identified.

1. Examinee identifies and Fills out all values on the utilizes the Monday shift 1 Monday shift 1 slot.

slot. _____ _____ _____

  • 2. Records value of 26% for See attached KEY.

U1A CST in INDICATED LEVEL column. _____ _____ _____

CUE:

When examinee locates correct meters, provide the supplied photo of the meters.

  • 3. Locates meters, on the 902-6 See attached KEY.

panel, for 2/3A and 2/3B CSTs and records correct value in INDICATED LEVEL column:

2/3A CST 15.0 2/3B CST 16.0 _____ _____ _____

  • 4. Examinee calculates values See attached KEY.

and records them in CORRECTED LEVEL column:

U1A CST 19.0 2/3A CST 13.0 2/3B CST 14.0

  • 5. Examinee calculates values See attached KEY.

and records them in ACTUAL LEVEL column:

U1A CST 38,000 2/3A CST 104,000 _____ _____ _____

2/3B CST 112,000 A-N-2-R Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 6. Examinee calculates value See attached KEY.

and records it in TOTAL CST GALLONS block:

Total: 254,000 _____ _____ _____

  • 7. Examinee identifies that Examinee notifies the Unit TOTAL GALLONS are Supervisor of value and

<260,000 (130,000 per each that minimum required _____ _____ _____

unit). inventory is not met.

8. Informs Unit Supervisor Examinee notifies the Unit Independent verification is Supervisor.

required and task is _____ _____ _____

complete.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-2-R Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO JPM

Title:

PERFORM ASSIST NSO DAILY LOG FOR U1 AND 2/3 CONDENSATE STORAGE TANKS INVENTORY CALCULATIONS.

Revision Number: 01 JPM Number: A-N-2-R Task Number and

Title:

29800LP013, Perform the duties of a Unit NSO including monitoring the unit, answering the phones and radio, completing logs, surveillances, and daily sheets, and filling out and conducting a shift turnover.

K/A Number and Importance: Generic.2.1.18 3.6 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

Appendix B, rev 80 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-2-R Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Both units are operating at near rated power.
3. Today is Monday shift 1.
4. Unit 1A CST is 26%.

INITIATING CUE

1. The Unit Supervisor has directed you to complete Appendix B, Attachment A, page 19, for the Unit 1 and 2/3 Condensate Storage Tanks Inventory.
2. Inform the Unit Supervisor when the task is complete.

A-N-2-R Page 8 of 8

Exelon Nuclear Job Performance Measure VERIFY VALVE OPERABILITY AND TIMING JPM Number: A-N-3-R Revision Number: 00 Date: 12/14 Developed By:

Instructor Date Approved By:

Training Department Date A-N-3-R Page 1 of 8

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM for ILT 14-1 NRC Exam A-N-3-R Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS Use any IC that accommodates other JPMs.

This is a table top JPM utilizing Simulator procedures.

Verify the DISACM is available.

PROCEDURE PREPARATION Mark up a copy of DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, as follows:

o Indicate that testing is complete for step I.6. Leave the other steps blank.

o For MO 2-1601-24, enter a close stroke time in the ALERT range of the DISACM.

o For MO 2-1601-23, enter a close stroke time in the REQUIRED ACTION range of the DISACM.

o For ALL other step I.6 valves, enter a time within the ACCEPTABLE range.

Provide a copy of ER-AA-321, Administrative Requirements for Inservice Testing.

A-N-3-R Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS You are the Unit 2 Aux NSO.

An extra NSO just completed surveillance DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, step I.6 only at this time. The other steps will be performed later.

INITIATING CUE Per step H.3.a of DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, review the completed portion of the surveillance and report to the Unit Supervisor the results of your review.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information for Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

If a CRITICAL step has more than one part, then:

  • (Filled bullet) indicates a CRITICAL part of the step.

o (Open bullet) indicates a NON-CRITICAL part of the step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The time clock starts when the candidate acknowledges the initiating cue.

A-N-3-R Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT

  • 1. Evaluate valve Reviews Checklist 1, UNIT 2 performance by QUARTERLY VALVE TIMING comparing the Actual and determines the following:

Stroke Time to the _____ _____ _____

  • MO 2-1601-24 stroke close established IST ranges time is in the ALERT range listed in the DISACM.

of the DISACM.

