Notice of Availability of the Final Supplemental Environmental Impact Statement for Braidwood Station, Units 1 and 2
ML15223B110
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/16/2015
From: David Wrona
NRC/NRR/DLR/RERGUB
To: Barrett J, Bender J, Blackhawk J, Cadue S, Frank H, Froman J, Greendeer J, Lanford F, Lankford D, Meshigaud K, Ortiz S, Robidoux B, Salazar G, Thurman G
Citizen Potawatomi Nation, Shawnee, OK, Forest County Potawatomi Tribal Community, Hannahville Indian Community, Ho-Chunk Nation of Wisconsin, Kickapoo Tribe in Kansas, Kickapoo Tribe of Oklahoma, Miami Tribe of Oklahoma, Peoria Tribe of Indians of Oklahoma, Pokagon Band of Potawatomi Indians, Prairie Band of Potawatomi Indians, Sac & Fox Nation of Missouri in Kansas & Nebraska, Sac & Fox Tribe of the Mississippi in Iowa, Sac and Fox Nation, Winnebago Tribe of Nebraska
Wrona D, 415-5003
References
Download: ML15223B110 (16)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16, 2015 Mr. Jon Greendeer, President Ho-Chunk Nation W9814 Airport Road P.O. Box 667 Black River Falls, WI 54615

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR BRAIDWOOD STATION, UNITS 1 AND 2

Dear President Greendeer:

Please find enclosed a copy of the final NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 55, Braidwood Station, Units 1 and 2. The final Supplemental Environmental Impact Statement (SEIS) is being issued as part of the U.S. Nuclear Regulatory Commissions (NRCs) process to decide whether to issue renewed operating licenses to Exelon Generation Company, LLC for Braidwood Station, Units 1 and 2 (Braidwood). In the final SEIS, the NRC staff determined that the adverse environmental impacts of license renewal for Braidwood are not so great that preserving the option of license renewal for energy planning decision-makers would be unreasonable. In the context of the National Historic Preservation Act of 1966, NRC staff determined that no historic properties will be affected by the proposed action (license renewal). The final Environmental Impact Statement will accompany the final Safety Evaluation Report to be considered in the Commissions license renewal decision making process.

If you have any questions regarding this matter, please contact Russell Chazell, Environmental Scientist, at 301-415-5003 or by e-mail at Russell.Chazell@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-457

Enclosure:

As stated cc w/encl:

Mr. William Quackenbush, Tribal Historic Preservation Officer Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16, 2015 Mr. Steve Cadue, Chairman Kickapoo Tribe of Indians of the Kickapoo Reservation in Kansas 1107 Goldfinch Road Horton, KS 66439

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR BRAIDWOOD STATION, UNITS 1 AND 2

Dear Chairman Cadue:

Please find enclosed a copy of the final NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 55, Braidwood Station, Units 1 and 2. The final Supplemental Environmental Impact Statement (SEIS) is being issued as part of the U.S. Nuclear Regulatory Commissions (NRCs) process to decide whether to issue renewed operating licenses to Exelon Generation Company, LLC for Braidwood Station, Units 1 and 2 (Braidwood). In the final SEIS, the NRC staff determined that the adverse environmental impacts of license renewal for Braidwood are not so great that preserving the option of license renewal for energy planning decision-makers would be unreasonable. In the context of the National Historic Preservation Act of 1966, NRC staff determined that no historic properties will be affected by the proposed action (license renewal). The final Environmental Impact Statement will accompany the final Safety Evaluation Report to be considered in the Commissions license renewal decision making process.

