October 13, 1995 Duke Power Company ATTN:

Mr. J. W. Hampton Vice President Oconee Site P. 0. Box 1439 Seneca, SC 29679

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - OCONEE

Dear Mr. Hampton:

On September 15, 1995, the NRC staff completed the semiannual Plant Performance Review (PPR) of the Oconee Nuclear Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for Oconee involved the participation of all regional technical divisions and NRR in evaluating inspection results and safety performance information for the period from March 1995 to September 1995. PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Oconee PPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability issues to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next six months. The basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.

We will inform you of any changes to the inspection plan. If you have any questions, please contact R. Crlenjak at (404) 331-5506.

Sin erely, 9510230327 951013 llis W. erschoff, Director PDR ivision f Reactor Projects a

PDR Docket Nos. 50-269, 50-270, 50-287 License Nos. DPR-38, DPR-47, DPR-55

Enclosure:

Inspection Plan fy*4 cc w/encl:

(See page 2)

DPC 2

cc w/encl:

Mr. J. E. Burchfield Compliance Duke Power Company P. 0. Box 1439 Seneca, SC 29679 Mr. A. V. Carr, Esq.

Duke Power Company 422 South Church Street Charlotte, NC 28242-0001 Mr. Robert P. Gruber Executive Director Public Staff - NCUC P. 0. Box 29520 Raleigh, NC 27626-0520 Mr. Robert B. Borsum Babcock and Wilcox Company Nuclear Power Generation Division 1700 Rockville Pike, Suite 525 Rockville, MD 20852 Mr. J. Michael McGarry, III, Esq.

Winston and Strawn 1400 L Street, NW Washington, D. C. 20005 Office of Intergovernmental Relations 116 West Jones Street Raleigh, NC 27603 Mr. Max Batavia, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 County Supervisor of Oconee County Walhalla, SC 29621 Manager, LIS NUS Corporation 2650 McCormick Drive Clearwater, FL 34619-1035 (cc w/encl cont'd - See page 3)

DPC 3

(cc w/encl cont'd)

Mr. G. A. Copp Licensing - EC050 Duke Power Company P. 0. Box 1006 Charlotte, NC 28201-1006 Ms. Karen E. Long Assistant Attorney General N. C. Department of Justice P. 0. Box 629 Raleigh, NC 27602 Distribution w/encl:

L. A. Wiens, NRR R. Carroll, RH R. V. Crlenjak, RH G. A. Hallstrom, RH PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Commission 78128 Rochester Highway Seneca, SC 29672 SEND TO PUBLIC DOCUMENT ROOM?

(YES/

NO OFFICE RII:DRP RII:DRP RII:DLSS RIL RS SIGNATURE NAME RCrlenjak KBarr sto DATE

/ 95 1o AV/95 1

/

195 5

10 /95 1 0/

/95 COPY?

YE NO YES NO YES NO ES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME.

\\0CONEE.PPR

OCONEE INSPECTION PLAN D

Inspection Title Dates

  1. ins RI -

Core inspection focus on oversight groups ongoing 1

(PORC performance) and operator command and control across functional areas Module 40500 DRS - Service water followup 12/11-15/95 2

Module TI 2515/118, 92903, 92902 DRS - Review maintenance and oversight process for BOP TBD*

Module 62700 (2 weeks)

DRS,RI - Outage focus, low point maintenance TBD*

Module 62700 (2 weeks)

(Ul & 2 RFOs)

DRS,RI - Keowee upgrade project; engineering on (first week) 1 and off site oversight activities review 12/9-13/95 (regional initiative)

Module 37550 (6 weeks)

(remainder)

TBD*

DRS - Engineering core to focus on backlog TBD*

management; STAR module modification; engineering self-assessment review Module 37550, 40500 (9 weeks)

DRS - MOV (GL 89-10) closeout 12/4-15/95 3

Module TI 2515/109 DRS - Access Authorization 11/13-17/95 1

Module TI 2515/127 DNMS - Safeguards core 11/27/95-1 Module 81700 12/1/95 DRS - REC core 11/27/95-1 Module 84750, 86750 12/1/95 1/29/96-1 2/2/96 DRS - Emergency Preparedness core 12/18-22/95 1

Module 82701 DRS - FRP core 11/6-10/95 1

Module 83750 Inspection dates and inspectors to be determined. Inspections will be completed during the next six months.

ENCLOSURE