ML15239A060

From kanterella
Jump to navigation Jump to search
Forwards Meeting Summary,Duke Power Comments on Salp,Salp Slides,Revision Sheet & Final SALP Rept for Period 900801-920229 Re Insp Repts 50-269/92-01,50-270/92-01, 50-287/92-01 & 72-0004/92-01
ML15239A060
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/04/1992
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hampton J
DUKE POWER CO.
Shared Package
ML15239A061 List:
References
NUDOCS 9207020159
Download: ML15239A060 (29)


See also: IR 05000269/1992001

Text

JUN 04 1992

Docket Nos. 50-269, 50-270,

50-287, 72-4

License Nos.

DPR 38, DPR 47,

DPR 55, SNM 2503

Duke Power Company

ATTN:

Mr. J. W. Hampton

Vice President

Oconee Site

P.

0. Box 1439

Seneca, SC 29697

Gentlemen:

SUBJECT: SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE

(NRC INSPECTION REPORT NOS. 50-269/92-01, 50-270/92-01,

50-287/92-01 AND 72-4/92-01)

This refers to the NRC's Systematic Assessment of Licensee

Performance (SALP) report for your Oconee facility which was sent

to you on April 6,

1992; our meeting of April 15, 1992, at which we

discussed the report; and your written comments dated May 14,1992.

I have enclosed a summary of our presentation at the meeting, a

copy of your written comments, a copy of the SALP slides which were

used at the presentation, and the Final SALP report for the period

August 1, 1990 through February 1, 1992.

We appreciate your efforts in evaluating the Initial SALP Report

and providing comments.

The following is

our evaluation of your

comments.

Engineering/Technical Support

Your response requested that additional comments or consideration

be given to the following areas in the final SALP Report; licensed

operator training based on previous NRC inspection results, pre

examination reviews,

simulator

accuracy,

fittings

used

to

transition between different pipe sizes, startup transformer

operability, NRC Bulletin 88-08 response, and the Spent Fuel

Storage Installation-Docket Number.

We have carefully considered the justification for your request and

have modified the draft SALP Report to include the changes we

judged to be appropriate. These changes, however, did not alter

our overall evaluation.

In accordance with Section 2.790(a), a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

9207020159 920604

4I

PDR

ADOCK 05000269

1*1

0

PDR

JUN 04 1992

Duke Power Company

2

No reply to this letter is required; however, should you have any

questions concerning these matters, I will be pleased to discuss

them with you.

Sincerely,

tewart D. Ebneter

Regional Administrator

Enclosures:

1. Meeting Summary

2. Duke Power Comments on SALP

3. SALP Slides

4. Revision Sheet

5. Final SALP Report

cc w/encls:

M. E. Patrick

Compliance

Duke Power Company

P. 0. Box 1439

Seneca, SC 29679

A. V. Carr, Esq.

Duke Power Company

422 South Church Street

Charlotte, NC 28242-0001

County Supervisor of

Oconee County

Walhalla, SC 29621

Robert B. Borsum

Babcock and Wilcox Company

Nuclear Power Generation Division

1700 Rockville Pike, Suite 525

Rockville, MD 20852

J. Michael McGarry, III, Esq.

Winston and Strawn

1400 L Street, NW

Washington, D. C. 20005

Office of Intergovernmental Relations

116 West Jones Street

Raleigh, NC 27603

(cc w/encls cont'd -

See page 3)

Duke Power Company

3

(cc w/encls cont'd)

Heyward G. Shealy, Chief

Bureau of Radiological Health

South Carolina Department of Health

and Environmental Control

2600 Bull Street

Columbia, SC 29201

Manager, LIS

NUS Corporation

2650 McCormick Drive

Clearwater, FL 34619-1035

R. L. Gill

Nuclear Production Department

Duke Power Company

P. 0. Box 1007

Charlotte, NC 28201-1007

Karen E. Long

Assistant Attorney General

N. C. Department of Justice

P. O. Box 629

Raleigh, NC 27602

Duke Power Company

4

(cc w/encls cont'd)

