Response to Notice of Violation Inspection Report 05000298/2015007
ML15224B562
Person / Time
Site: Cooper Entergy icon.png
Issue date: 08/11/2015
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Limpias O
Nebraska Public Power District (NPPD)
References
IR 2015007
Download: ML15224B562 (3)


See also: IR 05000298/2015007

Text

August 11, 2015

EA-15-089

Mr. Oscar A. Limpias

Vice President-Nuclear and CNO

Nebraska Public Power District

Cooper Nuclear Station

72676 648A Avenue

P.O. Box 98

Brownville, NE 68321

SUBJECT: RESPONSE TO NOTICE OF VIOLATION INSPECTION REPORT

05000298/2015007

Dear Mr. Limpias,

On June 22, 2015, the Nuclear Regulatory Commission (NRC) issued a component design

basis inspection report (ML15173A450) which included a cited violation for Nebraska Public

Power Districts failure to correctly translate regulatory and design basis requirements

associated with tornado and high wind-generated missiles into design information necessary to

protect the emergency diesel generator fuel oil storage tank vent line components. The

June 22, 2015, letter also included the associated Notice of Violation which required you to

respond in writing within 30 days. You responded by letter dated July 22, 2015,

(ML15215A369).

The NRC has reviewed the information you provided in your response to the Notice of Violation.

The NRC will inform you via future correspondence if further inspection is warranted.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

made available electronically for public inspection in the NRC Public Document Room or from

the NRCs Agencywide Documents Access Management System (ADAMS), accessible from the

NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-298

License: DPR-46

cc: Electronic Distribution to Cooper Nuclear Station

ML15224B562

SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword

By: TRF Yes No Non-Sensitive Publicly Available NRC-002

OFFICE C:EB1

NAME TFarnholtz/tek

SIGNATURE /RA/

DATE 8/11/15

Letter to Oscar A. Limpias from Thomas R. Farnholtz, dated August 11, 2015

SUBJECT: RESPONSE TO NOTICE OF VIOLATION INSPECTION REPORT

05000298/2015007

Distribution:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Acting Senior Resident Inspector (Dustin.Reinert@nrc.gov)

Resident Inspector (Christopher.Henderson@nrc.gov)

Branch Chief, DRP/C (Greg.Warnick@nrc.gov)

Senior Project Engineer (Ray.Azua@nrc.gov)

Project Engineer (Paul.Nizov@nrc.gov)

Project Engineer (Michael.Stafford@nrc.gov)

Administrative Assistant (Amy.Elam@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Siva.Lingam@nrc.gov)

Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov

ACES (R4Enforcement.Resource@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)