UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 12, 2015 Mr. Richard M. Glover Site Vice President H.B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road (RNPA01)
Hartsville, SC 29550
SUBJECT:
H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS INSPECTION REPORT 05000261/2015502
Dear Mr. Glover:
On July 23, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your H.B. Robinson Nuclear Plant, Unit 2. The enclosed inspection report (IR) documents the inspection results that were discussed on July 23, 2015, with you and members of the plant staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter, its Enclosure, and your response if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly
Available Records (PARS) component of NRC's Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-261 License Nos. DPR-23
Enclosure:
Attachment:
Supplementary Information cc: Distribution via Listserv
ML15225A185 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRS/PSB1 RII:DRS/PSB1 RII:DRS/OLB2 RII:DRS/PSB1 SIGNATURE SPS CAF2 WTL RSB2 BRB1 NAME S. Sanchez C. Fontana W. Loo R. Baldwin B. Bonser DATE 8/ 12 /2015 8/ 12 /2015 8/ 12 /2015 8/ 12 /2015 8/ 12 /2015 E-MAIL COPY YES NO YES NO YES NO YES NO YES NO
Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION II Docket No:
05000261 License No:
DPR-23 Report No:
05000261/2015502 Licensee:
Duke Energy Progress, Inc.
Facility:
H.B. Robinson Steam Electric Plant, Unit 2 Location:
Hartsville, SC Dates:
July 20 - 24, 2015 Inspectors:
Steven Sanchez, Senior Emergency Preparedness Inspector Christopher Fontana, Emergency Preparedness Inspector Wade Loo, Senior Health Physicist Inspector Richard Baldwin, Senior Operations Engineer Approved by:
Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety
SUMMARY
Inspection Report (IR) 05000261/2015502; 7/20/2015 - 7/24/2015; H.B. Robinson Steam Electric Plant, Unit 2; Exercise and Baseline Inspection This report covers an announced inspection by two emergency preparedness inspectors, one senior operations engineer, and one senior health physicist. No findings of significance were identified. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process.
REPORT DETAILS
- 1.
REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP1 Exercise Evaluation
- a.
Inspection Scope The onsite inspection consisted of the following review and assessment:
The adequacy of the licensees performance in the biennial exercise, conducted on July 21, 2015, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards (RSPS) in 10 CFR 50.47(b)(4), (5), (9), and (10);
which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
The overall adequacy of the licensees emergency response facilities (ERF) with regard to NUREG-0696, Functional Criteria for Emergency Response Facilities, and Emergency Plan commitments. The facilities assessed were the Control Room Simulator, Technical Support Center (TSC), Operations Support Center (OSC), and Emergency Operations Facility (EOF).
Other performance areas, such as the emergency response organizations (ERO) recognition of abnormal plant conditions; command and control, intra-and inter-facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies; and the overall implementation of the emergency plan and its implementing procedures.
Past performance issues from NRC inspection reports and Federal Emergency Management Agency (FEMA)/Department of Homeland Security (DHS) exercise reports to determine the effectiveness of corrective actions as demonstrated during this exercise to ensure compliance with 10 CFR 50.47(b)(14).
The post-exercise critique process and the presentation to the licensee's senior management conducted on July 23, 2015, to evaluate the licensees self-assessment of its ERO performance during the exercise, and to ensure compliance with 10 CFR Part 50, Appendix E, Subsection IV.F.2.g.
The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.
- b.
Findings No findings were identified.
1EP4 Emergency Action Level and Emergency Plan Changes
- a.
Inspection Scope Since the last NRC inspection of this program area, multiple revisions have been made to the Radiological Emergency Plan and its implementing procedures. The licensee determined that, in accordance with 10 CFR 50.54(q), the Plan continued to meet the requirements of 10 CFR 50.47(b), and Appendix E to 10 CFR Part 50. The inspectors reviewed the Emergency Plan changes, and sampled implementing procedure changes made between July 2014 and July 2015, to evaluate for potential reductions in the effectiveness of the Plan. As this review was not documented in a Safety Evaluation Report, and does not constitute formal NRC approval of the changes, these changes remain subject to future NRC inspection in their entirety.