Heyward G. Shealy, Chief

Bureau of Radiological Health

South Carolina Department of Health

and Environmental Control

2600 Bull Street

Columbia, SC 29201

Manager, LIS

NUS Corporation

2650 McCormick Drive

Clearwater, FL 34619-1035

R. L. Gill

Nuclear Production Department

Duke Power Company

P. 0. Box 1007

Charlotte, NC 28201-1007

Karen E. Long

Assistant Attorney General

N. C. Department of Justice

P. 0. Box 629

Raleigh, NC 27602

bcc w/encls:

L. Wiens, NRR

W. Miller, RII

G. A. Belisle, RII

A. R. Herdt, RII

Docue nt Control Desk

TTohn o w

0 K

IE

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Route 2, Box 610

Seneca, SC 29678

RII:

RI

RII*RP

RI

RP

RII:DRSS

BMiller

AB

isle

AHerdt

hnson BMallett

/92

05/

/92

06/ 1/92

0k( /92

Ob/1 /92

HQ:

I Dln

a:oDR

DRP

DMatthews

L ens

Harmon

schoff

f-7eyes

5/j/2/

9/92

92

I/92

/

/92

ENCLQSRE 1

MEETING SUMMARY

A.

A meeting was held on April 15, 1992, at the Oconee station to

discuss the results of the NRC Systematic Assessment

of

Licensee Performance (SALP) evaluation of your facility for

the appraisal period of August 1, 1990, through February 1,

1992.

IB. Licensee Attendees

H. Tucker, Senior Vice President, Nuclear Generation

Department

J. Hampton, Vice President, Oconee Nuclear Site

B. Barron, Station Manager

R. Sweigart, Operations Superintendent

J. Davis, Safety Assurance Manager

R. Gill, Jr., Licensing

M. Patrick, Compliance

The list of licensee attendees above does not include all the

Duke Power Company employees that were present at the SALP

presentation.

C.

NRC Attendees

J. Milhoan, Deputy Regional Administrator, Region II (RII)

J. Stohr, Director, Division of Radiation Safety

and Safeguards, RII

E. Merschoff, Deputy Director, Division of Reactor Safety,

RII

G. Zech, Chief, Performance and Quality Evaluation Branch,

Office of Nuclear Reactor Regulation (NRR)

A. Herdt, Chief, Reactor Projects Branch 3, RII

L. Wiens, Project Manager, Project Directorate 11-3, NRR

K. Clark,.Public Affairs Officer, RII

R. Trojanowski, Regional State Liaison Officer, RII

P. Harmon, Senior Resident Inspector, Oconee Facility

K. Poertner, Resident Inspector, Oconee Facility

B. Desai, Resident Inspector, Oconee Facility

C. Evans, Regional Counsel, RII

D.

Public Attendees

J. Barnett, Greenville News

C. Kreckler, Anderson Independent

J. Adams, Seneca Journal

D. Mangrum, Radio Station WGOG

M. Cox, Television Station WYFF (Channel 4)

D. Cambell, State of South Carolina

G. Snyder, State Of South Carolina

D. Evitt, Pickens County, South Carolina

ENCLOSURE

2

UNITED STATES

NUCLEAR REGULATORY

COMMISSION

NRC

SYSTEMATIC ASSESSMENT

OF

LICENSEE PERFORMANCE

(SALP)

LICENSEE PRESENTATION

DUKE PWVER

COMPANY

SALP CYCLE 9

AUGUST 1, 1990

THROUGH

FEBRUARY 1, 1992

OCONEE UNITS 1, 2 & 3

APRIL 15, 1992

SALP PROGRAM OBJECTIVES

1. IDENTIFY TRENDS IN LICENSEE

PERFORMANCE

2. PROVIDE A BASIS FOR ALLOCATION

OF NRC RESOURCES

3. IMPROVE NRC REGULATORY PROGRAM

REGION II ORGANIZATION

OFFICE OF THE ADMINISTRATOR

ADMINISTRATOR

S. EBNETER

DEPUTY

J. MILHOAN

DIVISION OF

DIVISION OF

DIVISION OF

REACTOR PROJECTS

REACTOR SAFETY

ADIATION SAFETY

AND SAFEGUARDS

DIR.

L. REYES

DIR.

A. GIBSON

DIR.

J. STOHR

DEPUTY J. JOHNSON

DEPUTY E. MERSCHOFF

DEPUTY

B. MALLET

DIVISION OF REACTOR PROJECTS

ORGANIZATION

DIVISION OF

REACTOR PROJECTS

DIR.

