May 1, 1996 Duke Power Company ATTN: Mr. J. W. Hampton Vice President Oconee Site P. 0. Box 1439 Seneca, SC 29679
SUBJECT:
PLANT PERFORMANCE REVIEW - OCONEE NUCLEAR STATION
Dear Mr. Hampton:
On February 26, 1996, the NRC staff completed the semiannual Plant Performance Review (PPR) of the Oconee Nuclear Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for Oconee involved the participation of all regional technical divisions and NRR in evaluating inspection results and safety performance information for the period from September 1995 to February 1996.
PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the Oconee PPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability issues to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next six months. The basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.
During each NRC inspection planned during this period, specific attention will be given to the verification of selected Updated Final Safety Analysis Report (UFSAR) commitments. Applicable portion(s) of the UFSAR that relate to the inspection activities will be reviewed and verification made that the UFSAR commitments have been properly implemented into plant practices, procedures and/or parameters. The goal is to determine the accuracy of the UFSAR regarding existing plant practices and conditions by providing specific attention to the UFSAR when performing various reactor inspections.
Inspectors will not be judging the overall completeness of the UFSAR; rather, the inspections will focus on identifying differences between the UFSAR description and the plant.
9604100123 960301 PDR ADOCK 05000269 P
OPC 2
We will inform you of any changes to the inspection plan. If you have any questions, please contact R. Crlenjak at (404) 331-5506.
Sincerely, Original signed by R. V. Crlenjak R. V. Crlenjak, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-269, 50-270, 50-287 License Nos. DPR-38, DPR-47, DPR-55
Enclosure:
Inspection Plan cc w/encl:
Mr. J. E. Burchfield Compliance Duke Power Company P. 0. Box 1439 Seneca, SC 29679 Mr. Paul R. Newton Legal Department (PB05E)
Duke Power Company 422 South Church Street Charlotte, NC 28242-0001 Mr. Robert P. Gruber Executive Director Public Staff - NCUC P. 0. Box 29520 Raleigh, NC 27626-0520 Mr. Robert B. Borsum Babcock and Wilcox Company Nuclear Power Generation Division 1700 Rockville Pike, Suite 525 Rockville, MD 20852 Mr. J. Michael McGarry, III, Esq.
Winston and Strawn 1400 L Street, NW Washington, D. C. 20005 cc w/encl cont'd:
(See page 3)
DPC 3
cc w/encl cont'd:
Office of Intergovernmental Relations 116 West Jones Street Raleigh, NC 27603 Mr. Max Batavia, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 County Supervisor of Oconee County Walhalla, SC 29621 Manager, LIS NUS Corporation 2650 McCormick Drive Clearwater, FL 34619-1035 Mr. G. A. Copp Licensing -
EC050 Duke Power Company P. 0. Box 1006 Charlotte, NC 28201-1006 Ms. Karen E. Long Assistant Attorney General N. C. Department of Justice P. 0. Box 629 Raleigh, NC 27602 Distribution w/encl:
L. A. Wiens, NRR R. Carroll, RH R. V. Crlenjak, RII G. A. Hallstrom, RH PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Commission 78128 Rochester Highway Seneca, SC 29672 SEND TO PUBLIC DOCUMENT ROOM?
YES
-NO OFFICE RII:DRP RII:DRS RII:D RII:DRS RII:D RII:DRS SIGNATURE NAME R
.sr HChr tensen CCasto TPeebles rr PFredrickson DATE 03
/96 96 03/
/96 03
/96 03 /14 96
)
6 COPY?
ES NO YES NONO S
NO NO ES NO OFFICIAL REtRD COPY DOCUMENT NAME:
\\0CONPPR3.96
0 0
DPC 4
SEND____
TO PUBLIC DOCU~MENT ROOM?
(YES/No OFFICE RII:DRP SIGNATURE NAME achoff_
DATE 03 jZA / 96 03/
/96 03/
/96 03/
/96 03/
/96 03/
/96 COPY?
NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME:
G:\\OCONPPR3.96
OCONEE INSPECTION PLAN INSPECTION PROCEDURE/
NUMBER OF PLANNED INSPECTION TEMPORARY INSTRUCTION TITLE/[PROGRAM AREA]
INSPECTORS DATES TYPE OF INSPECTION - COMMENTS 0
Core -
Interim Licensed IP 71(01 Licensed Operator 1
5/6-10/96 Operator Requalification Requalification Program Program Inspection Evaluation
[PLANT OPERATIONS -
OLHP]
Maintenance & Surveillance 6/3-7/96 Core - Support to Resident IP 62703 & 61726 Observations 1
8/19-23/96 Inspector
[MAINTENANCE -
MNT]
Maintenance Implementation Regional Initiative IP 62700
[MAINTENANCE - MNT]
1 4/22-26/96 Equipment Failures, Failure 5/6-10/96 Trending, Root Cause...
Core - Engineering Backlogs, IP 37550 Engineering 3
3/25-29/96 Problem Identification &
[ENGINEERING -
ENG]
4/1-5/96 Resolution, Operability Evaluations...
Procurement Program &
Regional Initiative IP 38701 & 38703 Commercial Grade 2
9/23-27/96 Substitution and Verification Procurement Inspection 9/30 - 10/4/96 of Critical Characteristics
[ENGINEERING -
ENG]
in Commercial Grade Procurement IP 93801 Safety System Functional 5/6-10/96 Regional Initiative Inspection 2
5/13-17/96 Inspection of SSF
[ENGINEERING
-_ENG]
ENCLOSURE 1 of 2
(OCOINSP cont 'd)
INSPECTION PROCEDURE/
NUMBER OF PLANNED INSPECTION TEMPORARY INSTRUCTION TITLE/[PROGRAM AREA]
INSPECTORS DATES TYPE OF INSPECTION - COMMENTS IP 37550 Engineering 1
6/17-21/96 Regional Initiative - Keowee
[ENGINEERING -
ENG]
modifications and IST Radioactive Waste, Transportation, Water IP 84750 & 86750 Chemistry, Confirmatory 1
3/18-22/96 Core Measures, Environmental Monitoring
[PLANT SUPPORT -
PS]
Occupational Exposure, IP 83750 Shipping and 1
3/18-22/96 Core Transportation
[PLANT SUPPORT -
PS]
IP 82301 Evaluation of EP Exercise 3
9/16-20/96 Core
[PLANT SUPPORT -
PS]
IP 81700 Physical Security Program 1
4/15-19/96 Core
[PLANT SUPPORT -
SI_
Physical Security 6
5/20-23/96 OSRE - NRR
[PLANT SUPPORT -
SI]
IP 92903 Service Water Followup 2
8/26-30/96 Regional Initiative - Service
[ENGINEERING -
SI]
9/9-13/96 Water Followup IP 72700 Startup Testing 1
4/29 -
5/3/96 Regional Initiative - Unit 2
[MAINTENANCE -
SI]
Startup Testing Vehicle Barrier System 3
4/8-10/96 Regional Initiative - Vehicle TI 2515-132
[PLANT SUPPORT -
SI Barrier System ENCLOSURE 2 of 2