Scheduling of Initial Operator Licensing Examinations
ML13141A550
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/17/2013
From: Rad Z
DTE Energy
To:
NRC/RGN-III
References
NRC-13-0029
Download: ML13141A550 (2)


Text

May 17, 2013 NRC-13-0029 Regional Administrator Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352

Reference:

Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Scheduling of Initial Operator Licensing Examinations Mr. Keith A. Walton requested that Fermi 2 transmit the preliminary dates for the Fermi 2 initial operator licensing examinations in 2018. For the year 2018 the proposed primary dates are the weeks of February 27 and March 5. For the year, 2013 the proposed primary date is the week of September 9 (one week as number of candidates is less than 9).

Additionally, Fermi 2 Operations Training received a request to exchange 2015 exam dates with NextEra Energy Point Beach Station. Fermi 2 was scheduled for initial operator licensing examinations for the weeks of February 23, 2015 and March 2, 2015. We are proposing to release those dates to NextEra Energy Point Beach Station and reserve the dates that Point Beach Station had scheduled for the weeks of April 27, 2015 and May 4, 2015 for Fermi 2 initial examinations.

There are no new commitments included in this letter.

Should you have any questions, please contact Mr. David Coseo, General Supervisor, Operations Training at (734) 586-4055.

Sincerely, ackary W. Rad Manager, Nuclear Licensing

USNRC NRC-13-0029 Page 2 cc: NRC Project Manager NRC Resident Office Keith A. Walton Janet R. Kweiser, DRS, Operations Branch, Region III Document Control Desk Washington, DC