L. REYES

DEPUTY J. JOHNSON

REACTOR PROJECTS

BRANCH NO. 3

CHIEF A. HERDT

PROJECTS SECTION

PROJECTS SECTION

NO. 3A

NO. 38

CHIEF A. BELISLE

CHIEF P. SKINNER

CATAWBA

HATCH

MCGUIRE

VOGTLE

OCONEE

.

NRR ORGANIZATION

OFFICE OF

NUCLEAR REACTOR

REGULATION

DIR. T. MURLEY

ASSOC. DIRECTOR FOR

ASSOC. DIRECTOR FOR

PROJECTS

INSPECTION AND

J. PARTLOW

TECHNICAL ASSESSMENT

DIVISION OF

ENGINEERING

TECHNOLOGY

DIVISION OF

REACTOR PROJECTS I/il

DIVISION OF

OPERATIONAL EVENTS

S. VARGA, DIR. I/il

ASSESSMENT

G. LAINAS, ASST. DIR. II

D. MATTHEWS, DIR. 11-3

DIVISION OF

REACTOR INSPECTION

AND SAFEGUARDS

L. WIENS, PROJ. MGR.

ANDSAFEGUARDS

OCONEE

DIVISION OF RADIATION

PROTECTION AND

EMERGENCY PREPAREDNESS

DIVISION OF

DIVISION OF LICENSEE

PERFORMANCE AND

REACTOR PROJECTS III/IV/V

QUALITY EVALUATION

AND

SPECIAL PROJECTS

DIVISION OF

SYSTEMS TECHNOLOGY

PERFORMANCE ANALYSIS AREAS

FOR OPERATING REACTORS

A. PLANT OPERATIONS

B. RADIOLOGICAL CONTROLS

C. MAINTENANCE/SURVEILLANCE

D. EMERGENCY PREPAREDNESS

E. SECURITY

F. ENGINEERING/TECHNICAL SUPPORT

G. SAFETY ASSESSMENT/QUALITY

VERIFICATION

AREA PERFORMANCE

CATEGORY 1

LICENSEE MANAGEMENT ATTENTION TO

AND INVOLVEMENT IN NUCLEAR SAFETY

OR SAFEGUARDS ACTIVITIES RESULTED

IN A SUPERIOR LEVEL OF PERFORMANCE.

NRC WILL CONSIDER REDUCED LEVELS

OF INSPECTION EFFORT.

AREA PERFORMANCE

CATEGORY 2

LICENSEE MANAGEMENT ATTENTION TO

AND INVOLVEMENT IN NUCLEAR SAFETY

OR SAFEGUARDS ACTIVITIES RESULTED

IN A GOOD LEVEL OF PERFORMANCE.

NRC WILL CONSIDER MAINTAINING

NORMAL LEVELS OF INSPECTION

EFFORT.

AREA PERFORMANCE

CATEGORY 3

LICENSEE MANAGEMENT ATTENTION TO

AND INVOLVEMENT IN NUCLEAR SAFETY

OR SAFEGUARDS ACTIVITIES RESULTED

IN AN ACCEPTABLE LEVEL OF PERFORMANCE;

HOWEVER, BECAUSE OF THE NRC'S CONCERN

THAT A DECREASE IN PERFORMANCE MAY

APPROACH OR REACH AN UNACCEPTABLE

LEVEL, NRC WILL CONSIDER INCREASED

LEVELS OF INSPECTION EFFORT.

EVALUATION CRITERIA

1. MANAGEMENT INVOLVEMENT AND CONTROL

IN ASSURING QUALITY

2. APPROACH TO IDENTIFICATION AND

RESOLUTION OF TECHNICAL ISSUES

FROM A SAFETY STANDPOINT

3. ENFORCEMENT HISTORY

4. REPORTING, ANALYSIS AND CORRECTIVE

ACTION OF REPORTABLE EVENTS

5. STAFFING (INCLUDING MANAGEMENT)

6. TRAINING EFFECTIVENESS AND

QUALIFICATION

OCONEE

AUGUST 1, 1990 - FEBRUARY 1, 1992

(CYCLE 9)

COMP

619%

OTHER

FAILURE

OTHER 1

OPERATING 1

413%

PERSONNEL

MAINT. 2

7 22%

TEST/CALIB 3

DESIGN/

CONSTR.

