2015 FERMI POWER PLANT INITIAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 August 20, 2015 Mr. Paul Fessler Chief Nuclear Officer DTE Energy Company Fermi 2-210 NOC 6400 North Dixie Highway Newport, Ml 48166

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Fessler:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Fermi 2 Power Plant. '

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. James W. Davis, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and you may administer the written examinations in accordance with Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," one day during the week of August 24, 2015.

The NRC staff will administer the operating tests during the week of August 24, 2015. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021, for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9707.

Please contact your Chief Examiner, Mr. Michael E. Bielby, at 630-829-9762, if you have any questions or identify any errors or changes in the license level reactor operator (RO), senior reactor operator (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document

P. Fessler Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc w/encl: Distribution via LISTSERV J. W. Davis, Training Manager

P. Fessler Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc w/encl: Distribution via LISTSERV J. W. Davis, Training Manager DISTRIBUTION:

Kimyata MorganButler RidsNrrDorllpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRS III Jim Clay Carmen Olteanu Scott Sloan DOCUMENT NAME: Ltr 08xx15 Fermi OL exam approval (MEB).docx

[g] Publicly Available D Non-Publicly Available D Sensitive [g] Non-Sensitive To receive a co of this document, indicate in the concurrence box "C" =Co without attach/encl "E" =Co OFFICE RIII:DRS N RIII:DRS NAME DATE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 June 24, 2015 Mr. Paul Fessler Chief Nuclear Officer DTE Energy Company Fermi 2-210 NOC 6400 North Dixie Highway Newport, Ml 48166

SUBJECT:

FERMI POWER PLANT, UNIT 2 CONFIRMATION OF INITIAL LICENSE EXAMINATION

Dear Mr. Fessler:

In a telephone conversation on June 24, 2015, between Mr. M. Bielby, Chief Examiner, and Mr. M. Donigian, Fermi Training Instructor, arrangements were made for the administration of licensing examinations, at the Fermi Power Plant, Unit 2, during the week of August 24. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of August 3, 2015.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 10 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

Your staff previously submitted the examination outline on May 22, 2015, which met our requested date. The written examination, operating test, and supporting reference material identified in Attachment 3 to ES-201, will be due by June 25, 2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the Commission for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.

Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels), generated during the dynamic operating tests until the examination results are final.

Appendix E to NUREG-1021, contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

P. Fessler To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests, (if any), (OMB approval number 3150-0090), at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S. C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1 @nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Donigian has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. M. Bielby at 630-829-9762, or me at 630-829-9711.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via LISTSERy

P. Fessler To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests, (if any),

(OMB approval number 3150-0090), at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S. C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1 @nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with Title 10 of the Code of Federal Regulations (1 0 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Donigian has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. M. Bielby at 630-829-9762, or me at 630-829-9711.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via LISTSER\f' DISTRIBUTION:

See next page DOCUMENT NAME: Ltr 06xx15 Fermi Confirmation of Initial License Examination (MEB).docx 1:8] Publicly Available D Non-Publicly Available D Sensitive 1:8] Non-Sensitive To receive a copy of this document, Indicate in the concurrence box "C" =Copy without attach/encl "E" =Copy with attach/encl "N" =No copy OFFICE Rill I Rill I Rill I Rill l NAME MBielby:jw 'I'AAb HPeterson d14--

DATE 06/J_,\'/15 OFFICIAL RE~ORD COPY

Letter Mr. Paul Fessler from Mr. Hironori Peterson dated June 24, 2015

SUBJECT:

FERMI POWER PLANT, UNIT 2 CONFIRMATION OF INITIAL LICENSE EXAMINATION DISTRIBUTION:

Kimyata MorganButler RidsNrrDoriLpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRS III Jim Clay Carmen Olteanu Scott Sloan

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 August 22, 2014 Mr. Joseph Plena Senior Vice President and CNO DTE Energy Company Fermi 2-210 NOC 6400 North Dixie Highway Newport, Ml 48166

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATION:

FERMI POWER PLANT, UNIT 2

Dear Mr. Plena:

We have received a letter from DTE Energy NRC-14-0040, dated May 20, 2014. In this letter, DTE Energy requested an initial operator licensing examination scheduled at the Fermi Power Plant, Unit 2, for the weeks of September 14 and 21, 2015, be rescheduled to the week of August 24, 2015.

