Interim Letter Public Tables (Tables 1 and 2)
ML15238B723
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/26/2015
From: Nebiyu Tiruneh, Willingham M
NRC/NRO/DSEA/RHMB
To:
Willingham M
References
Download: ML15238B723 (2)


Text

Oconee, Units 1, 2, & 3 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Stillwater Waves/ Design Basis Reference Elevation Runup Hazard Elevation Local Intense Precipitation Not included Not included Not included Staff Assessment in DB in DB in DB Streams and Rivers Flooding in Reservoirs - Keowee 808.0 ft MSL Not 808.0 ft MSL Staff Assessment Reservoir (not calculated at applicable Power Block)

Failure of Dams and Onsite Water Control/Storage Structures Not included Not included Not included Staff Assessment in DB in DB in DB Storm Surge Not included Not included Not included Staff Assessment in DB in DB in DB Seiche Not included Not included Not included Staff Assessment in DB in DB in DB Tsunami Not included Not included Not included Staff Assessment in DB in DB in DB Ice-Induced Flooding Not included Not included Not included Staff Assessment in DB in DB in DB Channel Migrations/Diversions Not included Not included Not included Staff Assessment in DB in DB in DB Note 1: Reported values are rounded to the nearest one-tenth of a foot.

Oconee, Units 1, 2, & 3 Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism Stillwater Waves/ Reevaluated Reference Elevation Runup Hazard Elevation Local Intense Precipitation 800.4 ft MSL Minimal 800.4 ft MSL FHRR Section 3.1 Streams and Rivers Streams and Rivers (Flooding in 808.9 ft MSL 3.3 ft 812.2 ft MSL FHRR Section 3.2 Reservoirs, Keowee)

Failure of Dams and Onsite Water Control/Storage Structures

[Redacted] [Redacted] [Redacted] [Redacted] [Redacted]

Note 1: The licensee is expected to develop flood event duration parameters and applicable flood associated effects to conduct the MSA consistent with the guidance. The NRC staff has reviewed information related to flood event duration parameters (including warning time and period of inundation).

Note 2: Reevaluated hazard mechanisms bounded by the current design basis (see Table 1) are not included in this table.

Note 3: Reported values are rounded to the nearest one-tenth of a foot.