  • 2. Evaluate valve Reviews Checklist 1, UNIT 2 performance by QUARTERLY VALVE TIMING comparing the Actual and determines the following:

Stroke Time to the _____ _____ _____

  • MO 2-1601-23 stroke close established IST ranges time is in the REQUIRED listed in the DISACM.

ACTION range of the DISACM.

  • 3. Notify Unit Supervisor Notifies Unit Supervisor of of above results above results Cue:

As the Unit Supervisor, direct examinee to determine required actions per ER-AA-321 Attachment 2.

  • 4. Per Acceptance Per Acceptance Criteria, refers Criteria, refer to to ER-AA-321, Attachment 2, ER-AA-321, and determines that MO Attachment 2, and 2-1601-24 should be _____ _____ _____

determine that MO restroked.

2-1601-24 should be restroked.

  • 5. Per Acceptance Per Acceptance Criteria and Criteria and ER-AA-321, Attachment 2, ER-AA-321, determines that MO 2-1601-23 Attachment 2, should be declared inoperable. _____ _____ _____

determine that MO 2-1601-23 should be declared inoperable.

A-N-3-R Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT

  • 6. Notify Unit Supervisor Notifies Unit Supervisor of of above results above results:
  • MO 2-1601-24 should be restroked.
7. Notify the Unit 8. Notifies the Unit Supervisor that step Supervisor that step H.3.a H.3.a is complete and is complete and the task is the task is complete. complete.

Cue:

As the Unit Supervisor, acknowledge report.

END JPM Stop Time:_________

A-N-3-R Page 6 of 8

Job Performance Measure (JPM)

Operators Name: ___________________________________

Job

Title:

RO SRO JPM

Title:

VERIFY VALVE OPERABILITY AND TIMING JPM Number: A-N-3-R Revision Number: 00 Task Number and

Title:

298L057, Perform an operability check of the following pieces of equipment: MO/AO Valves.

K/A Number and Importance: 2.2.14 3.9/4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: _______minutes

References:

DOS 1600-03, R 51, UNIT 2 QUARTERLY VALVE TIMING Dresden In-Service Testing Acceptance Criteria Manual (DISACM)

ER-AA-321 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

A-N-3-R Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS You are the Unit 2 Aux NSO.

An extra NSO just completed surveillance DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, step I.6 only for Post Maintenance testing. The other steps will be performed later.

INITIATING CUE Per step H.3.a of DOS 1600-03, UNIT 2 QUARTERLY VALVE TIMING, review the completed portion of the surveillance and report to the Unit Supervisor the results of your review.

A-N-3-R Page 8 of 8

Exelon Nuclear Job Performance Measure DETERMINE RADIOLOGICAL BRIEF AND PROTECTIVE CLOTHING REQUIREMENTS JPM Number: A-N-4-R Revision Number: 00 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New for Dresden ILT 14-1 exam.

A-N-4-R Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a copy of RP-AA-460
2. Copy of survey map for Unit 3 Reactor Building, El. 545 RWCU Pump Room
3. Copy of RWP# 10004555, U3 RWCU pump room.

A-N-4-R Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Aux NSO.
2. Following maintenance, it was reported that valve 3-1201-128A, 3A RWCU RECIRC PMP SUCT VLV, appeared to have packing leakage.
3. The Unit Supervisor is unable to obtain any more information regarding the packing leakage.

INITIATING CUE

1. The Unit Supervisor has directed you to determine the radiological controls needed (if any) to investigate the leakage on 3-1201-128A.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-4-R Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

WHEN the examinee asks RP for the survey map of the area, THEN provide the map attached to this JPM.

WHEN the examinee asks RP for the RWP for the job THEN provide RWP 10004555 attached to this JPM.

If the examinee asks for the procedure for Control of High and Very High Radiation Areas, RP-AA-460, provide them with a copy.

  • 1. Examinee reviews RWP and Determines the following survey map and determines minimum protective protective clothing clothing requirements:

requirement. Zone 2 Protective Clothing

  • Modesty garments
  • Cloth hood or half hood
  • Cloth coveralls
  • Cloth shoe covers
  • Shoe rubbers
  • Glove liners
  • Rubber gloves
  • 2. Examinee reviews RWP and Determines a Locked High RP-AA-460 and determines Rad Area brief from briefing requirements to enter Radiation Protection is a Locked High Rad Area required.

