Forwards Insp Repts 50-269/91-05,50-270/91-05 & 50-287/91-05 on 910304-08.One non-cited Violation Noted
ML15224A770
Person / Time
Site: Oconee  
Issue date: 04/08/1991
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tuckman M
DUKE POWER CO.
Shared Package
ML15224A771 List:
References
NUDOCS 9104240018
Download: ML15224A770 (3)


See also: IR 05000269/1991005

Text

April 8, 1991

Docket Nos. 50-269, 50-270, 50-287

License Nos. DPR-38, DPR-47, DPR-55

Duke Power Company

ATTN: Mr. M. S. Tuckman, Vice Pres.ident

Nuclear Operations

P. 0. Box 1007

Charlotte, NC

28201-1007

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-269/91-05, 50-270/91-05 AND

50-287/91-05

This refers to the inspection conducted by J. L. Coley of this office on

March 4-8, 1991.

The inspection included a review of activities authorized for

your Oconee facility. At the conclusion of the inspection, the findings were

discussed with those members of your staff identified in the report.

Areas examined during the inspection are identified in the report

Within

these areas,.the inispection consisted of selective examinations of procedures

and representative records,

interviews with personnel,

and observation of

activities in progress.

The enclosed Inspection Report identifies activities that appeared to violate

NRC requirements that are not cited; therefore, a response is not required.

Although Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this Notice, a written statement of explanation, we note that

this violation had been corrected and those actions were reviewed during this

inspection. Therefore, no response with respect to this matter is required.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original signed by

Caudle A. Julian

Caudle A. Julian, Chief

Engineering Branch

Division of Reactor Safety

Enclosure:

(See page 2)

9104240018 910408

0DR

ADOCK O0

R69

Duke Power Company.

2

April 8, 1991

Enclosure:

NRC Inspection Report.

cc w/encl:

H. B. Barron

Station Manager

Oconee Nuclear Station

P. 0. Box 1439

Seneca, SC

29679

A. V. Carr, Esq

Duke Power Company

422.South Church Street

Charlotte, NC 28242-0001

County Supervisor of Oconee County

Walhalla, SC 29621

Robert B. Borsum

Babcock and Wilcox Company

Nuclear Power Generation Division

Suite 525, 1700 Rockville Pike

Rockville, MD 20852

J. Michael McGarry, III, Esq.

Bishop, Cook, Purcell and Reynolds

1400 L Street, NW

Washington, D. C. 20005

Office of Intergovernmental Relations

116 West Jones Street

Raleigh, NC 27603

Heyward G. Shealy, Chief

Bureau of Radiological Health

South Carolina Department of Health

and Environmental Control

2600 Bull Street

Columbia, SC 29201

Manager, LIS

NUS Corporation

2650 McCormick Drive

Clearwater, FL 34619-1035

Stephen Benesole

Duke Power Company

P. 0. Box 1007

Charlotte, NC 28201-1007

(cc w/encl cont'd -

See page 3)

Duke Power Company

3

April 8, 1991

(cc w/encl cont'd)

R. L. Gill

Nuclear Production Department

Duke Power Company

P. 0. Box 1007

Charlotte, NC 28201-1007

Karen E. Long

Assistant Attorney General

N. C. Department of Justice

P. 0. Box 629

Raleigh, NC 27602

H. B. Tucker

Senior Vice President-Nuclear

Duke Power Company

P. 0. Box 1007

Charlotte, NC 28201-1007

bcc w/encl:

L. Wiens, NRR

W. Miller, RII

eM.

B. Shymlock, RH

A. R. Herdt, RH

1ocument Control Desk

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Route 2, Box 610

Seneca, SC 29678

RII:DRS

RII:DRS

S

RII:

JColey:tj

RChou

J ake

ABelisle

03/ 8/91

03/4/91

9-/91

03/C)/91