ML15239A637

From kanterella
Jump to navigation Jump to search
Forwards Proposed Tech Spec Changes Required to Support Operation of Facility at Full Rated Power During Cycle 5. BAW-1565, Cycle 5 Reload Rept Encl
Date released: 09/21/2019 Download: ML15239A637


Cycle 5 Reload Rept.
ML19250C297
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 10/31/1979
From:
BABCOCK & WILCOX CO.
To:
References
Download: ML19250C297 (45)
Proposed Changes to Tech Spec Pages 2.1,2.3,3.2 & 3.5. Changes Affect Core Protection Limits,Reactor Protective Sys Max Allowable Setpoints & Vol Requirements for Borated Water Storage Tank
ML16148A269
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 11/16/1979
From:
DUKE POWER CO.
To:
References
Download: ML16148A269 (19)
Forwards Proposed Tech Spec Changes Required to Support Operation of Facility at Full Rated Power During Cycle 5. BAW-1565, Cycle 5 Reload Rept Encl
ML15239A636
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 11/16/1979
From: Parker W
Duke Power Co
To: Denton H R
Office of Nuclear Reactor Regulation
References
Download: ML15239A636 (45)