(IAW RP-AA-460 step 4.4.2)

3. Informs the Unit Supervisor of Informs Unit Supervisor of clothing and briefing the information in steps 1 requirements and 2.
4. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-4-R Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO JPM

Title:

Determine Radiological Brief and protective clothing requirements Revision Number: 00 JPM Number: A-N-4-R Task Number and

Title:

299L029, Conduct shift operations K/A Number and Importance: Generic.2.3.7 3.5 / 3.6 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

RP-AA-460 Rev. 26 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-4-R Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Aux NSO.
2. Following maintenance, it was reported that valve 3-1201-128A, 3A RWCU RECIRC PMP SUCT VLV, appeared to have packing leakage.
3. The Unit Supervisor is unable to obtain any more information regarding the packing leakage.

INITIATING CUE

1. The Unit Supervisor has directed you to determine the radiological controls needed (if any) to investigate the leakage on 3-1201-128A.
2. Inform the Unit Supervisor when the task is complete.

A-N-4-R Page 7 of 7

S-RD-11 Exelon Nuclear Job Performance Measure Reportability Determination JPM Number: A-N-1-S Revision Number: 01 Date: 01/15 Developed By:

Developer Date Validated By:

SME or Instructor Date Review By:

Operations Representative Date Approved By:

Training Department Date Page 1 of 8

S-RD-10 Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure LS-AA-1120 Rev: 18 Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 8

S-RD-10 Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM created for 2013 LORT Exam.

Revision 01 Revised for use on 2015 ILT Exam.

Page 3 of 8

S-RD-10 Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS Any IC to accommodate other JPMs.

This is a table top JPM utilizing Simulator procedures.

Page 4 of 8

S-RD-10 Job Performance Measure (JPM)

INITIAL CONDITIONS An event has occurred at Dresden resulting in the following conditions:

  • A worker has been injured.
  • The individual is contaminated, and must be transported to the hospital immediately.
  • You are the Unit Supervisor.

INITIATING CUE

1. Determine the Reportability requirements, including the Event Classification and the Time Limit of any Notifications or Reports.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Operator Fundamentals: During this JPM, the evaluator should look at the Operators performance of the task in regards to the following SER 3-05 Operator Fundamentals.

Monitoring Plant Conditions and Indications Closely

  • Know and monitor critical parameters
  • Understand limitations/design of indications
  • Use multiple indications
  • Give attention to detail
  • Uses procedures, clearances, or other documents to change plant configuration
  • Do not deviate from procedures
  • Uses error reduction techniques effectively
  • Have a low problem threshold Page 5 of 8

S-RD-10 Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT

  • 1. Determines the event is Determines the event is reportable per RAD 1.6 reportable per RAD 1.6 Transport of contaminated person to Medical Facility _____ _____ _____
  • 2. Determines the time limit Determines the time limit to to make a phone report make a phone report is 8 is 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to NRC hours to NRC.

END JPM Stop Time:_________

Page 6 of 8

S-RD-10 Job Performance Measure (JPM)

Operators Name: ___________________________________

Job

Title:

SRO SRO Cert JPM

Title:

Reportability Determination JPM Number: A-N-1-S Revision Number: 01 Task Number and

Title:

299L001, Determine Reportability requirements as outlined in station Reportability manual.

K/A Number and Importance: 2.1.1 --/4.2 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate SRO Only: Yes No Perform Alternate Path: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: _______minutes

References:

LS-AA-1120 rev 18 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Page 7 of 8

S-RD-10 Job Performance Measure (JPM)

INITIAL CONDITIONS An event has occurred at Dresden resulting in the following conditions:

  • A worker has been injured.
  • The individual is contaminated, and must be transported to the hospital immediately.
  • You are the Unit Supervisor.

INITIATING CUE

2. Determine the Reportability requirements, including the Event Classification and the Time Limit of any Notifications or Reports.

Page 8 of 8

Exelon Nuclear Job Performance Measure DETERMINATION OF ON LINE RISK JPM Number: A-N-2-S Revision Number: 00 Date: 01/15 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM for 2015 NRC exam.

