ISFSI - Submittal of Updated Final Safety Analysis Report, Revision 24
ML15195A330
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/30/2015
From: Batson S
Duke Energy Carolinas
To:
Document Control Desk, NRC/NMSS/SFST
Shared Package
ML15195A328 List:
References
ONS-2015-073
Download: ML15195A330 (12)


Text

"

DUKE

ENERGY, ONS-2015-073 June 30, 2015 Scott L. Batson Vice President Oconee Nuclear Station Duke Energy ONOlVP 17800 Rochester Hwy Seneca, SC 29672 o: 864.873.3274 1 864.873.4208 Scott.Batson@duke-energy.com ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2746 10 CFR 72.4 10 CFR 72.48 10 CFR 72.70

Subject:

Duke Energy Carolinas, (LLC) (Duke Energy)

Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 72-4, 50-269, 50-270, 50-287 Independent Spent Fuel Storage Installation Updated Final Safety Analysis Report, Revision 24 Pursuant to 10 CFR 72.70(c), and in accordance with 10 CFR 72.4, Duke Energy hereby submits the Oconee Nuclear Station Independent Spent Fuel Storage Installation (ISFSI)

Updated Final Safety Analysis Report (UFSAR), Revision 24. The effective date of the revision is December 31, 2014, as indicated at the bottom of each page. There were no changes made to the Oconee ISFSI UFSAR in Rev. 24.

The Oconee ISFSI UFSAR, Revision 24, is enclosed on one compact disk (CD). The contents are in Adobe Acrobat Portable Document Format (pdf). As required by NRC guidance for electronic submissions, Attachment 1 provides a listing of the document components that comprise the enclosed CD. Attachment 2 provides the List of Effective Pages (LOEP) for Tables and Figures. Attachment 3 provides insertion instructions for those receiving hardcopy distribution. provides the report of changes, tests, and experiments performed pursuant to 10 CFR 72.48.

This submittal document contains no new or revised regulatory commitments. If you have any questions regarding this submittal, please contact Susan Perry at (864) 873-4370.

I declare under penalty of perjury that the foregoing is true and correct. Executed on June 30, 2015.

Sincerely, Scott L. Batson Vice President Oconee Nuclear Station f4A&3f www.duke-energy.com

ONS-2015-073 Document Control Desk June 30, 2015 Page 2 Attachments:

1. Document Components on CD
2. List of Effective Pages (LOEP) for Tables and Figures
3. Insertion Instructions (for hardcopy distribution only)
4. 10 CFR 72.48 Report

Enclosure:

CD: Oconee Nuclear Station Independent Spent Fuel Storage Facility, 2014 Update - Rev 24 cc:

Mr. Victor McCree, NRC Region II Administrator (CD)

U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. James R. Hall, Project Manager (CD)

U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop O-8G9A Rockville, MD 20852 Mr. Eddy Crowe (hardcopy)

Senior Resident Inspector Oconee Nuclear Station

ONS-2015-073 Document Control Desk June 30, 2015 Document Components on CD (1 page)

ONS-2015-073 Document Control Desk June 30, 2015, Page 1 Filename 001 ONS ISFSI Rev 24 Title Page 001 ONS ISFSI Rev 24 Text 002 ONS ISFSI Rev 24 Tables 003 ONS ISFSI Rev 24 Figures File Size 52 KB 1,505 KB 1,282 KB 26,181 KB

ONS-2015-073 Document Control Desk June 30, 2015 List of Effective Pages (LOEP) for Tables and Figures (3 pages attached)

ONS-2015-073 Document Control Desk June 30, 2015, Page 1 OCONEE ISFSI UFSAR - 2014 UPDATE List of Effective Pages (LOEP) for Table and Figures The purpose of this list is to assure that the pages in the Tables and Figures section of your manual match the most recent issue, as well as to show a full accounting of all tables and figures, including those that have been deleted. The earliest effective date, 12/31/07, was used when all tables and figures were re-issued.

Effective Table Table Title Date No.