In response, we have rescheduled the Fermi initial license exam date from September 2015 to August 24, 2015.

In the unlikely event that we are unable to support the examination during the scheduled week, we will inform you immediately, upon discovery, of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examination for the initial operator licensing exam scheduled in 2015 unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need.

Because your letter did not indicate the number of applicants being considered for this examination, the examination was each scheduled for one week based on a phone conversation with Tim Barrett on April 8, 2014. Please inform us if the number of applicants changes as this may impact the examination schedule. Also, please inform us at your earliest opportunity if you discover the need to change the scheduled dates for any examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.

J. Plena In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via LISTSER\J

J. Plena In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via LISTSER\J DISTRIBUTION:

Anthony Bowers RidsNrrDorllpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Carmen Olteanu John McHale DOCUMENT NAME: Ltr 082214 Fermi Confirmation of OL Exam (RKW).docx

[8J Publicly Available D Non-Publicly Available D Sensitive [8J Non-Sensitive

=

To receive a copy of this document, indicate in the concurrence box "C" Copy without attach/encl "E" =

Copy with attach/encl "N" = No copy OFFICE Rill I Rill I Rill I Rill I NAME RKWalton:bl HPeterson DATE 08/22/14 08/22/14 OFFICIAL RECORD COPY

Fermi 2 6400 :'\orth Dixie Hw)

Newport, Ml 48166 May 20,2014 NRC-14-0040 Regional Administrator Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352

References:

1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
2) DTE Electric Company letter, NRC-13-0062, "Rescheduling Fermi 2 Operator Licensing Examinations for 2015-2018"

Subject:

Rescheduling of Fermi 2 Operator Licensing Examinations for 2015 In Reference 2, DTE Electric Company provided scheduling dates for the Fermi 2 Operator Licensing Examinations in the upcoming years. This letter provides a revised schedule date to align with the upcoming refueling outage.

This date has already been discussed with the NRC, Operator License Branch, Operating License Exam Scheduler.

Current Scheduled Exam Dates Revised Exam Date September 14, 2015 August 24, 2015 September 21, 2015 August 24,2015 There are no new commitments included in this letter.

USNRC NRC-14-0040 Page2 Should you have any questions, please contact Mr. Bryan Crone, General Supervisor, Operations Training at (734) 586-4173.

Zackary W. Rad Manager, Nuclear Licensing cc: NRC Project Manager NRC Resident Office Keith A. Walton Janet R. Kweiser, DRS, Operations Branch, Region III Document Control Desk Washington, DC

J. Plona A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via ListServ'

J. Plona A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via ListServ' DISTRIBUTION:

Ernesto Quinones RidsNrrDorllpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: Ltr 012714 Fermi Confirmation of Initial OL Exam.docx 0 Publicly Available D Non-Publicly Available D Sensitive 0 Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" =Copy without attach/encl "E" =

Copy with attach/encl "N" = No copy OFFICE Rill I Rill I Rill I Rill I NAME RKWalton:bl HPeterson DATE 01/22/14 01/27/14 OFFICIAL RECORD COPY

US NRC NRC-13-0029 Page2 cc: NRC Project Manager NRC Resident Office Keith A. Walton Janet R. !}.weiser, DRS, Operations Branch, Region III Document Control Desk Washington, DC

Fem:i2 MOO !'*lorth Dixie Hwy NP.WjHlrt, Ml 48166 December 20, 2013 NRC-13-0062 Regional Administrator Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352

