ML15205A136

From kanterella
Jump to navigation Jump to search
Submittal of Revision 41 to Emergency Plan Implementing Procedure EPIP 1, Emergency Plan Classification Logic
ML15205A136
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 06/23/2014
From: Hruby R
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML15205A136 (2)


Text

Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 June 23, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

Subject:

Watts Bar Nuclear Plant Unit 2 NRC Docket No. 50-391 Emergency Plan Implementing Procedure Proposed Revision ln accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, the enclosure provides the proposed Emergency Plan lmplementing Procedure (EPIP) listed below.

EPIP 1

Revision Title 041x Emergency Plan Classification Logic 10 cFR 50 4 10 CFR 50, Appendix E, Section V 1 0 cFR 50 47 (b)

Effective Date N/A This revision shows how this EPIP will be changed to support dual unit operation. The "x" after the revision number denotes that it is not approved for use at this time and is subject to NRC review and approval as part of the Watts Bar Unit 2 licensing process.

There are no regulatory commitments in this letter. Please direct all questions concerning this matter to Thomas Detchemendy, EP Manager, at (423) 365-3232.

Respectfully, zoile" Raymond A. Hruby General Manager Watts Bar Nuclear U nat 2

Enclosure:

Emergency Plan lmplementing Procedure (EPIP)'t Revision 041x

U.S. Nuclear Regulatory Commission June 23,2014 Page 2 cc (Enclosure): NRC RegionalAdministrator - Region !l NRC Senior Resident Inspector - Watts Bar Nuclear Plant Unit 1 NRC Senior Resident lnspector - Watts Bar Nuclear Plant Unit 2 NRC Project Manager - Watts Bar Nuclear Plant Unit 1 NRC Project Manager - Watts Bar Nuclear Plant Unit 2