29 ID: Q44311 Points:
1.00 Given the following conditions:
- Unit 1 is operating at 100% power (1) What is the predicted effect on the RCS if a Purification ion exchanger that has been isolated for 5 days is placed in service without performing any pre-service flushes?
(2) What actions should be taken to offset the reactivity change?
A. (1) RCS temperature will rise (2) RCS dilution B. (1) RCS temperature will rise (2) RCS boration C. (1) RCS temperature will lower (2) RCS dilution D. (1) RCS temperature will lower (2) RCS boration Answer: D NOTE: This answer has been changed from D to C. See Exam Report for details.