The inspection was conducted in accordance with NRC Inspection Procedure (IP) 71114, Attachment 04, Emergency Action Level and Emergency Plan Changes. The applicable planning standards of 10 CFR 50.47(b), and its related requirements in 10 CFR Part 50, Appendix E, were used as reference criteria.
The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the emergency action level (EAL) and emergency plan changes on an annual basis.
- b.
Findings No findings were identified.
1EP8 Exercise Evaluation - Scenario Review
- a.
Inspection Scope Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, Exercise Evaluation - Scenario Review, to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14).
The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise valuation on a biennial basis.
- b.
Findings No findings were identified.
- 4.
OTHER ACTIVITIES 4OA1 Performance Indicator Verification
- a.
Inspection Scope The inspectors sampled licensee submittals relative to the performance indicators (PIs) listed below for the period April 1, 2014, through March 31, 2015. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in Nuclear Energy Institute (NEI) 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, was used to confirm the reporting basis for each data element.
Emergency Preparedness Cornerstone ERO Drill/Exercise Performance (DEP)
ERO Readiness Alert Notification System (ANS) Reliability For the specified review period, the inspectors examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspectors verified the accuracy of the PIs for ERO and DEP through review of a sample of drill and event records. The inspectors reviewed selected training records to verify the accuracy of the PI for ERO drill participation for personnel assigned to key positions in the ERO. The inspectors verified the accuracy of the PI for ANS reliability through review of a sample of the licensees records of periodic system tests. The inspectors also interviewed the licensee personnel who were responsible for collecting and evaluating the PI data. Licensee procedures, records, and other documents reviewed within this inspection area, are listed in the Attachment.
This inspection satisfied three inspection samples for PI verification on an annual basis.
- b.
Findings No findings were identified.
4OA6 Meetings, Including Exit On July 23, 2015, the inspection team presented the inspection results to Mr. R. Glover and other members of the plant staff. The inspectors confirmed that no proprietary information was provided during the inspection.
ATTACHMENT: Supplementary Information
Attachment SUPPLEMENTARY INFORMATION KEY POINTS OF CONTACT Licensee personnel M. Austin, Fleet Emergency Preparedness C. Caudell, Regulatory Affairs J. Cole, Maintenance Superintendent S. Connelly, Regulatory Affairs Lead Engineer T. Cosgrove, Plant Manager P. Fagan, Engineering Director C. Freligh, Nuclear Oversight Superintendent F. Giannone, Training Manager R. Glover, Site Vice President L. Grant, Emergency Preparedness D. Hall, Nuclear Oversight L. Hall, Emergency Preparedness R. Hightower, Regulatory Affairs Manager D. Hoffman, Nuclear Oversight Manager K. Holbrook, Operations Manager J. Kammer, Engineering General Manager M. Nelson, Emergency Preparedness J. Nuckles, Nuclear Oversight Lead Auditor J. Overly, Fleet Emergency Preparedness Manager S. Peavyhouse, Organizational Effectiveness Director T. Pilo, Emergency Preparedness Manager ITEMS OPENED, CLOSED, DISCUSSED, AND UPDATED None LIST OF DOCUMENTS REVIEWED 1EP1 Exercise Evaluation Procedures AD-EP-ALL-0202, Emergency Response Offsite Dose Assessment, Rev. 0 AD-EP-ALL-0802, Conducting Drills and Exercises, Rev. 0 AD-EP-ALL-0803, Evaluation and Critique of Drills and Exercises, Rev. 0 EPEOF-00, Activation and Operation of the Emergency Operations Facility, Rev. 20 EPCLA-01, Emergency Control, Rev. 42 Records and Data H. B. Robinson Steam Electric Plant, Unit No. 2, Duke Energy, 2015 Biennial Emergency Preparedness Evaluation Exercise, July 21, 2015, Scenario Manual