If you have any questions regarding this matter, please contact Russell Chazell, Environmental Scientist, at 301-415-5003 or by e-mail at Russell.Chazell@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-457

Enclosure:

As stated cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16, 2015 Mr. Gilbert Salazar, Chairman Kickapoo Tribe of Oklahoma 407 North Highway 102 P.O. Box 70 McCloud, OK 74851

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR BRAIDWOOD STATION, UNITS 1 AND 2

Dear Chairman Salazar:

Please find enclosed a copy of the final NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 55, Braidwood Station, Units 1 and 2. The final Supplemental Environmental Impact Statement (SEIS) is being issued as part of the U.S. Nuclear Regulatory Commissions (NRCs) process to decide whether to issue renewed operating licenses to Exelon Generation Company, LLC for Braidwood Station, Units 1 and 2 (Braidwood). In the final SEIS, the NRC staff determined that the adverse environmental impacts of license renewal for Braidwood are not so great that preserving the option of license renewal for energy planning decision-makers would be unreasonable. In the context of the National Historic Preservation Act of 1966, NRC staff determined that no historic properties will be affected by the proposed action (license renewal). The final Environmental Impact Statement will accompany the final Safety Evaluation Report to be considered in the Commissions license renewal decision making process.

If you have any questions regarding this matter, please contact Russell Chazell, Environmental Scientist, at 301-415-5003 or by e-mail at Russell.Chazell@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-457

Enclosure:

As stated cc w/encl: Mr. Kent Collier, NAGPRA Contact Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16, 2015 Mr. Douglas G. Lankford, Chief Miami Tribe of Oklahoma P.O. Box 1326 Miami, OK 74355

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR BRAIDWOOD STATION, UNITS 1 AND 2

Dear Chief Lankford:

Please find enclosed a copy of the final NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 55, Braidwood Station, Units 1 and 2. The final Supplemental Environmental Impact Statement (SEIS) is being issued as part of the U.S. Nuclear Regulatory Commissions (NRCs) process to decide whether to issue renewed operating licenses to Exelon Generation Company, LLC for Braidwood Station, Units 1 and 2 (Braidwood). In the final SEIS, the NRC staff determined that the adverse environmental impacts of license renewal for Braidwood are not so great that preserving the option of license renewal for energy planning decision-makers would be unreasonable. In the context of the National Historic Preservation Act of 1966, NRC staff determined that no historic properties will be affected by the proposed action (license renewal). The final Environmental Impact Statement will accompany the final Safety Evaluation Report to be considered in the Commissions license renewal decision making process.

If you have any questions regarding this matter, please contact Russell Chazell, Environmental Scientist, at 301-415-5003 or by e-mail at Russell.Chazell@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-457

Enclosure:

As stated cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16, 2015 Mr. John P. Froman, Chief Peoria Tribe of Indians of Oklahoma 118 S. Eight Tribes Trail P.O. Box 1527 Miami, OK 74355

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR BRAIDWOOD STATION, UNITS 1 AND 2

Dear Chief Froman:

Please find enclosed a copy of the final NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 55, Braidwood Station, Units 1 and 2. The final Supplemental Environmental Impact Statement (SEIS) is being issued as part of the U.S. Nuclear Regulatory Commissions (NRCs) process to decide whether to issue renewed operating licenses to Exelon Generation Company, LLC for Braidwood Station, Units 1 and 2 (Braidwood). In the final SEIS, the NRC staff determined that the adverse environmental impacts of license renewal for Braidwood are not so great that preserving the option of license renewal for energy planning decision-makers would be unreasonable. In the context of the National Historic Preservation Act of 1966, NRC staff determined that no historic properties will be affected by the proposed action (license renewal). The final Environmental Impact Statement will accompany the final Safety Evaluation Report to be considered in the Commissions license renewal decision making process.

If you have any questions regarding this matter, please contact Russell Chazell, Environmental Scientist, at 301-415-5003 or by e-mail at Russell.Chazell@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-457

Enclosure:

As stated cc: w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16, 2015 Mr. John A. Barrett, Jr., Chairman Citizen Potawatomi Nation 1601 S. Gordon Cooper Drive Shawnee, OK 74801

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR BRAIDWOOD STATION, UNITS 1 AND 2

Dear Chairman Barrett:

Please find enclosed a copy of the final NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 55, Braidwood Station, Units 1 and 2. The final Supplemental Environmental Impact Statement (SEIS) is being issued as part of the U.S. Nuclear Regulatory Commissions (NRCs) process to decide whether to issue renewed operating licenses to Exelon Generation Company, LLC for Braidwood Station, Units 1 and 2 (Braidwood). In the final SEIS, the NRC staff determined that the adverse environmental impacts of license renewal for Braidwood are not so great that preserving the option of license renewal for energy planning decision-makers would be unreasonable. In the context of the National Historic Preservation Act of 1966, NRC staff determined that no historic properties will be affected by the proposed action (license renewal). The final Environmental Impact Statement will accompany the final Safety Evaluation Report to be considered in the Commissions license renewal decision making process.