References:

1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
2) DTE Electric Company letter, NRC-10-0018, "Scheduling of Initial Operator Licensing Examinations"
3) DTE Electric Company letter, NRC-13-0029, "Scheduling of Initial Operator Licensing Examinations"

Subject:

Rescheduling of Fermi 2 Operator Licensing Examinations for 2015-2018 In References 2 and 3, DTE Electric Company (DTE) provided scheduling dates for the Fermi 2 Operator Licensing Examinations in the upcoming years. This letter provides revised schedule dates that align with the current plans for the next three refuel outages, RF -16, RF -1 7 and RF-18.

These dates have already been discussed with the NRC, Operating License Branch, Operating License Exam Scheduler.

Current Scheduled Exam Dates New Exam Dates April27, 2015 September 14, 2015 May4, 2015 September 21, 2015 September 5, 2016 March 6, 2017 September 12, 2016 March 13,2017 February 27, 2018 September 10,2018 March 5, 2018 September 17, 2018 There are no new commitments included in this letter.

USNRC NRC-13-0062 Page2 Should you have any questions, please contact Mr. Bryan Crone, General Supervisor, Operations Training at (734) 586-4173.

cc: NRC Project Manager NRC Resident Office Keith A. Walton Janet R. K weiser, DRS, Operations Branch, Region III Document Control Desk Washington, DC

J. Davis Access and Management System (ADAMS}, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA by D. McNeil for/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-341 License Nos. NPF-43 cc: Distribution via ListServ

J. Davis Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/readinq-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA by D. McNeil for/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-341 License Nos. NPF-43 cc: Distribution via ListServ DISTRIBUTION:

Daniel Merzke RidsNrrDoriLpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirslrib Resource Steven West Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DR Pill DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\OL Exam Confirmation Letters\FER 060111 DRS OL Exam Confirmation.docx D Publicly Available D Non-Publicly AvailableD Sensitive D Non-Sensitive To receive a copy of this document Indicate In the concurrence box "C"

  • Copy without attach/encl "E"
  • Copy with attach/encl "N"
  • No copy OFFICE Rill I Rill I I I NAME RKWalton:co HPeterson OM for DATE 05/13/2011 06/01/2011 OFFICIAL RECORD COPY

Fermi 2 .

6400 North Dixie Hwy:, Ne,.,ipo~t, MI 48166

  • Detroit Edison March. 10, 2010 NRC-I 0-0018

. Regional Administrator Region III u.s. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352

Reference:

.Fermi 2 NRC Docket No. 50-341 NRC License No. *NPF-43 *

Subject:

Scheduling of Initial Operator Licensing Examinations

. In a telephone conversation* on January 21, 2o 10; Mr. Dell McNeil requested that Fermi 2 transmit the preliminary dates for the Feimi 2 initial. operator licensing exammations in 2015and 2016; For the year 2015 the proposed primary dates are the weeks of February 23 and March 2. For the year 2016 the proposed primary dates

'are the weeks. of September 5 and September 12. No alternate dates are proposed at this time. *

  • No new commitments are made in this letter.

Should you have any questions in this matter, please contact Mr. David Coseo, Ge~eral Supervisor, Operations Training at (734) 586-4055.

  • Sincerely, *
    • ~~*

Manager, NuClear Licensing cc: . NRC Project Manager .