Corrective Action Program Documents (Action Requests)
AR 759901759901 Simulator Emergency Response Data System (ERDS) communication not made with the Incident Response Center (IRC)
AR 759905759905 ERFIS wall chart mimic display AR 759915759915 TSC confusion on spray train status AR 759930759930 Southern Exposure exercise OSC improvement item AR 759935759935 Controller book was not continuously maintained in hand AR 759938759938 Southern Exposure exercise OSC chemistry sampling requirements AR 759940759940 Guidance needed on how Security to establish safeguards bridge AR 759948759948 Change needed to EPNOT-01 for release magnitude AR 759950759950 Tracking of Operations from OSC AR 759951759951 ERO radiation monitoring system data not accurate AR 759958759958 During exercise simulator ERDS data not received by NRC AR 759961759961 Slow to announce GE during exercise AR 759962759962 WEBEOC status board usage gaps AR 759963759963 EP exercise ENMON team air sample practice AR 759964759964 Dose assessment did not reflect correct release pathway AR 759965759965 ERO drill habitability AR 759967759967 Piggy-back mode of cooling during exercise AR 759980759980 WCC SRO was unable to log into his position title in WEBEOC AR 759987759987 NRC DEP KPI PAR failure during graded exercise AR 759995759995 Darlington County sirens MODBUS error AR 759996759996 EP member tested sirens during NRC exercise AR 760347760347 Simulator control room communications during NRC exercise AR 760349760349 Near miss on exercise evaluator prompting 1EP4 Emergency Action Level and Emergency Plan Changes Procedures EMG-NGGC-0010, Emergency Plan Change Screening & Evaluation 10 CFR 50.54(q)(3),
Rev. 4 Change Packages PLP-007, Robinson Emergency Plan, Revs. 81, 82, 83, and 84 EPCLA-04, Emergency Action Level Technical Bases Document, Revs. 11 and 12 Emergency Action Level Matrix, Sheet 2, Rev. 6 EREG#692188, 50.54(q)(3) Screening Sheet, dated 6/20/2014 EREG#692188, 50.54(q)(3) Evaluation Sheet, dated 6/20/2014 EREG#740243, 50.54(q)(3) Screening Sheet, dated 6/20/2014 EREG#740243, 50.54(q)(3) Screening Sheet, dated 6/20/2014 EREG#741159, 50.54(q)(3) Screening Sheet, dated 6/16/2014 EREG#741159, 50.54(q)(3) Screening Sheet, dated 6/16/2014 Corrective Action Program Documents PRR 760338, Change corporate communications location from Raleigh to Charlotte 1EP8 Exercise Evaluation Records and Data H. B. Robinson Steam Electric Plant Unit No. 2, Duke Energy 2015 Biennial Emergency Preparedness Evaluation Exercise, July 21, 2015, Scenario Manual
4OA1 Performance Indicator Verification Procedures Records and Data 2015 Emergency Response Organization Teams, Updated 1/31/2015 DEP opportunities documentation for second, third, and fourth quarters 2014 and first quarter 2015 Siren test data for second, third, and fourth quarters 2014 and first quarter 2015 Drill and exercise participation records of ERO personnel for second, third, and fourth quarters 2014 and first quarter 2015 Corrective Action Program Documents LIST OF ACRONYMS USED ANS Alert and Notification System AR Action Request DEP Drill and Exercise Performance DHS Department of Homeland Security EAL Emergency Action Level EOF Emergency Operations Facility ERDS Emergency Response Data System ERF Emergency Response Facility ERO Emergency Response Organization FEMA Federal Emergency Management Agency IP Inspection Procedure IRC Incident Response Center NEI Nuclear Energy Institute OSC Operations Support Center PIs Performance Indicators RSPS Risk-Significant Planning Standard TSC Technical Support Center