Recommends Util Proceed W/Catawba Planning Re short- Duration mass-point Testing Criteria for Containment Integrated Leak Rate Testing on Basis of Existing Approved Methods & Criteria
ML15244A334
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire, 05000000
Issue date: 10/16/1987
From: Hood D
Office of Nuclear Reactor Regulation
To: Tucker H
DUKE POWER CO.
References
TAC-66329, NUDOCS 8710220224
Download: ML15244A334 (5)


Text

Docket Nos.:

50-269, 50-270, 50-289 and 50-413, 50-414, 50-369 50-370 OCT 16 1987 Mr. H. B. Tucker, Vice President Nuclear Production Department Duke Power Company 422 South Church Street Charlotte, North Carolina 28242

Dear Mr. Tucker:

Subject:

Containment Integrated Leak Rate Testing - Oconee, McGuire and Catawba Nuclear Stations (TACs 66329 through 66335)

By letter dated September 17, 1987 you submitted for NRC review and approval short-duration mass-point testing termination criteria for containment inte grated leak rate testing (CILRT) for Oconee, McGuire and Catawba Nuclear Stations. Subsequently, Mr. Scott Gewehr telephoned Mr. K. Jabbour, the NRC Project Manager for Catawba, to request completion of the staff's review prior to the scheduled CILRT on Catawba Unit 1 on November 13, 1987.

Although your submittal will receive appropriate priority, we find that the complexity and significance of the proposed criteria and its supporting basis does not provide for review completion consistent with November 13, 1987.

Accordingly, we recommend that you proceed with your Catawba planning on the basis of existing approved methods and criteria. Appendix J of 10 CFR 50, by its reference to ANSI-N45.4, requires that CILRTs be performed for a 24-hour period. Tests of less than 24-hours duration require prior NRC approval; we have not authorized a lesser duration for any Duke Station.

Sincerely, (871220248 71016 4D 00

'9 Darl S. Hood, Acting Director Project Directorate 11-3 Division of Reactor Projects-I/II cc: See next page DISTRIBUTION:

iDocKete-OGC-Bethesda NRC PDR ACRS (10)

Local PDR JPartlow PRC System EJordan PD#23 Reading SVarga MDuncan GLainas DHood KJabbour HPastis SEE PREVIOUS CONCURRENCES PD#IY-13/DRP-I/II PD#II-3/DRP-I/II PD#II-3/DRP-I/II PD#HI-3/DRP-I/II DHood/mac

  • KJabbour
  • HPastis
  • MDuncan 10/1,/87 10/16/87 10/16/87 10/16/87

-DSII NRR/SPLB PD#II-3/DRP-I/II

  • JCraig DHood, Acting PD 10/16/87 10/tr /87

UNITED STATES NUCLEAR REGULATORY COMMISSION o

WASHINGTON, D. C. 20555 OCT 1 6 1987 Docket Nos.:

50-269, 50-270, 50-289 and 50-413, 50-414, 50-369 50-370 Mr. H. B. Tucker, Vice President Nuclear Production Department Duke Power Company 422 South Church Street Charlotte, North Carolina 28242

Dear Mr. Tucker:

Subject:

Containment Integrated Leak Rate Testing -

Oconee, McGuire and Catawba Nuclear Stations (TACs 66329 through 66335)

By letter dated September 17, 1987 you submitted for NRC review and approval short-duration mass-point testing termination criteria for containment inte grated leak rate testing (CILRT) for Oconee, McGuire and Catawba Nuclear Stations. Subsequently, Mr. Scott Gewehr telephoned Mr. K. Jabbour, the NRC Project Manager for Catawba, to request completion of the staff's review prior to the scheduled CILRT on Catawba Unit 1 on November 13, 1987.

Although your submittal will receive appropriate priority, we find that the complexity and significance of the proposed criteria and its supporting basis does not provide for review completion consistent with November 13, 1987.

Accordingly, we recommend that you proceed with your Catawba planning on the basis of existing approved methods and criteria. Appendix J of 10 CFR 50, byk its reference to ANSI-N45.4, requires that CILRTs be performed for a 24-hour period. Tests of less than 24-hours duration require prior NRC approval; we have not authorized a lesser duration for any Duke Station.

Sincerely,

,r? L (bfe 0 (

Darl S. Hood, Acting Director Project Directorate 11-3 Division of Reactor Projects-I/Il cc: See next page

Mr. H. B. Tucker Oconee Nuclear Station Duke Power Company Units Nos. 1, 2 and 3 cc:

Mr. A. V. Carr, Esq.