A-N-2-S Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Simulator Center Desk computer cleared and available.

DOCUMENT PREPARATION

1. None.

A-N-2-S Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Supervisor.
2. Unit 2 and Unit 3 are at near rated power.
3. The 345kv BT CB 8-15 has failed open and will take 2 days to repair.
4. The U3 Isolation Condenser is scheduled to come OOS the next shift.

INITIATING CUE

1. The Shift Manager requests that you run Paragon to determine the current On- line Risk; AND,
2. Determine the fire risk if the Isolation Condenser work is allowed.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-2-S Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Have center desk computer up and on the desktop screen

1. Enter Paragon. Clicks on the ICON for Paragon.

CUE:

When asked login is simcr, and no password is required

2. Select Operations Module Selects Operations Module when 3 options are on screen
3. Selects Switchyard Tab, then Clicks on Switchyard tab significant breakers. and then clicks on significant breakers. _____ _____ _____
  • 4. Select OCB 8-15 and selects Clicks on OCB 8-15, then unavailable. clicks on unavailable,
  • 5. Select Execute. Determine Runs program identifies that On-line is YELLOW. On-line risk is YELLOW.
6. Select ECCS Tab. Clicks on ECCS Tab.
  • 7. Select Isolation Condenser, Clicks on Isolation then unavailable. Condenser, then clicks on unavailable. _____ _____ _____
  • 8. Select Execute. Determine Runs program and that fire risk is YELLOW if identifies fire risk is Isolation Condenser is taken YELLOW if Isolation _____ _____ _____

OOS. Condenser is taken OOS.

A-N-2-S Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

8. Report to Shift Manager that Reports to Shift Manager current On-Line Risk is that current On-Line Risk YELLOW and fire risk will be is YELLOW and fire risk YELLOW if the Isolation will be YELLOW if the _____ _____ _____

Condenser work is allowed. Isolation Condenser work is allowed.

CUE:

Acknowledge the report END JPM Stop Time:_________

A-N-2-S Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

REVIEW OFF-SITE POWER SOURCES AVAILABLE PAPERWORK Revision Number: 00 JPM Number: A-N-2-S Task Number and

Title:

CM198081 Determine on line risk and protected pathway equipment per WC

-AA-101, OP-AA-117, and OP-DR-108-117-1001.

K/A Number and Importance: Generic.2.1.19 3.9/3.8 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

WC-AA-101 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-2-S Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 US.
2. Unit 2 and Unit 3 are at near rated power.
3. The 345kv BT CB 8-15 has failed open and will take 2 days to repair.
4. The U3 Isolation Condenser is scheduled to come OOS the next shift.

INITIATING CUE

1. The Shift Manager request that you run Paragon to determine current On-line Risk; AND,
2. Determine the fire risk if the Isolation Condenser work is allowed.

A-N-2-S Page 8 of 8

Exelon Nuclear Job Performance Measure DECLARE EDG OPERABLE AFTER SURVEILLANCE REVIEW JPM Number: A-N-3-S Revision Number: 01 Date: 01/15 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Modified JPM for ILT 12-1 (2013-301) NRC Exam.

Revision 01 Revise for ILT 14-1 NRC Exam.

A-N-3-S Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a marked up copy of DOS 6600-01 A-N-3-S Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Unit Supervisor.
2. The Unit 3 EDG was run for a normal even month surveillance.
3. No maintenance was performed on the Unit 3 EDG.
4. The Unit 3 NSO has completed DOS 6600-01, DIESEL GENERATOR SURVEILLANCE TESTS for the Unit 3 EDG.

INITIATING CUE

1. Verify the Unit 3 EDG surveillance has been completed correctly.
2. Review the surveillance and determine the operability of the Unit 3 EDG.
3. Inform the Shift Manager when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-3-S Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DOS 6600-01 NOTE:

Other unidentified errors exist. Only items marked as critical are required.

  • 1. Verify D/G has operated for Recognizes that the diesel

> 60 minutes with a load of ran for less than 60 2340 to 2600 kW minutes. Acceptance criteria not met. _____ _____ _____

  • 2. Diesel fuel oil day tank level > Recognizes that Diesel 29.5 inches (for U2 or U3 fuel oil day tank level is EDG) less than 29.5 inches Acceptance criteria not _____ _____ _____

met.

