0 July 28, 1989 0
Docket Nos. 50-269, 50-270 and 50-287 LICENSEE:
Duke Power Company FACILITY:
Oconee Nuclear Station, Units 1, 2 and 3
SUBJECT:
SUMMARY
OF JULY 13, 1989 MEETING AT OCONEE ON SELF-INITIATED TECHNICAL AUDIT On July 13, 1989, NRC staff members met with representatives of Duke Power Company (DPC) comprising a Self-Initiated Technical Audit (SITA) team. The purpose of the meeting was to discuss in detail the SITA process as it was being applied to the Oconee emergency power distribution system.
DPC made a brief presentation of the SITA process and introduced the SITA team members.
The remainder of the meeting was comprised of questions and answers between the NRC and the SITA team.
As presented by the DPC representatives, the SITA process will perform an indepth engineering review of a vertical slice of the emergency electrical system.
The review will encompass the system design, Technical Specifications, operating procedures, administrative procedures, preventative maintenance, surveillances and operator training. When reviewing various areas, the SITA team is to evaluate both whether the requirements are being met and if the requirements are appropriate. The SITA process will review to a level that will ensure the system can adequately perform its design function, and will include support and auxiliary systems as necessary, including those at the Keowee Station. If a weakness is found in a component or subsystem, other similar components or subsystems will be reviewed to determine if a generic problem exits. The present SITA was recently started and no major design weaknesses have been found to date.
It was also stated that a Design Basis Documentation (DBD) program is being conducted on the Oconee emergency electrical system concurrently with the SITA.
Any technical attributes of the SITA which could be affected by changes in the DBD will be revisited by the SITA team. A formal report of the SITA will be prepared.
After the meeting with the SITA team concluded, the NRC staff members toured the Keowee hydrostation.
89080340199 890728 PDR ADOCK 05000269 PFDC_
-2 Meeting participants are listed in Enclosure 1. Handouts distributed by DPC during the meeting are provided in Enclosure 2.
/s/
Leonard A. Wiens, Project Manager Project Directorate 11-3 Division of Reactor Projects I/II
Enclosures:
As stated cc w/enclosures:
See next page DISTRIBUTION Docket File NRC PDR Local PDR PDII-3 Reading J. Sniezek 12-G-18 D. Matthews 14-H-25 M. Rood 14-H-25 L. Wiens 14-H-25 H. Ornstein MNBB-9715 S. Mazumdar MNBB-4705 S. Athavale 9-A-1 L. Wert RII M. Hunt RII OGC 15-8-18 E. Jordan MNBB-3302 ACRS (10)
P-315 B. Borchardt 17-D-19 PDII-3.
PD I LWiens DMt hews
- 9 /% /89
/ /89
Oconee Nuclear Station Units Nos. 1, 2 and 3 cc:
Mr. A. V. Carr, Esq.
Mr. Paul Guill Duke Power Company Duke Power Company P. 0. Box 33189 Post Office Box 33189 422 South Church Street 422 South Church Street Charlotte, North Carolina 28242 Charlotte, North Carolina 28242 J. Michael McGarry, III, Esq.
Bishop, Cook, Purcell & Reynolds Mr. Alan R. Herdt, Chief 1400 L Street, N.W.
Project Branch #3 Washington, D.C. 20005 U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Mr. Robert B. Borsum Atlanta, Georgia 30323 Babcock & Wilcox, Nuclear Power Division Ms. Karen E. Long Suite 525 AssistantAttorney General 1700 Rockville 'Pike N. C. Department of Justice Rockville, Maryland 20852 P.O. Box 629 Raleigh, North Carolina 27602 Manager, LIS NUS Corporation Mr. H. B. Tucker, Vice President 2536 Countryside Boulevard Nuclear Production Department Clearwater, Florida 34623-1693 Duke Power Company 422 South Church Street Senior Resident Inspector Charlotte, North Carolina 28242 U.S. Nuclear Regulatory Commission Route 2, Box 610 Seneca, South Carolina 29678 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. Heyward G. Shealy, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201 Office of Intergovernmental Relations 116 West Jones Street Raleigh, North Carolina 27603 Honorable James M. Phinney County Supervisor of Oconee County Walhalla, South Carolina 29621
ENCLOSURE 1 ATTENDEES NAME ORGANIZATION Len Wiens NRC/NRR/PDII-3 Hal Ornstein NRC/AEOD/ROAB Subinoy Mazumdar NRC/AEOD/ROAB S. V. Athavale NRC/NRR/RSIB Milton D. Hunt NRC/RII/DRS Eng. Branch Len Wert NRR/Oconee Resident J. N. Pope DPC/ONS D. M. Ervin DPC/DE J. A. Effinore DPC/QA-Audit Paul Guill DPC/NPD-NSA David Byers DPC/Transmission John Frye DPC/QA-SITA Bill Whitlock DPC/DE/ME Al Rose DPC/Transmission EM&C/CNS Ed Ballenger DPC/Const. Maint./G.O.
