ML15244A705

From kanterella
Jump to navigation Jump to search
Corrected Copy of Memo Discussing Actions Taken,In Response to 911121 Memo from W Lyon Re Plant Operation,Particularly During Outage.Major Team Insp to Begin Wk of 911202,covering All Aspects of Outage Activities.Lists Addl Actions Taken
ML15244A705
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/12/1991
From: Varga S
Office of Nuclear Reactor Regulation
To: Thadani A
Office of Nuclear Reactor Regulation
References
NUDOCS 9112300167
Download: ML15244A705 (3)


Text

CORRECTED 7

101 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 December 12, 1991 MEMORANDUM FOR:

Ashok C. Thadani, Director Division of Systems Technology FROM:

Steven A. Varga, Director Division of Reactor Projects - I/Il

SUBJECT:

MEMORANDUM FROM WARREN LYON CONCERNING OCONEE SHUTDOWN OPERATIONS By memorandum dated November 21, 1991, Warren Lyon provided his observations and perspective on the operation of the Oconee Nuclear Station, particularly during outages. I feel that his input is particularly valuable at this time, as my staff and I share many of the concerns reflected in his memorandum.

As a result of our concerns, we have initiated a number of actions with the licensee. On September 25, 1991 a management meeting was held in Region II at which Duke Power Company (DPC) discussed the investigation and corrective actions implemented as a result of the September 1991 shutdown events. On October 9, 1991, a meeting was held at NRR to discuss deficiencies identified in the Oconee Technical Specifications in the area of shutdown requirements.

Corrective actions for these deficiencies were committed to by the licensee subsequent to this meeting. A meeting with senior licensee management was held on November 12, 1991, during which DPC organizational structure and operating performance were primary areas of discussion. An Enforcement Conference is scheduled for December 18, 1991, to discuss violations identified as a result of the shutdown events at Oconee Unit 1. Many of the issues raised by Mr. Lyon have been addressed by the licensee in these meetings.

In addition, as a result of the numerous concerns identified during the Augmented Inspection Team (AIT) review at Oconee, NRR has scheduled a pilot shutdown risk team inspection at Oconee. This will be a major team inspection, beginning the week of December 2, 1991, covering all aspects of outage activities.

To ensure that all of the concerns covered by Mr. Lyon are reviewed, we are taking the following additional actions:

1. Conduct a detailed comparison between the AIT report and the observations in Mr. Lyons memorandum to determine which areas have common findings.
2. Provide Mr. Lyon's observations, with the results of our comparison, to Region II for their evaluation and follow-up action as appropriate.

NRC F LME CENT3ER COPY 9112300167 911212 PDR ADOCK 05000269 PDR

Ashok December 12, 1991

3. Provide a copy of Mr. Lyon's memorandum to the shutdown risk inspection team as background material in preparation for the inspection.
4. Review additional actions as appropriate based on the results of the above initiatives.

The Oconee Project Manager, Len Wiens, is closely monitoring these activities and can be contacted for further information. His extensio is 2-1495.

eve A.

r a, Di ecto Division of Reactor Projec I/Il

Ashok December 12, 1991

3. Provide a copy of Mr. Lyon's memorandum to the shutdown risk inspection team as background material in preparation for the inspection.
4. Review additional actions as appropriate based on the results of the above initiatives.

The Oconee Project Manager, Len Wiens, is closely monitoring these activities and can be contacted for further information. His extension is 2-1495.

/s/

Steven A. Varga, Director Division of Reactor Projects -

I/II DISTRIBUTION:

Central File NRC PDR PDII-3 R/F Oconee R/F LWiens LBerry SVarga GLainas OFC

LA:PDII-3 PM:PDII-
D(A):PDII-3
ADR2
D* PE NAME
LBerry
LWiens:
DLange

.Lai na s DATE

',""91 l 0/91

1,/ 0/91
1./1t/ 91
91 OFFlelAL kECokb COPY Document Name
MEMO FOR ASHOK THADANI