  • 3. Verify D/G START AIR A1/A2 Recognizes that A1/A2 RECEIVER TANK pressure in RECEIVER TANK Step 3.a.(16) is greater than pressure is not greater D/G START AIR B1/B2 than B1/B2 RECEIVER RECEIVER TANK in Step TANK pressure.

3.a.(16) Acceptance criteria not _____ _____ _____

met.

4. IF air pressure between Recognizes that an issue banks has equalized, THEN report needs to be initiate an Issue Report to generated to repair the repair check valve. check valve. _____ _____ _____
5. Verify A compressor stops Recognizes that the A between 245 and 260 psig. compressor stopped > 260 psig. _____ _____ _____
6. IF Compressor A OR "B" Recognizes that stop pressures are NOT compressor A did not stop within expected range (224 to within the expected range 260 psig), THEN contact the (265 psig), the System Plant Engineering System Engineer needs to be Manager AND initiate an contacted. _____ _____ _____

Issue Report.

A-N-3-S Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

7. Notify System Engineer that Notifies System Engineer A compressor did not stop at that A compressor did not the expected band. start at the expected band. _____ _____ _____
  • 8. Declare D/G Operable Recognizes that the Acceptance Criteria for the Unit 3 EDG is not met and _____ _____ _____

determines the EDG is inoperable.

9. Informs Shift Manager task is Examinee notifies the Shift complete. Manager.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-3-S Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

DECLARE EDG OPERABLE AFTER SURVEILLANCE REVIEW Revision Number: 01 JPM Number: A-N-3-S Task Number and

Title:

264L009, Perform Surveillance Testing K/A Number and Importance: Generic 2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

DOS 6600-01, rev 127 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-3-S Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Unit Supervisor.
2. The Unit 3 EDG was run for a normal even month surveillance.
3. No maintenance was performed on the Unit 3 EDG.
4. The Unit 3 NSO has completed DOS 6600-01, DIESEL GENERATOR SURVEILLANCE TESTS for the Unit 3 EDG.

INITIATING CUE

1. Verify the Unit 3 EDG surveillance has been completed correctly.
2. Review the surveillance and determine the operability of the Unit 3 EDG.
3. Inform the Shift Manager when the task is complete.

A-N-3-S Page 8 of 8

Exelon Nuclear Job Performance Measure SELECT PERSONNEL FOR RADIATION WORK JPM Number: A-N-4-S Revision Number: 00 Date: 01/15 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Modified JPM for ILT 12-1 (2013-301) NRC Exam.

Revision 01 Revised for ILT 14-1 NRC Exam.

A-N-4-S Page 2 of 10

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Markup a copy of an RWP for the Unit 3 RWCU Pump Room.
2. Markup a survey map for the Unit 3 RWCU Pump Room.
3. Clean copy of RP-AA-203.

A-N-4-S Page 3 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are a Unit Supervisor and will be briefing NLOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555.
2. Five NLOs are available this shift.
  • None of the five have received dose at any location other than Dresden Station.
  • None of the five have received dose since midnight on any RWPs other than 10004555.
3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five NLOs to assist you in your planning:

DDE dose received on Annual TEDE dose Name RWP 10004555 Today To Date Alex 40 mrem 1550 mrem Dan 5 mrem 1950 mrem Mike 0 mrem 1920 mrem Sue 45 mrem 1850 mrem Tom 10 mrem 1750 mrem

4. The total expected stay time for each NLO will be 60 minutes. Based on past job history, it will breakdown as follows:
  • 45 minutes total in the area near the following two valves:

3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)

  • 15 minutes total in the area near the following one valve:

3-1201-128A A RWCU Pump Suction (at A RWCU Pump)

INITIATING CUE

1. CALCULATE the expected dose for the work in RWCU Pump Room. DETERMINE which NLO(s) CAN and which NLO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.

A-N-4-S Page 4 of 10

Job Performance Measure (JPM)

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-4-S Page 5 of 10

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of the RWP and survey map of the RWCU pump room and the supplied copy of RP-AA-203.

The following steps may be performed in any order.

