ML15282A064

From kanterella
Jump to navigation Jump to search

Acceptance Review
ML15282A064
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/02/2015
From: Shawn Williams
Plant Licensing Branch II
To: Gatlin T
South Carolina Electric & Gas Co
Williams S
References
CAC MF6769
Download: ML15282A064 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 2, 2015 Mr. Thomas D. Gatlin Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88, Mail Code 800 Jenkinsville, SC 29065

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 -ACCEPTANCE REVIEW (CAC NO. MF6769)

Dear Mr. Gatlin:

By letter dated September 29, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15275A089), the South Carolina Electric & Gas Company (SCE&G, the licensee) submitted a license amendment request to revise VirgilC. Summer Nuclear Station, Unit 1, Technical Specifications to adopt Technical Specifications Task Force (TSTF)-

523 "Generic Letter 2008-01, Managing Gas Accumulation."

The purpose of this letter.is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

. Consistent with.Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed fqr original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment.

Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate

acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.

If you have any questions, please contact me at (301) 415-1009.

Docket No. 50-395 cc: Distribution via Listserv Sincerely, Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

ML15282A064 OFFICE LPL2-1/PM LPL2-1/LA NAME SWilliams SFigueroa DATE 10/29/15 10/10/15 Sincerely,

/RA/

Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LPL2-1/BC LPL2-1/PM MMarkley SWilliams 11/02/15 11/02/15