12/31/07 A-1 Design Parameters for the Oconee ISFSI 12/31/07 A-2 Summary of ISFSI Fuel Handling Operations 12/31/07 A-3 Primary Design Parameters for the ISFSI Transport Systems 12/31/07 A-4 Major Systems, Subsystems, and Components of the Oconee ISFSI 12/31/07 A-5 Population Growth in Oconee, Pickens, and Anderson Counties, South Carolina (1980-2005) 12/31/07 A-6 Population Projections for Oconee, Pickens, and Anderson Counties, South Carolina (2010-2050) 12/31/07 A-7 Joint Frequencies of Wind Direction and Speed by Stability Class 12/31/07 A-8 Soil Permeability Test Results 12/31/07 A-9 Significant Earthquakes in the Southeast United States (Intensity V or Greater) 12/31/07 A-10 Physical Characteristics of PWR Fuel Assemblies Based on Nominal Design 12/31/07 A-11 Transfer Cask Stress Analysis for Tornado Effects 12/31/07 A-12 Oconee ISFSI Major Components and Functions 12/31/07 A-13 Oconee ISFSI Radioactive Material Confinement Barriers 12/31/07 A-14 Oconee ISFSI Major Components and Design Requirements 12/31/07 A-1 5 ONS ISFSI Project Transfer Trailer Design Parameters 12/31/07 A-16 Oconee ISFSI Major Components and Classification 12/31/07 A-17 Gamma Energy Spectrum 12/31/07 A-18 Shielding Analysis Results 12/31/07 A-19 Summary of Estimated On-site Doses Resulting from ISFSI Operations (Per DSC Transfer to HSM) 12/31/07 A-20 Dose Estimate for Construction of Additional Horizontal Storage Modules Based on Labor Estimates for 2 X 10 Array 12/31/07 A-21 Neutron and Gamma Energy Spectrum 12/31/07 A-22 Comparison of Total Dose Rates for HSM With and Without Air Outlet Shielding Blocks 12/31/07 A-23 Cask Drop Target Parameters Effective Date: 12/31/14

ONS-201 5-073 Document Control Desk June 30, 2015, Page 2 Effective Figure Figure Title Date No.

12/31/07 B-1 Location of ISFSI 12/31/07 B-2 General Location 12/31/07 B-3 Site Plan 12/31/07 B-4 ISFSI Layout 12/31/07 B-5 Topography Within 5 Miles 12/31/07 B-6 Relative Positions of Meteorological Instruments 12/31/07 B-7 Relative Elevations of Meteorological Instruments 12/31/07 B-8 Areal Groundwater Survey 12/31/07 B-9 Groundwater Survey at Station Site 12/31/07 B-10 Well Permeameter Test Apparatus 12/31/07 B-11 Formulae for Determining Permeability 12/31/07 B-12 General Site Area 12/31/07 B-13 Site Boring Plan 12/31/07 B-14 Core Boring Record 12/31/07 B-15 Core Boring Record 12/31/07 B-16 Core Boring Record 12/31/07 B-17 Core Boring Record 12/31/07 B-18 Core Boring Record 12/31/07 B-19 Core Boring Record 12/31/07 B-20 Core Boring Record 12/31/07 B-21 Core Boring Record 12/31/07 B-22 Core Boring Record 12/31/07 B-23 Core Boring Record 12/31/07 B-24 Core Boring Record 12/31/07 B-25 Core Boring Record 12/31/07 B-26 Core Boring Record 12/31/07 B-27 Core Boring Record 12/31/07 B-28 ISFSI Foundation Profile 12/31/07 B-29 Site Layout and Route 12/31/07 B-30 Site Plan Effective Date: 12/31/14

ONS-2015-073 Document Control Desk June 30, 2015, Page 3 Effective Figure Figure Title Date No.

12/31/07 B-31 Transfer Cask Lifting Yoke 12/31/07 B-32 Transfer Cask Lift Extension 12/31/07 B-33 Spent Fuel Pool Area 12/31/07 B-34 Spent Fuel Pool Area 12/31/07 B-35 Spent Fuel Pool Area 12/31/07 B-36 NUHOMS5 System Loading Operations Flowchart 12/31/07 B-37 NUHOMS System Loading Operations Flowchart 12/31/07 B-38 NUHOMS System Loading Operations Flowchart 12/31/07 B-39 NUHOMS System Loading Operations Flowchart 12/31/07 B-40 NUHOMS System Loading Operations Flowchart 12/31/07 B-41 NUHOMS System Loading Operations Flowchart 12/31/07 B-42 Location of Dose Rates 12/31/07 B-43 Dose Rate Versus Distance From Surface of HSM 12/31/07 B-44 Dose From Filled HSM Array 12/31/07 B-45 Dose From Filled HSM Array 12/31/07 B-46 Radiation Zone Map of Modules Surface Dose Rates 12/31/07 B-47 Deleted Per 1991 Update 12/31/07 B-48 Fuel Assembly Burnup Requirements Effective Date: 12/31/14

ONS-2015-073 Document Control Desk June 30, 2015 Insertion Instructions (for hardcopy distribution only)

(1 page)

ONS-2015-073 Document Control Desk June 30, 2015, Page 1 Insertion Instructions (for hardcopy distribution only)

1. Replace List of Effective Pages (LOEP) for Tables and Figures with the 2014 LOEP Update.
2. Replace entire text portions with the updated text portion (including the List of Abbreviations, Table of Contents, List of Tables, and List of Figures.)
3. Update Tables and Figures according to the following instructions.

NOTE: There were no Tables or Figures updated during this revision.

ONS-2015-073 Document Control Desk June 30, 2015 10 CFR 72.48 Report (1 page)

ONS-2015-073 Document Control Desk June 30, 2015, Page 1 Oconee Nuclear Station hereby informs the Nuclear Regulatory Commission that no changes, tests or experiments were made under the provisions of 10 CFR 72.48 between January 1, 2014 and December 31, 2014.