Document Control Desk, Washington D C Reactor Projects Chief, Branch 4, Region III*

NRC Resident Office

  • JanefR. Kweiser, DRS, Operations Branch, Region ni

. AIYI'E Energy Company. '

J. Davis In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS}, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-341 License Nos. NPF-43 cc: Distribution via ListServ

J. Davis In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-341 License Nos. NPF-43 cc: Distribution via ListServ DISTRIBUTION:

Susan Bagley RidsNrrDorllpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirslrib Resource Steven Reynold Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DR Pill DRS III Patricia Buckley Tammy Tomczak Document Name: G:\DRS\Work in Progress\FER 073010 DRS OL Re Confirmation of License Exam.docx o Publicly Available o Non-Publicly Available o Sensitive o Non-Sensitive To receive a copy of this document, indicate in the box: "C" = Copy without attachmenVenclosure "E" = Copy with attachmenVenclosure "N" =No copy OFFICE Rill I Rill IN I I NAME RKWalton:co HPeterson DATE 07/20/10 07/30/10 OFFICIAL RECORD COPY

Fermi 2 . . .. . . .

6400 North Dixie Hwy., Newport, MI 48166

  • Detroit Edison

~.*

March. 10,2010 NRC-10-0018

. Regional Administrator Region III

u. s. Nuclear Regulatory Commissio,n 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352

Reference:

.Fermi 2 NRC Docket No. 50-341 NRC License No. *NPF-43 *

Subject:

Scheduling of Initial Operator Licensing Examinations In a telephone conversation* on January 21, 20 10; Mr. Dell McNeil requested that Fermi 2 transmit the preliminary dates for the Feimi 2 initiafoperator licensing.*

exammations in 2015.and 2016, For the year 2015 the proposed primary dates are the weeks of February 23 and March 2. For the year 2016 the proposed primary dates

'are the weeks. of September 5 and September 12. No alternate dates are proposed at this time. *.

  • No new commitments are made in this letter.

Should you ~ave any questi.ons in this matter,.please ~ontact Mr. David Cosec, General

. Supervisor,

. Operations Training at (734) 586-4055. .

  • Sincerely, *

~**~*

.Rodn~~kn .* *.**

Manager, NuClear Licensing cc: . NRC Project Manager .

Document Control Desk, Washington D C Reactor Projects Chief, Branch 4, Region III*

NRC Resident Office * . .

  • JanefR.Kwe~ser,DRS, Operations Branch, Region III

. A DTE Energy Corripany

  • 2015 FERMI POWER PLANT INITIAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 August 20, 2015 Mr. Paul Fessler Chief Nuclear Officer DTE Energy Company Fermi 2-210 NOC 6400 North Dixie Highway Newport, Ml 48166

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Fessler:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Fermi 2 Power Plant. '

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. James W. Davis, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and you may administer the written examinations in accordance with Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," one day during the week of August 24, 2015.

The NRC staff will administer the operating tests during the week of August 24, 2015. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021, for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9707.

Please contact your Chief Examiner, Mr. Michael E. Bielby, at 630-829-9762, if you have any questions or identify any errors or changes in the license level reactor operator (RO), senior reactor operator (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document

P. Fessler Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc w/encl: Distribution via LISTSERV J. W. Davis, Training Manager

P. Fessler Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc w/encl: Distribution via LISTSERV J. W. Davis, Training Manager DISTRIBUTION:

Kimyata MorganButler RidsNrrDorllpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRS III Jim Clay Carmen Olteanu Scott Sloan DOCUMENT NAME: Ltr 08xx15 Fermi OL exam approval (MEB).docx

[g] Publicly Available D Non-Publicly Available D Sensitive [g] Non-Sensitive To receive a co of this document, indicate in the concurrence box "C" =Co without attach/encl "E" =Co OFFICE RIII:DRS N RIII:DRS NAME DATE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 June 24, 2015 Mr. Paul Fessler Chief Nuclear Officer DTE Energy Company Fermi 2-210 NOC 6400 North Dixie Highway Newport, Ml 48166

SUBJECT:

FERMI POWER PLANT, UNIT 2 CONFIRMATION OF INITIAL LICENSE EXAMINATION

Dear Mr. Fessler:

In a telephone conversation on June 24, 2015, between Mr. M. Bielby, Chief Examiner, and Mr. M. Donigian, Fermi Training Instructor, arrangements were made for the administration of licensing examinations, at the Fermi Power Plant, Unit 2, during the week of August 24. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of August 3, 2015.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 10 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

Your staff previously submitted the examination outline on May 22, 2015, which met our requested date. The written examination, operating test, and supporting reference material identified in Attachment 3 to ES-201, will be due by June 25, 2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the Commission for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.

Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels), generated during the dynamic operating tests until the examination results are final.

Appendix E to NUREG-1021, contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

P. Fessler To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests, (if any), (OMB approval number 3150-0090), at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S. C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1 @nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Donigian has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. M. Bielby at 630-829-9762, or me at 630-829-9711.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via LISTSERy

P. Fessler To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests, (if any),

(OMB approval number 3150-0090), at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S. C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1 @nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with Title 10 of the Code of Federal Regulations (1 0 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Donigian has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. M. Bielby at 630-829-9762, or me at 630-829-9711.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via LISTSER\f' DISTRIBUTION:

See next page DOCUMENT NAME: Ltr 06xx15 Fermi Confirmation of Initial License Examination (MEB).docx 1:8] Publicly Available D Non-Publicly Available D Sensitive 1:8] Non-Sensitive To receive a copy of this document, Indicate in the concurrence box "C" =Copy without attach/encl "E" =Copy with attach/encl "N" =No copy OFFICE Rill I Rill I Rill I Rill l NAME MBielby:jw 'I'AAb HPeterson d14--

DATE 06/J_,\'/15 OFFICIAL RE~ORD COPY

Letter Mr. Paul Fessler from Mr. Hironori Peterson dated June 24, 2015

SUBJECT:

FERMI POWER PLANT, UNIT 2 CONFIRMATION OF INITIAL LICENSE EXAMINATION DISTRIBUTION:

Kimyata MorganButler RidsNrrDoriLpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRS III Jim Clay Carmen Olteanu Scott Sloan

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 August 22, 2014 Mr. Joseph Plena Senior Vice President and CNO DTE Energy Company Fermi 2-210 NOC 6400 North Dixie Highway Newport, Ml 48166

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATION:

FERMI POWER PLANT, UNIT 2

Dear Mr. Plena:

We have received a letter from DTE Energy NRC-14-0040, dated May 20, 2014. In this letter, DTE Energy requested an initial operator licensing examination scheduled at the Fermi Power Plant, Unit 2, for the weeks of September 14 and 21, 2015, be rescheduled to the week of August 24, 2015.

In response, we have rescheduled the Fermi initial license exam date from September 2015 to August 24, 2015.

In the unlikely event that we are unable to support the examination during the scheduled week, we will inform you immediately, upon discovery, of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examination for the initial operator licensing exam scheduled in 2015 unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need.

Because your letter did not indicate the number of applicants being considered for this examination, the examination was each scheduled for one week based on a phone conversation with Tim Barrett on April 8, 2014. Please inform us if the number of applicants changes as this may impact the examination schedule. Also, please inform us at your earliest opportunity if you discover the need to change the scheduled dates for any examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.

J. Plena In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via LISTSER\J

J. Plena In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via LISTSER\J DISTRIBUTION:

Anthony Bowers RidsNrrDorllpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Carmen Olteanu John McHale DOCUMENT NAME: Ltr 082214 Fermi Confirmation of OL Exam (RKW).docx

[8J Publicly Available D Non-Publicly Available D Sensitive [8J Non-Sensitive

=

To receive a copy of this document, indicate in the concurrence box "C" Copy without attach/encl "E" =

Copy with attach/encl "N" = No copy OFFICE Rill I Rill I Rill I Rill I NAME RKWalton:bl HPeterson DATE 08/22/14 08/22/14 OFFICIAL RECORD COPY

Fermi 2 6400 :'\orth Dixie Hw)

Newport, Ml 48166 May 20,2014 NRC-14-0040 Regional Administrator Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352

References:

1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
2) DTE Electric Company letter, NRC-13-0062, "Rescheduling Fermi 2 Operator Licensing Examinations for 2015-2018"

Subject:

Rescheduling of Fermi 2 Operator Licensing Examinations for 2015 In Reference 2, DTE Electric Company provided scheduling dates for the Fermi 2 Operator Licensing Examinations in the upcoming years. This letter provides a revised schedule date to align with the upcoming refueling outage.