1 546%

PERSONNEL

TOTAL

(7)

(32)

LERs

OPERATIONS

CATEGORY 2

OVERALL PERFORMANCE IN THIS

AREA DECLINED TO GOOD

STRENGTHS

OPERATIONS AT POWER

STAFF KNOWLEDGE / EXPERIENCE

CORRECTIVE ACTIONS

FIRE PROTECTION

OPERATIONS

CATEGORY 2

CHALLENGES

SHUTDOWN OPERATIONS

WATCHSTANDING PRACTICES

PROCEDURES

CONFIGURATION CONTROL

MANAGEMENT INVOLVEMENT

RADIOLOGICAL CONTROLS

CATEGORY 1

OVERALL PERFORMANCE IN THIS

AREA REMAINED SUPERIOR

STRENGTHS

PERFORMANCE

PERSONNEL

ALARA

EFFLUENT CONTROL

RADIATION MONITORING

RADIOLOGICAL CONTROLS

CATEGORY 1

CHALLENGES

CONTAMINATION CONTROL

MAINTAINING PERFORMANCE

MAINTENANCE/

SURVEILLANCE

CATEGORY 2

OVERALL PERFORMANCE IN THIS

AREA REMAINED GOOD

STRENGTHS

PERSONNEL

PROGRAMS-.*.

.*VIBRATION MONITORING

  • EROSION I CORROSION

MAINTENANCE/

SURVEILLANCE

CATEGORY 2

CHALLENGES

PERFORMANCE

  • MAINT. INDUCED VULNERABILITIES
  • SURVEILLANCE INDUCED EVENTS

INDEPENDENT VERIFICATION

PROCEDURAL COMPLIANCE

MATERIAL CONDITION

EMERGENCY

PREPAREDNESS

CATEGORY 1

OVERALL PERFORMANCE IN THIS AREA

REMAINED SUPERIOR

STRENGTHS

MANAGEMENT INVOLVEMENT

PERFORMANCE

PERSONNEL

FACILITIES

CORRECTIVE ACTION

CHALLENGE

MAINTAINING PERFORMANCE

SECURITY

CATEGORY 1

OVERALL PERFORMANCE IN THIS

AREA IMPROVED TO SUPERIOR

STRENGTHS

MANAGEMENT INVOLVEMENT

PERSONNEL

PERFORMANCE

FFD PROGRAM

CHALLENGES

CCTV PERFORMANCE

MAINTAINING PERFORMANCE

ENGINEERING/

TECHNICAL SUPPORT

CATEGORY 2

OVERALL PERFORMANCE IN THIS

AREA DECLINED TO GOOD

STRENGTHS

RESPONSIVENESS TO STATION

DBD PROGRAM

OPERATING EXPERIENCE REVIEW PROGRAM

MOV PROGRAM

ISI PROGRAM

ENGINEERING/

TECHNICAL SUPPORT

CATEGORY 2

CHALLENGES

PLANNING

PERFORMANCE

PROCEDURAL ADEQUACY

LICENSED OPERATOR TRAINING

SAFETY ASSESSMENT/

QUALITY VERIFICATION

CATEGORY 2

OVERALL PERFORMANCE IN THIS

AREA REMAINED GOOD

STRENGTHS

RESOLUTION OF SAFETY ISSUES

HARDWARE IMPROVEMENTS

INTERACTION WITH INDUSTRY AND THE NRC

CHALLENGES

SELF ASSESSMENT / OVERSIGHT

LICENSING SUBMITTALS

FACILITY PERFORMANCE SUMMARY

OCONEE-CYCLE 9/18 MOS.

RATING LAST RATING THIS

FUNCTIONAL AREA

PERIOD

PERIOD

PLANT OPERATIONS

1

2

RADIOLOGICAL CONTROLS

1

1

MAINTENANCE/SURVEILLANCE

2(I)

2

EMERGENCY PREPAREDNESS

1

1

SECURITY

2(I)

1

ENGINEERING/TECHNICAL SUPPORT

1

2

SAFETY ASSESSMENT/

2

2

QUALITY VERIFICATION