ML15218A034

From kanterella
Jump to navigation Jump to search
Page 2 of Technical Specification 3.1.3 Updated - Amend. 278/258
ML15218A034
Person / Time
Site: McGuire, Mcguire  
Issue date: 07/22/2015
From:
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML15218A034 (4)


Text

Y Distribution:

1. AREVA NP
2.

BLUE DOT LIBRARY

3.

MCG DOC CNTRL MISC MAN

4.

MCG OPS PROCEDURE GP

5.

MCG PLANT ENG. LIBR.

6.

MCG RAD PROT

7.

OPS HUMAN PERFORMANCE -

8.

OPS TRNG MGR.

9.

QATS-

10. RESIDENT NRC INSPECT
11. SCIENTECH CLEARWTR, FL
12. SERV BLDG FILE ROOM -
13. U S NUC REG WASHINGTON, DC
14. USNRC
15. WESTINGHOUSE ELECTRJC CO LLC Duke Energy DOCUMENT TRANSMITTAL FORM Facility: MICGUIRE NUCLEAR STATION SUBJECT Tech Snec 3.1.3 - Pa 2 of TS 3,1,3 uo~dated - Amend, # 2781258 Date: Z221 Document Transmittal #: T R-NUC-MC-O00282

Purpose:

Issue Released By:

Duke Enery 13225 Haaers Ferry Road Document Manaaement MGO2M Huntersville, NC 28078 IMNSDCRMt(hduke-enerav.com Page 1 of 1

+

+Doc~ument ID

.. 1112131 41 51 61 7151911 10 11 "121 13 14 I15 IUCN-MC-MNS-TS-3.i.3-278-ISSUED FYIIE FYIIE FYIIE IFYIIE FYIIE FYIIE FYIIE FYIIE FYIIE FYIjE FYIIE FYIjE FYIIE FYIIE FYIIE Remarks: For simolicitv, you can distribute the entire TS 3.1.3 if wanted. It is a very small section.--- Reference TR-NUC-MC-000272---FOR DISTRIBUTION ENTITIES

MTC 3.1.3 3.1 REACTIVITY CONTROL SYSTEMS 3.1.3 Moderator Temperature Coefficient (MTC)

LCO 3.1.3 APPLICABILITY:

The MTC shall be maintained within the limits specified in the COLR. The maximum upper limit shall be that specified in Figure 3.1.3-1.

MODE 1 and MODE 2 with keff> 1.0 for the upper MTC limit, MODES 1, 2, and 3 for the lower MTC limit.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

MTC not within upper A.1 Establish administrative 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

limit, withdrawal limits for control banks to maintain MTC within limit.

B.

Required Action and B. 1 Be in MODE 2 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion keff < 1.0.

Time of Condition A not met.

C.

MTC not within lower C.1 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> limit.

McGuire Units 1 and 2 3.1.3-1 Mc~ure Uits and2 3..3-1Amendment Nos. 184/1 66

MTC 3.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.3.1 Verify MTC is within upper limit.

Once prior to entering MODE 1 after each refueling SR 3.1.3.2---------NOTES----------

1.

Not required to be performed until 7 effective full power days (EFPD) after reaching the equivalent of an equilibrium RTP all rods out (ARO) boron concentration of 300 ppm. Measurement of the MTC may be suspended provided the benchmark criteria specified in DPC-NE-1007-PA, and the Revised MTC Prediction specified in the COLR are satisfied.

2.

If the MTC is more negative than the 300 ppm Surveillance limit (not LCO limit) specified in the COLR, SR 3.1.3.2 shall be repeated once per 14 EFPD during the remainder of the fuel cycle.

3.

SR 3.1.3.2 need not be repeated if the MTC measured at the equivalent of equilibrium RTP-ARO boron concentration of < 60 ppm is less negative than the 60 ppm Surveillance limit specified in the COLR.

Once each cycle Verify MTC is within lower limit.

McGuire Units 1 and 2 3.1.3-2 Mc~ure nit 1 ad 23.13-2Amendment Nos. 278/258

MTC 3.1.3 0.9 Lu. 0.8

  • "0.7 o3 0.6 e- 0.5 tO0.4 L_.3

.4--

(_

0 0.3 0.1 0

10 20 30 40 50 60 70 80 90 100 PERCENT RTP Figure 3.1.3-1 (page 1 of 1)

Moderator Temperature Coefficient vs. Power Level McGuire Units 1 and 2 3.1.3-3 Mc~ure Uits and2 3..3-3Amendment Nos. 184/1 66