APPENDIX A NOTICE OF VIOLATION Duke Power Company License Nos. DPR-38 DPR-47 DPR-55 Based -on the results of the NRC inspection conducted on July 26-28 and August 1-4, 1978, it appears that certain of your activities were not conducted in full compliance with NRC requirements as indicated below.
These items have been categorized as described in our correspondence to you dated December 31, 1974.
A.
10 CFR 20.201(b) requires that each licensee shall make or cause to be made such surveys as may be necessary for him to comply with the regulations in this part.
10 CFR 20.203(b) states that "each radiation area shall be conspicuously posted with a sign or signs having the radiation caution symbol and the words:
"CAUTION RADIA TION AREA".
Contrary to the above, the licensee had not performed the radiation surveys necessary to ensure that radiation areas in the Interim Radwaste Building were identified and properly posted. Radiation levels exceeding 5 mr/hr (9-25 mr/hr) were measured in three separate accessible areas of the building during a radiation survey performed on August 2, 1978, as requested by the inspector.
This is an infraction.
B.
Technical Specification 6.4.1 states, in part, that the station shall be operated and maintained in accordance with approved procedures.
Operating Procedure OP/O/A/1510/4, "Spent Fuel Shipping, NAC-1 Cask",
steps 6.7 and 6.8 require that, in preparing a loaded spent fuel cask for shipment, the trunnion tie-down nuts be torqued to 50 ft-lbs and the closure head impact limiter bolts be torqued to 60 ft-lbs.
Contrary to the above, Operating Procedure OP/O/A/1510/4, "Spent Fuel Shipping, NAC-1 Cask," was not followed on July 27, 1978, in that trunnion tie-down nuts and closure head impact limiter bolts, although tightened, were not torqued as specified prior to initialling the procedure steps as completed.
This is an infraction.