Mr. Paul Guill Duke Power Company Duke Power Company P. 0. Box 33189 Post Office Box 33189 422 South Church Street 422 South Church Street Charlotte, North Carolina 28242 Charlotte, North Carolina 28242 J. Michael McGarry, III, Esq.

Bishop, Liberman, Cook, Purcell & Reynolds 1200 Seventeenth Street, N.W.

Washington, D.C. 20036 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 20814 Manager, LIS NUS Corporation 2536 Countryside Boulevard Clearwater, Florida 33515 Senior Resident Inspector U.S. Nuclear Regulatory Commission Route 2, Box 610 Seneca, South Carolina 29678 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. Heyward G. Shealy, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201 Office of Intergovernmental Relations 116 West Jones Street Raleigh, North Carolina 27603 Honorable James M. Phinney County Supervisor of Oconee County Walhalla, South Carolina 29621

Mr. H. B. Tucker Duke Power Company Catawba Nuclear Station CC:

A.V. Carr, Esq.

North Carolina Electric Membership Duke Power Company Corp.

422 South Church Street 3400 Sumner Boulevard Charlotte, North Carolina 28242 P.O. Box 27306 Raleigh, North Carolina 27611 J. Michael McGarry, III, Esq.

Bishop, Liberman, Cook, Purcell Saluda River Electric Cooperative, and Reynolds Inc.

1200 Seventeenth Street, N.W.

P.O. Box 929 Washington, D. C. 20036 Laurens, South Carolina 29360 North Carolina MPA-1 Senior Resident Inspector Suite 600 Route 2, Box 179N 3100 Smoketree Ct.

York, South Carolina 29745 P.O. Box 29513 Raleigh, North Carolina 27626-0513 Regional Administrator, Region II U.S. Nuclear Regulatory Commission, L.L. Williams 101 Marietta Street, NW, Suite 2900 Area Manager, Mid-South Area Atlanta, Georgia 30323 ESSD Projects Westinghouse Electric Corp.

MNC West Tower - Bay 239 P.O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. Heyward G. Shealy, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201 County Manager of York County York County Courthouse Karen E. Long York South Carolina 29745 Assistant Attorney General N.C. Department of Justice Richard P. Wilson, Esq.

P.O. Box 629 Assistant Attorney General Raleigh, North Carolina 27602 S.C. Attorney General's Office P.O. Box 11549 Spence Perry, Esquire Columbia, South Carolina 29211 General Counsel Federal Emergency Management Agency Piedmont Municipal Power Agency Room 840 100 Memorial Drive 500 C Street Greer, South Carolina 29651 Washington, D. C. 20472 Mr. Michael Hirsch Federal Emergency Management Agency Office of the General Counsel Room 840 500 C Street, S.W.

Washington, D. C. 20472 Brian P. Cassidy, Regional Counsel Federal Emergency Management Agency, Region I J. W. McCormach POCH Boston, Massachusetts 02109

Mr. H. B. Tucker Duke Power Company McGuire Nuclear Station cc:

Mr. A.V. Carr, Esq.

Dr. John M. Barry Duke Power Company Department of Environmental Health P. 0. Box 33189 Mecklenburg County 422 South Church Street 1200 Blythe Boulevard Charlotte, North Carolina 28242 Charlotte, North Carolina 28203 County Manager of Mecklenburg County Mr. Dayne H. Brown, Chief 720 East Fourth Street Radiation Protection Branch Charlotte, North Carolina 28202 Division of Facility Services Department of Human Resources 701 Barbour Drive Mr. Robert Gill Raleigh, North Carolina 27603-2008 Duke Power Company Nuclear Production Department P. 0. Box 33189 Charlotte, North Carolina 28242 J. Michael McGarry, III, Esq.

Bishop, Liberman, Cook, Purcell and Reynolds 1200 Seventeenth Street, N.W.

Washington, D. C. 20036 Senior Resident Inspector c/o U.S. Nuclear Regulatory Commission Route 4, Box 529 Hunterville, North Carolina 28078 Regional Administrator, Region II U.S. Nuclear Regulatory Commission, 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 L. L. Williams Area Manager, Mid-South Area ESSD Projects Westinghouse Electric Corporation MNC West Tower - Bay 239 P. 0. Box 355 Pittsburgh, Pennsylvania 15230