Jack Peele DUKE/Design Engr./Nuclear Div.
Gary Cruzan Duke/Design Engr./Nuclear Div.
Thamir Al Hussaini Duke/Design Engr./Engr. Support Kathy Bartos DPC/NPD/Nuclear Mnt.-I&E Dick Sweigert DPC/OPS Bob Gill DPC/Compliance Ed Legette DPC/Oconee Tom Curtiss DPC/Oconee Compliance Gary Rothenberger DPC/ISG
ENCLOSURE 2 SITA
SUMMARY
TO DATE PROCESS TEAM MAKE UP AND SELECTION REPORT AND FOLLOW UP ACTIVITIES
0 SITA
SUMMARY
TO DATE (1-89)
OCONEE MCGUIRE CATAWBA SYSTEM LPSW /
DG STARTING ESS. 600V EPDS" AIR &VG*
MCC TEAM SIZE 12/12 9
9 ENGINEERS 8 / 8 7
7 PE'S 7/2 2
2 SRO'S 1/1 EXPERIENCE 14.7 /
AVERAGE 18.4 13 14.6 (YRS)
DURATION -
13,4 /
WEEKS 28.5 14.4 ONGOING ITEMS 21/
IDENTIFIED 1
ONGOING2
- SCOPE EXTENDED TO 3 ADDITIONAL SYSTEMS
- INCLUDES EPSL SYSTEM
RESPONSIBILITIES Design Enaineering Lead responsibility for annual audit planning.
Quality Assurance A certified Lead Auditor supplied by the QA Audit Division responsible for organizing, directing, conducting, reporting, and evaluating findings/corrective action.
RESPONSIBILITIES (cont.)
Team Members Shall have the needed expertise and experience level and be able to identify with and be sensitive to an audit of this nature.
Duties of members include:
- Conducting audit
- Developing guidance data
- Reporting findings
- Preparing for the daily caucus with team members
- Providing narrative summaries of areas audited
RESPONSIBILITIES (cont.)
Audited Departments Responsible for assuring cooperation with the audit team during the course of the audit and response to the audit findings.
AUDIT PROCESS General Instructions
- Look at everything and/or anything.
- Go beyond mere review of documents and interview responsible personnel to assess the general level of understanding.
- Look at safety and reliability as well as regulatory compliance.
- Spend time on weaknesses not strengths.
AUDIT PROCESS (cont.)
Design Become familiar with related design functions and evaluate design and documentation against applicable standards.
AUDIT PROCESS (cont.)
Routine Operating. Surveillance and Maintenance Activities
- Evaluate in light of design
- Consider adequacy of testing to demonstrate operational readiness, including:
- Acceptance criteria
- Operability decisions
- Procedure history packages
- Observation in the field
AUDIT PROCESS (cont.)
Repair-Maintenance Activities Nuclear Modifications (NSM)
Temporary Modifications Operating Procedures Review and assess the adequacy of procedures related to operation in normal and emergency modes.
AUDIT PROCESS (cont.)
Walkdowns Perform walkdowns to assess as-built status relative to design documentation and to assess system, component, or structure condition and general plant condition.
Auxiliary Systems Evaluate the contribution to operational readiness of the audited system by auxiliary systems.
AUDIT PROCESS (cont.)
Qualifications Review the qualifications of workers.
Training Assess the adequacy of training programs.
Quality Assurance Assess the adequacy and appropriateness of QC inspection and the depth and completeness of QA surveillance and programmatic audits.
REPORTING Copies of the report shall be distributed to appropriate management and the Nuclear Safety Review Board.
SITA REPORT AND FOLLOW UP ACTIVITIES REPORT LISTS FINDINGS IN ORDER OF IMPORTANCE FOR OPERABILITY A TEAM MEMBER IS ASSIGNED AS LEAD FOR EACH ITEM TEAM REVIEWS AND DETERMINES ACCEPTABILITY OF RESPONSES OA FOLLOWS UP ONCE RESPONSE HAS BEEN ACCEPTED