1. Reviews Survey Maps to Reviews the survey maps determine area dose rates. and determines area dose rates to be 50 mr/hr for the first group of 2 valves and _____ _____ _____

160 mr/hr for the remaining valve.

NOTE:

The following calculations should be made:

2 valve clearance projected dose = 0.75 hr x 40 mr/hr = 30 mrem 1 valve clearance projected dose = 0.25 hr x 140 mr/hr = 35 mrem Total projected dose for the job = 40 mrem + 30 mrem = 65 mrem

  • 2. Calculates that the projected Determines the NLOs will dose that will be received for receive 30 mrem on the the task is 65 mrem. first 2 valves and 35 on the next valve. _____ _____ _____

CUE:

IF the candidate inquires whether or not any of the NLOs has received permission to exceed any dose limits, respond: None of the Non Licensed Operators have received permission to exceed any limits.

NOTE:

The following steps may be performed in any order.

  • 3. Determines that ALEX Alexs total daily dose on CAN NOT perform the job RWP 10004555 would be because he would exceed the 105 mrem.

80 mrem dose alarm on RWP _____ _____ _____

10004555.

A-N-4-S Page 6 of 10

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 4. Determines that Dan Dans total Annual dose CAN NOT perform the job would be 2015 mrem.

because he would exceed the 2000 mrem Exelon Annual _____ _____ _____

limit.

  • 5. Determines that Mike CAN Mikes total RWP daily perform the job because no dose and Annual dose will limits will be exceeded. remain below the limits.
  • 6. Determines that Sue Sues total daily dose on CAN NOT perform the job RWP 10004555 would be because she would exceed 110 mrem.

the 80 mrem dose alarm on RWP 10004555.

  • 7. Determines that Tom CAN Toms total RWP daily perform the job because no dose and Annual dose will limits will be exceeded. remain below the limits.

END JPM Stop Time:_________

A-N-4-S Page 7 of 10

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

SELECT PERSONEL FOR RADIATION WORK Revision Number: 01 JPM Number: A-N-4-S Task Number and

Title:

29900LK119, Discuss the items to be considered prior to work authorization K/A Number and Importance: Generic.2.3.13 3.4 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

RP-AA-203, rev 03 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-4-S Page 8 of 10

Job Performance Measure (JPM)

KEY EVALUATOR: The candidate must determine that dose for the task will be 65 mrem and determine that only two NLOs can receive the dose, necessary to complete the task. They are Mike and Tom. See the table below for projected job dose, 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> total dose on RWP 10004555, and total Annual TEDE dose for each Operator.

Calculation:

2 valves clearance (at RWCU Aux Pump) projected dose = 0.75 hr x 40 mr/hr =

30mrem 1 valve clearance (at A RWCU Pump) projected dose = 0.25hr x 140 mr/hr =

35mrem 30mrem + 35 mrem = 65 mrem projected job dose for clearance order hanging DDE dose Annual TEDE Projected dose on Projected Annual TEDE Name received on RWP dose as of RWP 10004555 (including all dose from 10004555 today Midnight To Date for the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)

(40 + 65 =) (1550 + 65 =)

Alex 40 mrem 1550 mrem 105 mrem 1615 mrem (5 + 65 =) (1950 + 65 =)

Dan 5 mrem 1950 mrem 70 mrem 2015 mrem (0 + 65 =) (1920 + 65 =)

Mike 0 mrem 1920 mrem 65 mrem 1985 mrem (45 + 65 =) (1850 + 65 =)

Sue 45 mrem 1850 mrem 110 mrem 1915 mrem (10 + 65 =) (1750 + 65 =)

Tom 10 mrem 1750 mrem 75 mrem 1815 mrem The bolded values in the table exceed the applicable Company, RWP, or 10CFR limit.

A-N-4-S Page 9 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are a Unit Supervisor and will be briefing NLOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555.
2. Five NLOs are available this shift.
  • None of the five have received dose at any location other than Dresden Station.
  • None of the five have received dose since midnight on any RWPs other than 10004555.
3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five NLOs to assist you in your planning:

DDE dose received on Annual TEDE dose Name RWP 10004555 Today To Date Alex 40 mrem 1550 mrem Dan 5 mrem 1950 mrem Mike 0 mrem 1920 mrem Sue 45 mrem 1850 mrem Tom 10 mrem 1750 mrem

4. The total expected stay time for each NLO will be 60 minutes. Based on past job history, it will breakdown as follows:
  • 45 minutes total in the area near the following two valves:

3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)

  • 15 minutes total in the area near the following one valve:

3-1201-128A A RWCU Pump Suction (at A RWCU Pump)

INITIATING CUE

1. CALCULATE the expected dose for the work in RWCU Pump Room.

DETERMINE which NLO(s) CAN and which NLO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.

