UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, IL 60532-4352
August 28, 2015
Mr. Anthony Vitale
Vice President, Operations
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant
27780 Blue Star Memorial Highway
Covert, MI 49043-9530
SUBJECT: PALISADES NUCLEAR PLANT - NOTIFICATION OF AN NRC TRIENNIAL
HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION
INSPECTION REPORT 05000255/2015004
Dear Mr. Vitale:
On November 16, 2015, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite
portion of the Triennial Heat Sink Performance Inspection at your Palisades Nuclear Plant. This
inspection will be performed in accordance with NRC baseline Inspection procedure 71111.07.
In order to minimize the impact that the inspection has on the site and to ensure a productive
inspection, we have enclosed a request for documents needed for the inspection. The
documents have been divided into three groups.
The first group lists information necessary for our initial inspection scoping activities. This
information should be available to the lead inspector no later than October 1, 2015. By
October 13, 2015, the inspector will communicate the initial selected set of approximately
2-3 risk-significant heat exchangers.
The second group is needed to support our in-office preparation activities. This set of
documents, including the calculations associated with the selected heat exchangers, should
be available at the Regional Office no later than November 5, 2015. This information should
be separated for each selected component, especially if provided electronically (e.g., folder
with component name that includes calculations, condition reports, maintenance history, etc.).
During the in-office preparation activities, the inspector may identify additional information
needed to support the inspection.
The last group includes the additional information above as well as plant specific reference
material. This information should be available onsite to the inspector on November 16, 2015.
It is also requested that corrective action documents and/or questions developed during the
inspection be provided to the inspector as the documents are generated.
All requested documents are to be for the time period from the onsite inspection period back
to the documents that were provided in response to the previous Heat Sink Performance
Inspection. If no activities were accomplished in that time period, then the request applies to
the last applicable document in the previous time period. It is important that these documents
be as complete as possible, in order to minimize the number of documents requested during
the preparation week or during the onsite inspection.
A. Vitale
-2-
The lead inspector for this inspection is Mr. Jorge Corujo-Sandin. We understand that
our regulatory contact for this inspection is Ms. Barbara Dotson of your organization. If
there are questions about the material requested, or the inspection, please call Mr. Jorge
Corujo-Sandin at (630) 829-9741. Please send the information to the following e-mail
address Jorge.Corujo-Sandin@nrc.gov. A hard-copy with the required information is also
an acceptable option.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/
Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-255
License No. DPR-20
Enclosure:
Triennial Heat Sink Performance Inspection Document Request
cc w/encl: Distribution via LISTSERV
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
Enclosure
Inspection Report: 05000255/2015004
Inspection Dates:
November 16 - 20, 2015
Inspection Procedure:
IP 71111.07, Heat Sink Performance
Lead Inspector:
(630) 829-9741
Jorge.Corujo-Sandin@nrc.gov
I.
Information Requested By October 1, 2015
1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
Safety-Related Equipment, heat exchangers in order of risk significance.
2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat
exchanger.
3. List of the Corrective Action Program documents (with a short description)
associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling,
or heat exchanger testing, for the previous 3 years, or since the last Corrective
Action Program document list was sent to the NRC for the previous Heat Sink
Performance Inspection. The list should include all the Corrective Action Program
documents not on the last Corrective Action Program document list.
4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.
5. Last two System Health Report(s) and maintenance rule system notebooks for all
the GL 89-13 heat exchangers.
6. List of engineering-related operator workarounds (with a short description)
associated with GL 89-13 heat exchangers. The requested documents are to be
for the time period from the onsite inspection period back to the documents that
were provided in response to the previous Heat Sink Performance Inspection.
7. List of permanent and temporary modifications (with a short description) associated
with GL 89-13 heat exchangers. The requested documents are to be for the time
period from the onsite inspection period back to the documents that were provided
in response to the previous Heat Sink Performance Inspection.
II.
Information Requested By November 5, 2015
1. Copies of the GL 89-13 responses.
2. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to the
GL 89-13 Heat Exchanger Program.
3. Copies of procedures developed to implement the recommendations of GL 89-13
(e.g., the GL 89-13 Heat Exchanger Program description).
