4-27-15 MURR-GA Public Meeting Summary
ML15187A137
Person / Time
Site: University of Missouri-Columbia
Issue date: 07/09/2015
From: Steven Lynch
Research and Test Reactors Branch B
To:
Univ of Missouri
Lynch S, NRR/DPR, 301-415-1524
Shared Package
ML15187A033 List:
References
Download: ML15187A137 (4)


Text

July 9, 2015 LICENSEE:

University of Missouri Research Reactor Center

SUBJECT:

SUMMARY

OF APRIL 27, 2015, MEETING WITH UNIVERSITY OF MISSOURI RESEARCH REACTOR CENTER On April 27, 2015, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of University of Missouri Research Reactor Center (MURR), General Atomics (GA), and Nordion at NRC Headquarters, Three White Flint North, 11601 Landsdown Street, North Bethesda, Maryland. The purpose of this meeting was to discuss the licensing and technical aspects associated with a proposed molybdenum-99 (Mo-99) production project. A portion of this meeting was closed to the public to discuss proprietary information related to the specifics of design and operation of the proposed project.

The meeting notice and agenda, dated April 15, 2015, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML15105A365. A list of attendees at this meeting is provided in Enclosure 1 to this meeting summary.

The NRC staff opened the meeting by emphasizing the importance of communication between The University of Missouri Research Reactor (MURR) and the NRC to ensure the allocation and availability of resources to conduct efficient licensing reviews. The MURR Center began its presentation with a discussion of research and education activities at the MURR reactor, focusing on those endeavors related to isotope research and production. Key reactor design and operating parameters were also discussed, including recent updates to the MURR reactor.

The introductory presentation concluded with a high-level discussion of the Mo-99 production project proposed by MURR, GA, and Nordion. This discussion covered target irradiation and processing, including an overview of the selective gas extraction process. The selective gas extraction process will remove Mo-99 from the target within the reactor for hot cell processing.

Each target is expected to remain in the reflector region of the reactor for approximately one year. Further details on this discussion are included in the presentation slides in Enclosure 2 to this meeting summary.

During the closed portion of the meeting, GA went into proprietary-level detail related to the specific design and operation of its proposed Mo-99 production process. Topics at this meeting included the selective gas extraction process; top-level target and hot cell design; performance and safety requirements; and target cooling system. Discussions during this meeting focused on unique operating characteristics of the proposed target assembly and gas extraction process.

The concluding open session of the meeting focused on proposed licensing approaches for the target assembly and hot cells. The goals of this portion of the meeting were to identify the most appropriate licensing approach; understand NRC licensing requirements; emphasize communication among the NRC, MURR, GA, and Nordion; and understand the NRCs timelines for completing licensing reviews. Four licensing approaches were examined by MURR, including requests for: (1) a routine license amendment to MURRs current 104(c) utilization facility license, (2) a license amendment adding a production facility to the existing MURR license, (3) relicensing MURRs utilization facility as a production facility, and (4) a stand-alone production facility license. Of these licensing pathways, MURR concluded that the first option was the most viable as the proposed project does not involve new construction, uses standard existing equipment at MURR, and does not involve an alteration or material alteration to the facility, as described in Title 10 of the Code of Federal Regulations (10 CFR) Sections 50.23, Construction Permits, and 50.92, Issuance of Amendment. While no licensing decisions were made at this meeting, the NRC staff informed MURR that special consideration would be given to the meanings of alteration and material alteration, as well as the 10 CFR Part 50 definitions of production and utilization facilities, when evaluating MURRs future licensing action request. Additional details on MURRs proposed licensing approach is available in the meeting slides provided as Enclosure 3 to this meeting summary.

Please direct any inquiries to Steve Lynch at 301-415-1524 or Steven.Lynch@nrc.gov.

/RA/

Steve Lynch, Project Manager Research and Test Reactors Licensing Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-186

Enclosures:

1. List of Attendees
2. Overview Presentation
3. Licensing Presentation cc: w/enclosures Ralph A. Butler, Director Research Reactor Center University of Missouri-Columbia 1513 Research Park Columbia, MO 65211 Keith C. Shoolbred, Manager Program Support Energy and Advanced Concepts Group P.O. Box 85608 San Diego, CA 92186

Pkg: ML15187A033, Notice: ML15105A365, MtgSummary: ML15187A137, Overview Presentation:

ML15187A234, Licensing Presentation: ML15187A237, Affidavit: ML15187A215, Proprietary Review: ML15187A220 NRC-001

  • via e-mail OFFICE DPR/PRLB/PM
  • DPR/PRLB/LA DPR/PRLB/BC DPR/PRLB/PM NAME SLynch ABaxter/NParker AAdams SLynch DATE 07/08/15 07/08/15 07/9//15 07/9/15

LIST OF ATTENDEES APRIL 27, 2015, MEETING WITH UNIVERSITY OF MISSOURI RESEARCH REACTOR CENTER 1:00 P.M - 4:30 P.M.

Name Organization Les Foyto University of Missouri Research Reactor Center (MURR)

Kenneth Brooks MURR Ralph Butler MURR Chris Stone MURR John Saurwein General Atomics (GA)

Robert Schleicher GA Hangbok Choi GA Chris Critch Nordion Ronald McGregor Nordion Tom Burnett Nordion Ira Goldman Lantheus Tom Poindexter Morgan Lewis Tom Ruth Triumf Ourania Kosti National Academy of Sciences Carolyn Haass Northwest Medical Isotopes Randy Howell National Nuclear Security Administration (NNSA)

Crystal Trujillo NNSA Steve Lynch U.S. Nuclear Regulatory Commission (NRC)

Michael Balazik NRC Kevin Folk NRC John Adams NRC Eben Allen NRC Mary Adams NRC Mitzi Young NRC Russell Chazell NRC Lisa London NRC Duane Hardesty NRC Alexander Adams, Jr.

NRC Kara McCullough NRC Dan Barss NRC Rui Li NRC Mirela Gavrilas NRC Geoff Wertz NRC Ossy Font NRC Larry Harris NRC William Schuster NRC Patricia Pelke NRC Bob Lukes NRC Carl Weber NRC William Gloersen NRC