A-N-4-S Page 10 of 10

Exelon Nuclear Job Performance Measure DETERMINE EMERGENCY CLASSIFICATION AND FILL OUT NARS FORM JPM Number: A-N-5-S Revision Number: 01 Date: 01/15 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM developed for. . . . . . . . .

Revision 01 Revised for ILT 14-1 NRC A-N-5-S Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Screenshot of meteorological data.

A-N-5-S Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. This is a time critical JPM.
2. You are the Shift Emergency Director.
3. Unit 2 was operating at near rated conditions when a transient occurred causing ALL high pressure feed to be lost and RPV water level dropped to -20 inches.
4. An automatic scram did NOT occur.
5. The Unit 2 NSO initiated a manual scram and initiated ARI.
6. One (1) minute after the manual scram was initiated, the following conditions exist:
  • SBLC is injecting with one pump.
  • Drywell pressure is 2.5 psig and steady.
  • Drywell temperature is 138oF and steady.
  • Torus temperature is 117oF and rising slowly.
  • RPV Pressure is 920 psig and dropping slowly.
  • Reactor power is 10% and steady on the APRMs.
  • RPV water level is -170 inches and dropping rapidly.

INITIATING CUES

1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.

A-N-5-S Page 4 of 8

Job Performance Measure (JPM)

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-5-S Page 5 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Examinee locates a copy of Radiological Emergency Plan Annex for Dresden EP-AA-1004 charts.

Provide the supplied NARS Form.

Provide the supplied screen shot of the meteorological data.

  • 1. Determines a classification of Determines highest GENERAL EMERGENCY, classification is a SITE due to a the failure of an EMERGENCY per EAL _____ _____ _____

automatic AND manual scram MS2 (15 minute AND there is an indication of requirement).

an extreme challenge to the ability to cool the core.

NOTE:

Determines classification start time _______ and stop time _______ .

(15 minute limit)

NOTE:

Automatic scram, manual scram, and ARI were not successful from Reactor Console

  • Reactor power is 17% on the APRMs AND
  • RPV water level is -182 inches and dropping rapidly with NO high pressure feed available
  • 2. Properly fills out NARS form. See attached key for the areas that must be filled out correctly (13 minute requirement): _____ _____ _____

NOTE:

Fill out NARS form start time (when declaration completed) _______ and stop time _______ .

(13 minute limit)

END JPM Stop Time:_________

A-N-5-S Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

DETERMINE EMERGENCY CLASSIFICATION and fill out nars form Revision Number: 01 JPM Number: A-N-5-S Task Number and

Title:

295L160, Given a plant in an off normal condition, determine the EP classification K/A Number and Importance: Generic.2.4.44 2.4 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 (declare) 13 (fill out) minutes Actual Time Used: minutes

References:

EP-AA-1004, Addendum 3, Rev 00 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-5-S Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. This is a time critical JPM.
2. You are the Shift Emergency Director.
3. Unit 2 was operating at near rated conditions when a transient occurred causing ALL high pressure feed to be lost and RPV water level dropped to -

20 inches.

4. An automatic scram did NOT occur.
5. The Unit 2 NSO initiated a manual scram and initiated ARI.
6. One (1) minute after the manual scram was initiated, the following conditions exist:
  • SBLC is injecting with one pump.
  • Drywell pressure is 2.5 psig and steady.
  • Drywell temperature is 138oF and steady.
  • Torus temperature is 117oF and rising slowly.
  • RPV Pressure is 920 psig and dropping slowly.
  • Reactor power is 10% and steady on the APRMs.
  • RPV water level is -170 inches and dropping rapidly.

INITIATING CUES

1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form.

Give the NARS form to the WEC Supervisor, who will make the state notification.

A-N-5-S Page 8 of 8