4. Copies of the selected Corrective Action Program documents.
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
2
5. For the specific heat exchangers selected:
a. Copies of the UFSAR sections applicable for each heat exchanger.
b. Copy of system description and design basis document for the heat exchangers
(as applicable).
c. Provide a list of calculations (with a short description) which currently apply to
each heat exchanger.
i.
establish the limiting design basis heat load required to be removed by each
of these heat exchangers;
ii.
demonstrate the heat exchangers capacity to remove the limiting heat load;
iii.
correlate surveillance testing and/or inspection results from these heat
exchangers with design basis heat removal capability (e.g., basis for
surveillance test and/or inspection acceptance criteria);
iv.
evaluate the potential for water hammer in each heat exchanger or
associated piping; and
v.
evaluate excessive tube vibration in each heat exchanger.
d. Copy of any operability determinations or other documentation of degradation
associated with the heat exchangers or the systems that support the operation
for the selected heat exchangers.
e. Copy of the construction code, Design Specification, heat exchanger data
sheets, and vendor documents including component drawings applicable for the
heat exchangers.
f. Copies of normal, abnormal, and emergency operating procedures associated
with the selected heat exchangers.
6. For the ultimate heat sink (UHS) and the safety-related service water system (or
equivalent):
a. Copies of the applicable UFSAR sections.
b. Copy of system description and design basis document (as applicable).
c. Copy of any operability determinations or other documentation of degradation
associated with the UHS and the safety-related service water system.
d. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that
states the maximum cooling water system inlet temperature limit that still allows
full licensed power operation of the nuclear reactor.
e. Copy of system description and design basis document (as applicable).
f. Copy of the construction code and Design Specification.
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
3
g. Copies of normal, abnormal, and emergency operating procedures associated
with the UHS and safety-related service water systems including procedures for
loss of these systems.
h. Copy of any operability determinations or other documentation of degradation
associated with the UHS, and the safety-related service water system.
i.
Copies of corrective action documents associated with waterhammer or hydraulic
transients in the service water system since the last Heat Sink Inspection.
j.
If available, provide an electronic copy of piping and instrumentation diagrams for
the service water system, including the intake structure.
k. Provide a list of calculations (with a short description), which currently apply to
UHS and service water system.
l.
Provide a list of instruments (with a short description) associated with automatic
or alarm functions for the safety-related service water system and/or UHS.
m. Provide a list of any design change (with a short description) performed on the
UHS or safety-related service water system since the last Heat Sink Performance
Inspection.
7. A schedule of all inspections, cleanings, maintenance, or testing of any
safety-related plant heat exchanger to be performed during the on-site portion of the
inspection.
III.
Information Requested to be Available on First Day of Inspection,
November 16, 2015
1. For the specific heat exchangers selected. :
a. Copy of the calculation which correlates surveillance testing results from these
heat exchangers with design basis heat removal capability (e.g., basis for
surveillance test acceptance criteria).
b. Copies of the two most recent completed tests and evaluation data confirming
thermal performance for those heat exchangers which are performance tested.
c. Documentation and procedures that identify the types, accuracy, and location of
any special instrumentation used for the two most recently completed thermal
performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow
instruments or temperature instruments). Include calibration records for the
instruments used during these tests.
d. Information regarding any alarms which monitor on-line performance.
e. Copy of the document describing the inspection results of each heat exchanger.
The requested documents are to be for the time period from the onsite inspection
period back to the documents that were provided in response to the previous
Heat Sink Performance Inspection.
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
4
f.
The cleaning and inspection maintenance schedule for each heat exchanger for
the next 5 years.
g. Copy of the design specification and heat exchanger data sheets for each heat
exchanger.
h. Copy of the vendor manuals including component drawings for each heat
exchanger.
i.
Copy of the calculation which establishes the limiting (maximum) design basis
heat load which is required to be removed by each of these heat exchangers.
j.
Copy of the operating procedure that ensures that the maximum cooling water
system inlet temperature limit is not exceeded.
k.
Copy of the calculations or documents which evaluate the potential for water
hammer in each heat exchanger or associated piping.
l.