This date has already been discussed with the NRC, Operator License Branch, Operating License Exam Scheduler.

Current Scheduled Exam Dates Revised Exam Date September 14, 2015 August 24, 2015 September 21, 2015 August 24,2015 There are no new commitments included in this letter.

USNRC NRC-14-0040 Page2 Should you have any questions, please contact Mr. Bryan Crone, General Supervisor, Operations Training at (734) 586-4173.

Zackary W. Rad Manager, Nuclear Licensing cc: NRC Project Manager NRC Resident Office Keith A. Walton Janet R. Kweiser, DRS, Operations Branch, Region III Document Control Desk Washington, DC

J. Plona A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via ListServ'

J. Plona A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via ListServ' DISTRIBUTION:

Ernesto Quinones RidsNrrDorllpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: Ltr 012714 Fermi Confirmation of Initial OL Exam.docx 0 Publicly Available D Non-Publicly Available D Sensitive 0 Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" =Copy without attach/encl "E" =

Copy with attach/encl "N" = No copy OFFICE Rill I Rill I Rill I Rill I NAME RKWalton:bl HPeterson DATE 01/22/14 01/27/14 OFFICIAL RECORD COPY

US NRC NRC-13-0029 Page2 cc: NRC Project Manager NRC Resident Office Keith A. Walton Janet R. !}.weiser, DRS, Operations Branch, Region III Document Control Desk Washington, DC

Fem:i2 MOO !'*lorth Dixie Hwy NP.WjHlrt, Ml 48166 December 20, 2013 NRC-13-0062 Regional Administrator Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352

References:

1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
2) DTE Electric Company letter, NRC-10-0018, "Scheduling of Initial Operator Licensing Examinations"
3) DTE Electric Company letter, NRC-13-0029, "Scheduling of Initial Operator Licensing Examinations"

Subject:

Rescheduling of Fermi 2 Operator Licensing Examinations for 2015-2018 In References 2 and 3, DTE Electric Company (DTE) provided scheduling dates for the Fermi 2 Operator Licensing Examinations in the upcoming years. This letter provides revised schedule dates that align with the current plans for the next three refuel outages, RF -16, RF -1 7 and RF-18.

These dates have already been discussed with the NRC, Operating License Branch, Operating License Exam Scheduler.

Current Scheduled Exam Dates New Exam Dates April27, 2015 September 14, 2015 May4, 2015 September 21, 2015 September 5, 2016 March 6, 2017 September 12, 2016 March 13,2017 February 27, 2018 September 10,2018 March 5, 2018 September 17, 2018 There are no new commitments included in this letter.

USNRC NRC-13-0062 Page2 Should you have any questions, please contact Mr. Bryan Crone, General Supervisor, Operations Training at (734) 586-4173.

cc: NRC Project Manager NRC Resident Office Keith A. Walton Janet R. K weiser, DRS, Operations Branch, Region III Document Control Desk Washington, DC

J. Davis Access and Management System (ADAMS}, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA by D. McNeil for/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-341 License Nos. NPF-43 cc: Distribution via ListServ

J. Davis Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/readinq-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA by D. McNeil for/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-341 License Nos. NPF-43 cc: Distribution via ListServ DISTRIBUTION:

Daniel Merzke RidsNrrDoriLpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirslrib Resource Steven West Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DR Pill DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\OL Exam Confirmation Letters\FER 060111 DRS OL Exam Confirmation.docx D Publicly Available D Non-Publicly AvailableD Sensitive D Non-Sensitive To receive a copy of this document Indicate In the concurrence box "C"

  • Copy without attach/encl "E"
  • Copy with attach/encl "N"
  • No copy OFFICE Rill I Rill I I I NAME RKWalton:co HPeterson OM for DATE 05/13/2011 06/01/2011 OFFICIAL RECORD COPY

Fermi 2 .