If you have any questions regarding this matter, please contact Russell Chazell, Environmental Scientist, at 301-415-5003 or by e-mail at Russell.Chazell@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-457

Enclosure:

As stated cc w/encl:

Dr. Kelli Mosteller, Tribal Historic Preservation Officer Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16, 2015 Ms. Judith Bender, Chairperson Sac and Fox Tribe of the Mississippi in Iowa/Meskwaki 349 Meskwaki Road Tama, IA 52339

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR BRAIDWOOD STATION, UNITS 1 AND 2

Dear Chairperson Bender:

Please find enclosed a copy of the final NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 55, Braidwood Station, Units 1 and 2. The final Supplemental Environmental Impact Statement (SEIS) is being issued as part of the U.S. Nuclear Regulatory Commissions (NRCs) process to decide whether to issue renewed operating licenses to Exelon Generation Company, LLC for Braidwood Station, Units 1 and 2 (Braidwood). In the final SEIS, the NRC staff determined that the adverse environmental impacts of license renewal for Braidwood are not so great that preserving the option of license renewal for energy planning decision-makers would be unreasonable. In the context of the National Historic Preservation Act of 1966, NRC staff determined that no historic properties will be affected by the proposed action (license renewal). The final Environmental Impact Statement will accompany the final Safety Evaluation Report to be considered in the Commissions license renewal decision making process.

If you have any questions regarding this matter, please contact Russell Chazell, Environmental Scientist, at 301-415-5003 or by e-mail at Russell.Chazell@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-457

Enclosure:

As stated cc w/encl: Mr. Johnathan L. Buffalo, Historic Preservation Director Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16, 2015 Ms. Brigette Robidoux, Chairperson Sac and Fox Nation of Missouri in Kansas and Nebraska 305 N. Main Street Reserve, KS 66434

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR BRAIDWOOD STATION, UNITS 1 AND 2

Dear Chairperson Robidoux:

Please find enclosed a copy of the final NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 55, Braidwood Station, Units 1 and 2. The final Supplemental Environmental Impact Statement (SEIS) is being issued as part of the U.S. Nuclear Regulatory Commissions (NRCs) process to decide whether to issue renewed operating licenses to Exelon Generation Company, LLC for Braidwood Station, Units 1 and 2 (Braidwood). In the final SEIS, the NRC staff determined that the adverse environmental impacts of license renewal for Braidwood are not so great that preserving the option of license renewal for energy planning decision-makers would be unreasonable. In the context of the National Historic Preservation Act of 1966, NRC staff determined that no historic properties will be affected by the proposed action (license renewal). The final Environmental Impact Statement will accompany the final Safety Evaluation Report to be considered in the Commissions license renewal decision making process.

If you have any questions regarding this matter, please contact Russell Chazell, Environmental Scientist, at 301-415-5003 or by e-mail at Russell.Chazell@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-457

Enclosure:

As stated cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16, 2015 Mr. George Thurman, Principal Chief Sac and Fox Nation Administration Building 920883 S. Highway 99, Bldg A Stroud, OK 74079

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR BRAIDWOOD STATION, UNITS 1 AND 2

Dear Principal Chief Thurman:

Please find enclosed a copy of the final NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 55, Braidwood Station, Units 1 and 2. The final Supplemental Environmental Impact Statement (SEIS) is being issued as part of the U.S. Nuclear Regulatory Commissions (NRCs) process to decide whether to issue renewed operating licenses to Exelon Generation Company, LLC for Braidwood Station, Units 1 and 2 (Braidwood). In the final SEIS, the NRC staff determined that the adverse environmental impacts of license renewal for Braidwood are not so great that preserving the option of license renewal for energy planning decision-makers would be unreasonable. In the context of the National Historic Preservation Act of 1966, NRC staff determined that no historic properties will be affected by the proposed action (license renewal). The final Environmental Impact Statement will accompany the final Safety Evaluation Report to be considered in the Commissions license renewal decision making process.

