August 11, 2015
Mr. Oscar A. Limpias
Vice President-Nuclear and CNO
Nebraska Public Power District
Cooper Nuclear Station
72676 648A Avenue
P.O. Box 98
Brownville, NE 68321
SUBJECT:
RESPONSE TO NOTICE OF VIOLATION INSPECTION REPORT
Dear Mr. Limpias,
On June 22, 2015, the Nuclear Regulatory Commission (NRC) issued a component design
basis inspection report (ML15173A450) which included a cited violation for Nebraska Public
Power Districts failure to correctly translate regulatory and design basis requirements
associated with tornado and high wind-generated missiles into design information necessary to
protect the emergency diesel generator fuel oil storage tank vent line components. The
June 22, 2015, letter also included the associated Notice of Violation which required you to
respond in writing within 30 days. You responded by letter dated July 22, 2015,
(ML15215A369).
The NRC has reviewed the information you provided in your response to the Notice of Violation.
The NRC will inform you via future correspondence if further inspection is warranted.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room or from
the NRCs Agencywide Documents Access Management System (ADAMS), accessible from the
NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket: 50-298
License: DPR-46
cc: Electronic Distribution to Cooper Nuclear Station
SUNSI Review
By: TRF
ADAMS:
Yes No
Sensitive
Non-Sensitive
Non-Publicly Available
Publicly Available
Keyword
OFFICE
C:EB1
NAME
TFarnholtz/tek
SIGNATURE
/RA/
DATE
8/11/15
Letter to Oscar A. Limpias from Thomas R. Farnholtz, dated August 11, 2015
SUBJECT:
RESPONSE TO NOTICE OF VIOLATION INSPECTION REPORT
Distribution:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Acting Senior Resident Inspector (Dustin.Reinert@nrc.gov)
Resident Inspector (Christopher.Henderson@nrc.gov)
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Senior Project Engineer (Ray.Azua@nrc.gov)
Project Engineer (Paul.Nizov@nrc.gov)
Project Engineer (Michael.Stafford@nrc.gov)
Administrative Assistant (Amy.Elam@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Siva.Lingam@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov
ACES (R4Enforcement.Resource@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)