LR-N15-0202, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 17

From kanterella
(Redirected from ML15273A366)
Jump to navigation Jump to search

Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 17
ML15273A366
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 09/21/2015
From: Gaerity A
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N15-0202
Download: ML15273A366 (3)


Text

  • SAFEGUARDS INFORMATION When separated from Safeguards Information in enclosures, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 PSEG Nuclear LLC LR-N15-0202 10 CFR 50.54(p)

SEP 21 2015 10 CFR 73.21 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Salem Nuclear Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRG Docket Nos. 50-272 and 50-311 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRG Docket No. 50-354

Subject:

Salem-Hope Creek Generating Stations s*ecurity Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 17 Pursuant to the requirements of 10 CFR 50.54(p)(2), PSEG Nuclear, LLC (PSEG), hereby submits Revision 17 to the Salem-Hope Creek Generating Stations Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program. Enclosure 1 contains Form 2 - 10 CFR 50.54(p) Evaluation Form for the Salem-Hope Creek Generating Stations Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 17, that will be implemented on September 22, 2015, and reflects the destaffing of two posts, one at Salem and one at Ho"pe Creek. Enclosure 1 also contains the NEI security plan change template from NEI 11-08, Guidance on Submitting Security Plan Changes.

A copy of the revised Salem-Hope Creek Generating Stations Security Plan, Training and

  • Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program document in its entirety is included in Enclosure 2. This revision contains the nomenclature from NEI 03-12 Revision 7, "Template for the Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program."

The documents included in Enclosures 1 and 2, have been determined to contain safeguards information. PSEG requests that this information be withheld from public disclosure in accordance with 10 CFR 73.21, "Protection of Safeguards Information: Performance Requirements," paragraph (a)(1 ). There are no regulatory commitments contained in this letter.

SAFEGUARDS INFORMATION When separated from Safeguards Information in enclosures, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure. SUU \

µ~

SAFEGUARDS INFORMATION When separated from Safeguards Information in enclosures, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

SEP 21 2015 Page 2 10 CFR 50.54(p)

LR-N15-0202 10 CFR 73.21 In accordance with the requirements of 10 CFR 50.54(p)(2), the signed original is being sent to the Document Control Desk and one copy is being sent to Region I.

If you have any questions or require additional information, please do not hesitate to contact me at (856) 339-2282. -

~\;......,_;;:-~

Anndria Gaerity Executive Director, Corporate Services Enclosures (1 _and 2) - contain Safeguards Information cc (with Enclosures)

_D. Dorman, Administrator - Region 1 NRC U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713 cc (all w/o Enclosure)

Thomas J. Wengert, Project Manager, US NRC NRC Senior Resident Inspector, Salem NRC Senior Resident Inspector, Hope Creek P. Mulligan, Chief, NJBNE T. Cachaza, Commitment Tracking Coordinator, Salem T. MacEwen, Commitment Tracking Coordinator, Hope Creek L. Marabella, Corporate Commitment Tracking Coordinator SAFEGUARDS INFORMATION When separated from Safeguards Information in enclosures, this document is decontrolled provided the transmittal document does not otherwise warrant protection _/

from unauthorized disclosure. -

SAFEGUARDS INFORMATION When separated from Safeguards Information in enclosure and attachment, this document is decontrolled provided the transmittal document does not otherwise warrant

  • protection from unauthorized disclosure.

SEP 21 2015 Page 3 10 CFR 50.54(p)

LR-N15-0202 10 CFR 73.21 bee: Executive Director, Corporate Services

  • Director, Regulatory Affairs Manager, Licensing Records Management SAFEGUARDS INFORMATION When separated from Safeguards Information in enclosures, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.