If you have any questions regarding this matter, please contact Russell Chazell, Environmental Scientist, at 301-415-5003 or by e-mail at Russell.Chazell@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-457

Enclosure:

As stated cc w/encl:

Ms. Sandra Kaye Massey, NAGPRA Coordinator Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16, 2015 Mr. John P. Warren, Chairperson Pokagon Band of Potawatomi 58620 Sink Road P.O. Box 180 Dowagiac, MI 49047

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR BRAIDWOOD STATION, UNITS 1 AND 2

Dear Chairperson Warren:

Please find enclosed a copy of the final NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 55, Braidwood Station, Units 1 and 2. The final Supplemental Environmental Impact Statement (SEIS) is being issued as part of the U.S. Nuclear Regulatory Commissions (NRCs) process to decide whether to issue renewed operating licenses to Exelon Generation Company, LLC for Braidwood Station, Units 1 and 2 (Braidwood). In the final SEIS, the NRC staff determined that the adverse environmental impacts of license renewal for Braidwood are not so great that preserving the option of license renewal for energy planning decision-makers would be unreasonable. In the context of the National Historic Preservation Act of 1966, NRC staff determined that no historic properties will be affected by the proposed action (license renewal). The final Environmental Impact Statement will accompany the final Safety Evaluation Report to be considered in the Commissions license renewal decision making process.

If you have any questions regarding this matter, please contact Russell Chazell, Environmental Scientist, at 301-415-5003 or by e-mail at Russell.Chazell@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-457

Enclosure:

As stated cc w/encl:

Mr. Marcus A. Winchester, Tribal Historic Preservation Officer Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16, 2015 Mr. Harold Gus Frank, Chairman Forest County Potawatomi 5416 Everybodys Road P.O. Box 340 Crandon, WI 54520

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR BRAIDWOOD STATION, UNITS 1 AND 2

Dear Chairman Frank:

Please find enclosed a copy of the final NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 55, Braidwood Station, Units 1 and 2. The final Supplemental Environmental Impact Statement (SEIS) is being issued as part of the U.S. Nuclear Regulatory Commissions (NRCs) process to decide whether to issue renewed operating licenses to Exelon Generation Company, LLC for Braidwood Station, Units 1 and 2 (Braidwood). In the final SEIS, the NRC staff determined that the adverse environmental impacts of license renewal for Braidwood are not so great that preserving the option of license renewal for energy planning decision-makers would be unreasonable. In the context of the National Historic Preservation Act of 1966, NRC staff determined that no historic properties will be affected by the proposed action (license renewal). The final Environmental Impact Statement will accompany the final Safety Evaluation Report to be considered in the Commissions license renewal decision making process.

If you have any questions regarding this matter, please contact Russell Chazell, Environmental Scientist, at 301-415-5003 or by e-mail at Russell.Chazell@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-457

Enclosure:

As stated cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16, 2015 Mr. Kenneth Meshigaud, Tribal Chairperson Hannahville Indian Community N14911 Hannahville B1 Road Wilson, MI 49896-9728

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR BRAIDWOOD STATION, UNITS 1 AND 2

Dear Chairperson Meshigaud:

Please find enclosed a copy of the final NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 55, Braidwood Station, Units 1 and 2. The final Supplemental Environmental Impact Statement (SEIS) is being issued as part of the U.S. Nuclear Regulatory Commissions (NRCs) process to decide whether to issue renewed operating licenses to Exelon Generation Company, LLC for Braidwood Station, Units 1 and 2 (Braidwood). In the final SEIS, the NRC staff determined that the adverse environmental impacts of license renewal for Braidwood are not so great that preserving the option of license renewal for energy planning decision-makers would be unreasonable. In the context of the National Historic Preservation Act of 1966, NRC staff determined that no historic properties will be affected by the proposed action (license renewal). The final Environmental Impact Statement will accompany the final Safety Evaluation Report to be considered in the Commissions license renewal decision making process.