Copy of the calculations that evaluate excessive tube vibration in each heat
exchanger and the documents that describe the controls that prevent heat
exchanger degradation due to excessive flow induced vibration during operation.
m. Copy of the periodic flow testing at or near maximum design flow. The requested
documents are to be for the time period from the onsite inspection period back to
the documents that were provided in response to the previous Heat Sink
Performance Inspection.
n. Copy of the document which identifies the current number of tubes in service for
each heat exchanger and the supporting calculation which establishes the
maximum number of tubes which can be plugged in each heat exchanger.
o. Copy of the document establishing the repair criteria (plugging limit) for degraded
tubes which are identified in each heat exchanger.
p. Copies of the documents that verify the structural integrity of the heat exchanger
(e.g., eddy current summary sheets, ultrasonic testing results, and visual
inspection results).
q. Copies of those documents that describe the methods taken to control water
chemistry in the heat exchangers.
2. For the review of the operation of the safety-related service water system (or
equivalent) and the UHS :
a. Copies of any design change performed on the UHS. The requested
documents are to be for the time period from the onsite inspection period back
to the documents that were provided in response to the previous Heat Sink
Performance Inspection.
b. Copies of any design change performed on the safety-related service water
system. The requested documents are to be for the time period from the onsite
inspection period back to the documents that were provided in response to the
previous Heat Sink Performance Inspection.
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
5
c.
Copies of procedures for a loss of UHS.
d. Copies of procedures for a loss of service water system.
e. Inspections and/or maintenance related to preventing macrofouling (e.g., silt,
dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or kelp).
The requested documents are to be for the time period from the onsite inspection
period back to the documents that were provided in response to the previous
Heat Sink Performance Inspection.
f.
Copies of chemistry procedures that monitor for pH, calcium hardness, etc. Also,
provide copies of the associated results. The requested documents are to be for
the time period from the onsite inspection period back to the documents that
were provided in response to the previous Heat Sink Performance Inspection.
g. Copies of documents associated with the monitoring of pump performance for
potential strong-pump vs. weak-pump interaction.
3. For the review associated with the system walkdown of the service water intake
structure :
a. Copies of corrective maintenance for the last 6 years associated with
service water strainers, traveling screens and trash racks. Copies of the last
2 inspections and/or surveillances associated with service water strainers,
traveling screens and trash racks. List of preventive maintenance, including
frequency, associated with service water strainers, traveling screens and trash
racks.
b. Copies of abnormal procedures for the traveling screens and service water
strainers.
c.
Copies of the last two inspections and/or surveillances documenting that
component mounts have not excessively degraded (i.e., due to corrosion).
For example, inspections for the mounts for the service water pumps, service
water strainers, traveling screens and trash racks. Copies of the documents
associated with the monitoring, trending, and remediation of silt accumulation
at the service water pump bay.
d. Copies of surveillance procedures and testing results performed on the service
water pump bay water level instruments. The requested documents are to be for
the time period from the onsite inspection period back to the documents that
were provided in response to the previous Heat Sink Performance Inspection.
e. Copies of procedures associated with operating during adverse weather
conditions (e.g., icing, high temperatures, or low level).
f.
Copy of the evaluation for the potential effects of low flow/level on underwater
weir walls intended to limit silt or sand intake, if applicable.
If the information requested above will not be available, please contact Mr. Jorge Corujo-Sandin
as soon as possible at (630) 829-9741, or email Jorge.Corujo-Sandin@nrc.gov.
A. Vitale
-2-
The lead inspector for this inspection is Mr. Jorge Corujo-Sandin. We understand that our regulatory
contact for this inspection is Ms. Barbara Dotson of your organization. If there are questions about the
material requested, or the inspection, please call Mr. Jorge Corujo-Sandin at (630) 829-9741. Please
send the information to the following e-mail address Jorge.Corujo-Sandin@nrc.gov. A hard-copy with the
required information is also an acceptable option.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements
were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not
conduct or sponsor, and a person is not required to respond to, a request for information or an
information collection requirement unless the requesting document displays a currently valid Office of
Management and Budget Control Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections,
Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its
enclosure, and your response (if any) will be available electronically for public inspection in the NRCs
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the
NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-255
License No. DPR-20
Enclosure:
Triennial Heat Sink Performance Inspection Document Request
cc w/encl: Distribution via LISTSERV
DISTRIBUTION:
Kimyata MorganButler
RidsNrrPMPalisades Resource
RidsNrrDorlLpl3-1 Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
ADAMS Accession Number ML15240A344
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE
RIII
RIII
RIII
RIII
NAME
GODwyer for JCorujo-Sandin:cl
CLipa
DATE
08/28/15
08/28/15
OFFICIAL RECORD COPY