ML15244A708

From kanterella
Jump to navigation Jump to search
Notification of 920114 Meeting W/Util in Rockville,Md to Discuss Qualification of Util to Perform Safety Analyses for Plant as Described in Topical Rept DPC-NE-3000.Meeting Agenda Encl
ML15244A708
Person / Time
Site: Oconee  
Issue date: 12/19/1991
From: Wiens L
Office of Nuclear Reactor Regulation
To: Lang D
Office of Nuclear Reactor Regulation
References
NUDOCS 9201020091
Download: ML15244A708 (5)


Text

December 19, 1991 Docket Nos. 50-269, 50-270 and 50-287 MEMORANDUM FOR: David J. Lange, Acting Director Project Directorate 11-3 Division of Reactor Projects -

I/II FROM:

Leonard A. Wiens, Project Manager Project Directorate 11-3 Division of Reactor Projects -

I/II

SUBJECT:

FORTHCOMING MEETING WITH DUKE POWER COMPANY ON THERMAL HYDRAULIC TRANSIENT ANALYSIS METHODOLOGY - OCONEE NUCLEAR STATION, UNITS 1, 2 AND 3 DATE & TIME:

January 14, 1992 1:00 p.m. - 4:00 p.m.

LOCATION:

One White Flint North 11555 Rockville Pike Rockville, Maryland Room 1FS PURPOSE:

To discuss the qualification of Duke Power Company to perform safety analyses for the Oconee plants, as described in Topical Report DPC-NE-3000. A meeting agenda is enclosed.

PARTICIPANTS*:

NRC DUKE-POWER

.J ones K. Canady L. Wiens S. Gewehr M. Caruso G. Swindlehurst H. Scott J. Burchfield et. al.

et. al.

/s/

Leonard A. Wiens, Project Manager Project Directorate 11-3 Division of Reactor Projects - 1/11

Enclosure:

As stated cc w/enclosure:

9201020091 9i1219 See next page P

PDR

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy,"

43 Federal Register 28058, 6/28/78.

PDII-3:L PDI3:PM D(A):PDI 3 LBer y LWiens:cw DLangee

/CE NAE:1T

//91

/

/91 DOCUMENT NAME: MTG W/DPC 01/14

o0 UNITED STATES 0

0 NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 December 19, 1991 Docket Nos. 50-269, 50-270 and 50-287 MEMORANDUM FOR: David J. Lange, Acting Director Project Directorate 11-3

.Division of Reactor Projects -

I/II FROM:

Leonard A. Wiens, Project Manager Project Directorate 11-3 Division of Reactor Projects - I/IT

SUBJECT:

FORTHCOMING MEETING WITH DUKE POWER COMPANY ON THERMAL HYDRAULIC TRANSIENT ANALYSIS METHODOLOGY - OCONEE NUCLEAR STATION, UNITS 1, 2 AND 3 DATE & TIME:

January 14, 1992 1:00 p.m. - 4:00 p.m.

LOCATION:

One White Flint North 11555 Rockville Pike Rockville, Maryland Room 1F5 PURPOSE:

To discuss the qualification of Duke Power Company to perform safety analyses for the Oconee plants, as described in Topical Report DPC-NE-3000. A meeting agenda is enclosed.

PARTICIPANTS*:

NRC DUKE POWER Jones

k. Canady L. Wiens S. Gewehr M. Caruso G. Swindlehurst H. Scott J. Burchfield et. al.

et. al.

onardAWiens, roject Manager Project Directorate 11-3 Division of Reactor Projects - 1/11

Enclosure:

As stated cc w/enclosure:

See next page

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy,"

43 Federal Register 28058, 6/28/78.

Duke Power Company Oconee Nuclear Station cc:

Mr. A. V. Carr, Esq.

Mr. M. E. Patrick Duke Power Company Compiance 422 South Church Street Duke Power Company Charlotte, North Carolina 28242-0001 Oconee Nuclear Site P.O. Box 1439 Seneca, South Carolina 29679 J. Michael McGarry, III, Esq.

Winston and Strawn Mr. Alan R. Herdt, Chief 1400 L Street, NW.

Project Branch #3 Washington, DC 20005 U. S. Nuclear Regulatory Commission 101 Marietta Street, NW., Suite 2900 Mr. Robert B. Borsum Atlanta, Georgia 30323 Babcock & Wilcox Nuclear Power Division Ms. Karen E. Long Suite 525 Assistant Attorney General 1700 Rockville Pike N. C. Department of Justice Rockville, Maryland 20852 P.O. Box 629 Raleigh, North Carolina 27602 Manager, LIS NUS Corporation Mr. R. L. Gill, Jr.

2650 McCormick Drive, 3 Floor Licensing Clearwater, Florida 34619-1035 Duke Power Company P. 0. Box 1007 Senior Resident Inspector Charlotte, North Carolina 28201-1007 U. S. Nuclear Regulatory Commission Route 2, Box 610 Mr. J. W. Hampton Seneca, South Carolina 29678 Vice President, Oconee Site Duke Power Company Regional Administrator, Region II P. 0. Box 1439 U. S. Nuclear Regulatory Commission Seneca, South Carolina 29679 101 Marietta Street, NW., Suite 2900 Atlanta, Georgia 30323 Mr. Heyward G. Shealy, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201 Office of Intergovernmental Relations 116 West Jones Street Raleigh, North Carolina 27603 County Supervisor of Oconee County SWalhalla, South Carolina 29621

ENCLOSURE January 14, 1992 Duke/NRC Meeting on DPC-NE-3000 AGENDA I.

Introduction II. Model Development and Validation

- Overview of Oconee RETRAN Model

- Benchmarking Effort to Validate the Oconee RETRAN Model III.

Basis for Oconee RETRAN Model Nodalization

- Industry Perspective

- Development of Oconee OTSG Model

- Potential Changes for FSAR Analyses

- Steady-state Steam Generator Nodalization Study

- Transient Steam Generator Nodalization Study

- Transient Steam Line Nodalization Study IV.

Summary/Conclusions

December 19, 1991 DISTRIBUTION Docket File NRC & Local PDRs PD 11-3 R/F T. Murley/F. Miraglia, 12G18 J. Partlow, 12G18 S. Varga, 14E4 G. Lainas L. Wiens A. Chaffee, EAB 11A1 OGC, 15B18 E. Jordan, MNBB 3701 B. Grimes, 9A2 Receptionist (White Flint)

ACRS (10), P-315 GPA/PA, 17G21 E. Tana, PMAS, 12G18 P. O'Dell, PMAS, 12E4 L. Plisco, 12G18 J. Wechselberger, EDO, 17G21 K. Clark, RH L. Berry M. Caruso, 8E23 R. Jones, 8E23 H. Scott, 10H13