If you have any questions regarding this matter, please contact Russell Chazell, Environmental Scientist, at 301-415-5003 or by e-mail at Russell.Chazell@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-457

Enclosure:

As stated cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16, 2015 Mr. Steve Ortiz, Chairman Prairie Band of Potawatomi Nation 16281 Q Road Mayetta, KS 66509

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR BRAIDWOOD STATION, UNITS 1 AND 2

Dear Chairman Ortiz:

Please find enclosed a copy of the final NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 55, Braidwood Station, Units 1 and 2. The final Supplemental Environmental Impact Statement (SEIS) is being issued as part of the U.S. Nuclear Regulatory Commissions (NRCs) process to decide whether to issue renewed operating licenses to Exelon Generation Company, LLC for Braidwood Station, Units 1 and 2 (Braidwood). In the final SEIS, the NRC staff determined that the adverse environmental impacts of license renewal for Braidwood are not so great that preserving the option of license renewal for energy planning decision-makers would be unreasonable. In the context of the National Historic Preservation Act of 1966, NRC staff determined that no historic properties will be affected by the proposed action (license renewal). The final Environmental Impact Statement will accompany the final Safety Evaluation Report to be considered in the Commissions license renewal decision making process.

If you have any questions regarding this matter, please contact Russell Chazell, Environmental Scientist, at 301-415-5003 or by e-mail at Russell.Chazell@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-457

Enclosure:

As stated cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16, 2015 Mr. John Blackhawk, Chairman Winnebago Tribe of Nebraska 100 Bluff Street P.O. Box 687 Winnebago, NE 68071

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR BRAIDWOOD STATION, UNITS 1 AND 2

Dear Chairman Blackhawk:

Please find enclosed a copy of the final NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 55, Braidwood Station, Units 1 and 2. The final Supplemental Environmental Impact Statement (SEIS) is being issued as part of the U.S. Nuclear Regulatory Commissions (NRCs) process to decide whether to issue renewed operating licenses to Exelon Generation Company, LLC for Braidwood Station, Units 1 and 2 (Braidwood). In the final SEIS, the NRC staff determined that the adverse environmental impacts of license renewal for Braidwood are not so great that preserving the option of license renewal for energy planning decision-makers would be unreasonable. In the context of the National Historic Preservation Act of 1966, NRC staff determined that no historic properties will be affected by the proposed action (license renewal). The final Environmental Impact Statement will accompany the final Safety Evaluation Report to be considered in the Commissions license renewal decision making process.

If you have any questions regarding this matter, please contact Russell Chazell, Environmental Scientist, at 301-415-5003 or by e-mail at Russell.Chazell@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-457

Enclosure:

As stated cc w/encl: Listserv

ML15223B110

  • concurrence via email OFFICE LA:DLR DLR:RPB2:PM RERB:Technical Staff Member BC: DLR:RERB NAME IBetts RBaum RChazell DWrona DATE 8/11/15 8/24/15 11/10/15 11/16/15 Letter to J. Blackhawk, et al, from D. Wrona Identical letters have been sent to:

President Jon Greendeer, Ho-Chunk Nation Chairman Steve Cadue, Kickapoo Tribe of Indians of the Kickapoo Reservation in Kansas Chairman Gilbert Salazar, Kickapoo Tribe of Oklahoma Chief Douglas G. Lankford, Miami Tribe of Oklahoma Chief John P. Froman, Peoria Tribe of Indians of Oklahoma Chairman John A. Barrett, Jr., Citizen Potawatomi Nation Chairperson Judith Bender, Sac and Fox Tribe of the Mississippi in Iowa/Meskwaki Chairperson Brigette Robidoux, Sac and Fox Nation of Missouri in Kansas and Nebraska Principal Chief George Thurman, Sac and Fox Nation Chairperson John P. Warren, Pokagon Band of Potawatomi Chairman Harold Gus Frank, Forest County Potawatomi Tribal Chairperson Kenneth Meshigaud, Hannahville Indian Community, Band of Potawatomi Chairman Steve Ortiz, Prairie Band of Potawatomi Chairman John Blackhawk, Winnebago Tribe of Nebraska

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR BRAIDWOOD STATION, UNITS 1 AND 2 DISTRIBUTION:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsOpaMail RidsOgcMailCenter RBaum RChazell IBetts