Forwards NRC 800207,14 & 22 Ltrs Re Energy Supply During Unit Shutdown & Order Modifying 800102 Show Cause Order, in Response to 800201 & 05 Request for NRC Decision
ML15219A033
Person / Time
Site: Oconee, Saint Lucie, Turkey Point, Crystal River  NextEra Energy icon.png
Issue date: 02/26/1980
From: Youngblood B
Office of Nuclear Reactor Regulation
To: Weiner R
ENERGY, DEPT. OF
Shared Package
ML15219A034 List:
References
NUDOCS 8003100180
Download: ML15219A033 (2)


Text

ncoming DISTRIBUTION:w/encls.

FE ET FILE-(ENVIRON)*

DPCleary fl~kUJU

~V~~fl.ITERA*.

SFeld NRC-PDR*(5)

Local-PDR*(5)

FEB 2NRR Rdg.

ET Rda.

CBAB Rdg.*

Docket Nos.: 270, 50-287 DEisenhut/TTelford 50- 302, 50-335.tenton/.ECase and 50-251 HBerkow/WRussel 1 RDeYoung/DMul 1 er DRoss Mr. Richard E. Weiner, Director.

RMat.tson Division of Power Supply and Reliab lity MGroff_(.NRR 3746 & 3738)

-conomic Regulatory Administration B.JYoungblood Department of Energy

MErnst 2000 M Street, N. W.

Qcone, - & 3-CBAB Washington, D; C. 20461 St..,

Luci e -CBAB Crystal River 3-CBAB

Dear Mr. 1einer:

Turkey Point 4-CBAB You requested notification of our decisions in your February 1, and February 5, 1930 letters to Harold Denton that summarized the views of the U. S. Department of Energy regarding the electric system reliability impacts that may be associated with the implementation of the 'Short-Term Lessons Learned" requirements in the Florida and Virginia-Carolinas (VACAR) subregions of the Southeastern Electric-iReliability Council (S., C)

Enclosed is Mr. DentonJs February 7, 1980 letter to Duke Power Company concerning Oconee. Nuclear Station, Units 2 and 3. The modified Order requires that Unit 2 be shutdown after Unit 1 reaches full power, that Unit 3 be shutdown on or before arch 15, 1930, and certain administrative controls.

The Order, may be modified if additional power reliability information.is.

provided and we conclude that severe reliability impacts extend beyond, March l.1 0

Enclosed, also, are two letters to the Florida Power and Light Company (FPL) and a letter to the Florida Power Corporation (FPC) Ppncerning the. Florida. subregion of SERC. Mr. Denton' s February 14, 1980 letter to FPL, i rcl udes the modified Order requiring that St. Lucie, Unit No.,2,,be utdown on or before, March 15,, 1980 for completion of "Category A" requirements.

Mr., Schwencer' s.

February 22, 1980 l etter to FPL amends the Turkey Point Plant, Unit 4, Technical Specifications to allow the unit to operate an additional. four equivalent full. power, weeks, but not later than April..1, 1980. Mr. Reid's February 15, 1980Oletter to, FPC. tndicates that Crystal River, Unit 3, wi ll be permitted to operate through, March 31,. 1980,. wi th certa in administrative controls.

These four-enclosures provide you the, present status of the actions associated with, Oconee, Units 2 and 3, Crystal River, Unit 3; St. L'ucicle, Unit 1; and Turkey Point Plant, Unit 4.

.t oURNA ME*-

s n

2o.m c

-1 0

MDC I

(9-76) NRCI( 0240 G OV I.N"T P RINYING.PCU IS-ag-OO 1 O~

Mr. Richard E. Weiner The assistance of the Division of Power Supply and Reliability with regard to the reliability and stability evaluations for Florida and VACAR is greatly aopreciated.

Sincerely, Oi ALSINDB B. J. Youngblood, Chief Cost-Benefit Analysis Branch Division of Site Safety and Environmental Analysis