ML15287A343

From kanterella
Jump to navigation Jump to search
2015 Dresden Station Initial License Examination Forms D-1
ML15287A343
Person / Time
Site: Dresden  
Issue date: 04/30/2015
From: Randy Baker
Operations Branch III
To:
Exelon Generation Co
Shared Package
ML14337A718 List:
References
Download: ML15287A343 (3)


Text

Scenario Outline TQ-AA-151-F10 Revision 1 Page 1of1 Station: Dresden Generating Station Scenario No.: IL T-N-1 Class ID: 14-1 (2015-301}

Evaluators Operators

/crew position I ATC

/BOP

/CRS Initial Conditions: 70% Power1 steady state 1 and eguilibrium xenon U2 SBO Diesel Generator running for surveillance Turnover:

Shutdown the U2 SBO Diesel Generator.

Then 1 raise 12ower using control rods.

Event Malf.

Event Event No.

No.

Type*

Description 1

NONE N

AUX POWER - SBO Diesel, Secure from Surveillance Run (BOP) 2 NONE R

Raise Power Using Control Rods (ATC) 3 RODF08DI CIT CRD FCV Fails High Causing Rods to Drift IN (TS) (ATC) 4 ADS3EBN/

CIT ERV - Spurious Opening (T/S) (BOP)

ADS3ESD 5

N33 c

INSTRUMENT AIR-Compressor, Trip Due to Overcurrent (BOP) 6 ASDMRHGH I

RECIRC - Master Recirculation Flow Controller Fails Upscale (ATC) 7 CSBRKSEV M

Manual Scram - Earthquake Causes Plant Damage/Torus Leak 8

F41 M

Small Steam Leak/Emergency Depressurize Due Low Torus Level

  • (N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor, (T)ech Spec Initial to indicate form complete:

ILT Lead Date SRRS: 30.105 May be retained in department for 2 years, then forwarded to Records Management.

Scenario Outline TQ-AA-151-F10 Revision 1 Page 1 of 1

  • _n: Dresden Generating Station Scenario No.: IL T-N-2 Class ID: 14-1 (2015-301}

Evaluators Operators

/crew position

/ATC

/BOP

/CRS Initial Conditions: 70% gower Turnover:

After shift turnover, raise gower using Recirc flow.

Event Malf.

Event Event No.

No.

Type*

Description 1

NONE c

FW - RFP, Swap Due to Oil Leak (ATC) 2 NONE R

RECIRC-Reactivity, Raise Power Using Recirculation Flow {ATC) 3 WTNP c

TBCCW - Pump, Swap Due To Degrading Pump (BOP) 4 RDFCFHI CIT CRD - Controller, Indication Fails Upscale {ATC}

5 I CS PD FT I IT ISO COND - System, Spurious Initiation (BOP) 6 121 M

MANUAL SCRAM - Steam Leak in the Drywell 7

812 SER1026 M

A TWS - Electrical, ARI Unsuccessful SER1060 AW4 8

121 EMERGENCY DEPRESSURIZE - On Exceeding Pressure K23 M

Suppression Pressure Due To Steam Leak inside the Drywell And K40 Partial Loss of Ability to Spray the Drywell

  • (N)ormal, (R)eact1v1ty, (l)nstrument, (C)omponent, (M)ajor, (T)ech Spec Initial to indicate form complete:

ILT Lead Date SRRS: 30.105 May be retained in department for 2 years, then forwarded to Records Management.

Scenario Outline TQ-AA-151-F10 Revision 1 Page 1 of 1 Station: Dresden Generating Station Scenario No.: IL T-N-3 Class ID: 14-1 (2015-301}

Evaluators Operators

/crew position

/ATC

/BOP

/CRS Initial Conditions: StartuQ; Stead~ at - 5% Power Turnover:

Plant lnsQections in Qrogress. Resume QUlling control rods next shift.

After shift turnover1 swaQ RFP vent fans Event Malf.

Event Event No.

No.

Type*

Description 1

NONE N

HVAC-RFP Vent Fan, Swap For Maintenance (ATC) 2 RDFAILF5 I IT CRD - RPIS, Loss of Control Rod Position Indication {ATC) 3 RADRBVAH C/T CONTAINMENT-Monitor, Failure For Rx Bldg Vent Rad With Failure of SBGT To Auto Start (BOP) 4 Nll12POT I IT NI - IRM, Fails Upscale Causing Half Scram (ATC}

5 HP6 c

CIRC WATER-Pump, Trip Due To Overcurrent (BOP)

HP?

6 HP3 M

MANUAL SCRAM - Flooding in Condensate Pump Room EMERGENCY DEPRESSURIZE - On 2 Areas Above Max Safe 7

HPRMBRKP M

Radiation Levels Due To HPCI Steam Line Leak into the HPCI Room

  • (N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor, (T}ech Spec Initial to indicate form complete:

ILT Lead Date SRRS: 30.105 May be retained in department for 2 years, then forwarded to Records Management.