Submittal of Emergency Plan Implementing Procedure Revisions
ML15205A161
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 04/11/2014
From: Church C
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML15205A161 (3)


Text

Tennessee Valley Authority, P.O. Box 2000 Spring City, Tennessee 37381 April 11, 2014 10 CFR 50.4 10 CFR 50, Appendix E,Section V ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 & Unit 2 Facility Operating License No. NPF-90 NRC Docket Nos. 50-390, 50-391

Subject:

Emergency Plan Implementing Procedure Revision In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, the enclosure provides the revised Emergency Plan Implementing Procedures (EPIP) as listed below.

EPIP Revision Title Effective Date 2

033 Notification of Unusual Event 03/19/2014 3

039 Alert 03/19/2014 4

037 Site Area Emergency 03/19/2014 5

043 General Emergency 03/19/2014 The revisions added faxing instructions to the State of Tennessee Notification Form and Site Personnel Notification Form. These activities continue to comply with the requirements of 10 CFR 50.47(b) and 10 CFR 50 Appendix E.

In accordance with 10 CFR 50.4(b), copies of this submittal are being forwarded to the NRC Region II Administrator and the resident inspectors.

U.S. Nuclear Regulatory Commission April 11, 2014 Page 2 There are no regulatory commitments in this letter. Should you have questions regarding this submittal, please contact Thomas Detchemendy, Emergency Preparedness Manager, at (423) 365-3232.

Respectfully, Christopher R. Church Site Vice President Watts Bar Nuclear Plant

Enclosure:

Emergency Plan Implementing Procedure (EPIP) 2, Revision 33 Emergency Plan Implementing Procedure (EPIP) 3, Revision 39 Emergency Plan Implementing Procedure (EPIP) 4, Revision 37 Emergency Plan Implementing Procedure (EPIP) 5, Revision 43 cc (Enclosure):

NRR Project Manager - Watts Bar Nuclear Plant Unit 1 NRR Project Manager - Watts Bar Nuclear Plant Unit 2 NRC Regional Administrator - Region II NRC Senior Resident Inspector - Watts Bar Nuclear Plant Unit 1 NRC Senior Resident Inspector - Watts Bar Nuclear Plant Unit 2

U.S. Nuclear Regulatory Commission April 11, 2014 Page 3 GA:BMD bcc (Enclosure):

EDMS bcc (w/o Enclosure):

G. Arent T. F. Detchemendy S. M. Douglas W. H. Lee G. W. Mauldin J. W. Shea M. D. Skaggs NSRB Support (T. J. Bradshaw)