6400 North Dixie Hwy:, Ne,.,ipo~t, MI 48166

  • Detroit Edison March. 10, 2010 NRC-I 0-0018

. Regional Administrator Region III u.s. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352

Reference:

.Fermi 2 NRC Docket No. 50-341 NRC License No. *NPF-43 *

Subject:

Scheduling of Initial Operator Licensing Examinations

. In a telephone conversation* on January 21, 2o 10; Mr. Dell McNeil requested that Fermi 2 transmit the preliminary dates for the Feimi 2 initial. operator licensing exammations in 2015and 2016; For the year 2015 the proposed primary dates are the weeks of February 23 and March 2. For the year 2016 the proposed primary dates

'are the weeks. of September 5 and September 12. No alternate dates are proposed at this time. *

  • No new commitments are made in this letter.

Should you have any questions in this matter, please contact Mr. David Coseo, Ge~eral Supervisor, Operations Training at (734) 586-4055.

  • Sincerely, *
    • ~~*

Manager, NuClear Licensing cc: . NRC Project Manager .

Document Control Desk, Washington D C Reactor Projects Chief, Branch 4, Region III*

NRC Resident Office

  • JanefR. Kweiser, DRS, Operations Branch, Region ni

. AIYI'E Energy Company. '

J. Davis In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS}, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-341 License Nos. NPF-43 cc: Distribution via ListServ

J. Davis In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-341 License Nos. NPF-43 cc: Distribution via ListServ DISTRIBUTION:

Susan Bagley RidsNrrDorllpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirslrib Resource Steven Reynold Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DR Pill DRS III Patricia Buckley Tammy Tomczak Document Name: G:\DRS\Work in Progress\FER 073010 DRS OL Re Confirmation of License Exam.docx o Publicly Available o Non-Publicly Available o Sensitive o Non-Sensitive To receive a copy of this document, indicate in the box: "C" = Copy without attachmenVenclosure "E" = Copy with attachmenVenclosure "N" =No copy OFFICE Rill I Rill IN I I NAME RKWalton:co HPeterson DATE 07/20/10 07/30/10 OFFICIAL RECORD COPY

Fermi 2 . . .. . . .

6400 North Dixie Hwy., Newport, MI 48166

  • Detroit Edison

~.*

March. 10,2010 NRC-10-0018

. Regional Administrator Region III

u. s. Nuclear Regulatory Commissio,n 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352

Reference:

.Fermi 2 NRC Docket No. 50-341 NRC License No. *NPF-43 *

Subject:

Scheduling of Initial Operator Licensing Examinations In a telephone conversation* on January 21, 20 10; Mr. Dell McNeil requested that Fermi 2 transmit the preliminary dates for the Feimi 2 initiafoperator licensing.*

exammations in 2015.and 2016, For the year 2015 the proposed primary dates are the weeks of February 23 and March 2. For the year 2016 the proposed primary dates

'are the weeks. of September 5 and September 12. No alternate dates are proposed at this time. *.

  • No new commitments are made in this letter.

Should you ~ave any questi.ons in this matter,.please ~ontact Mr. David Cosec, General

. Supervisor,

. Operations Training at (734) 586-4055. .

  • Sincerely, *

~**~*

.Rodn~~kn .* *.**

Manager, NuClear Licensing cc: . NRC Project Manager .

Document Control Desk, Washington D C Reactor Projects Chief, Branch 4, Region III*

NRC Resident Office * . .

  • JanefR.Kwe~ser,DRS, Operations Branch, Region III

. A DTE Energy Corripany *