Letter Sequence Response to RAI |
---|
|
|
MONTHYEARML13093A0642013-03-28028 March 2013 License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) Project stage: Request ML13093A0652013-03-29029 March 2013 Transition Report to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition - Transition Report, Redacted Version. Enclosure 2 Project stage: Request ML13161A2852013-06-0505 June 2013 NRR E-mail Capture - Acceptance Review Concerning Request to Adopt National Fire Protection Association Standard NFPA-805, Project stage: Acceptance Review ML13162A4402013-06-20020 June 2013 R. E. Ginna Nuclear Power Plant - Acceptance Review Concerning Request to Adopt National Fire Protection Association Standard NFPA-805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants Project stage: Acceptance Review ML13261A1142013-09-12012 September 2013 R. E. Ginna Nuclear Power Plant, E-mail Re. NFPA 805 License Amendment Request, Audit RAIs Project stage: Acceptance Review ML14343A9902014-12-0909 December 2014 NRR E-mail Capture - Ginna Nuclear Power Plant-Request for Additional Information Regarding NFPA-805 Amendment Request. Project stage: RAI ML15154B6552015-06-0202 June 2015 E-mail Request Conference Call to Discuss Ginna'S 4/24/15 Supplement for the Proposed NFPA-805 Amendment Project stage: Other ML15167A5042015-06-11011 June 2015 Transmittal of Response to Request for Additional Information Regarding the License Amendment Request (LAR) to Adopt NFPA 805 Project stage: Response to RAI ML15167A5052015-06-11011 June 2015 (Redacted Version) Response to Request for Additional Information Regarding the License Amendment Request (LAR) to Adopt NFPA 805, Attachment 3 Project stage: Response to RAI ML15181A1132015-06-30030 June 2015 NRR E-mail Capture - Request for Additional Clarification of Ginna'S Response to PRA RAI 44.01.b Project stage: RAI ML15191A4132015-07-10010 July 2015 NRR E-mail Capture - Summary of the Conference Call with Ginna Re. the Proposed NFPA-805 Amendment Project stage: Other ML15210A9042015-07-29029 July 2015 NRR E-mail Capture - NRC Staff Comments on the Roadmap Project stage: Other ML15188A2132015-08-20020 August 2015 Report of Audit to Support Proposed Amendment to Transition to the National Fire Protection Association Standard 805 Fire Protection Licensing Basis Project stage: Other 2014-12-09
[Table View] |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 05000244/LER-2023-003-01, Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam2024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations 05000244/LER-2023-003, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level2023-12-11011 December 2023 Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums 05000244/LER-2023-002, Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure2023-11-0808 November 2023 Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure. IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) 2024-09-25
[Table view] |
Text
This letter forwards Security-related information in accordance with 10 CFR 2.390. The balance of this letter may be considered non-Security Related upon the removal of Attachment 2.
VJoe Pacher Site Vice President Exelon Generation. R.E. Ginna Nuclear Power Plant 1503 Lake Rd.
Ontario, NY 14519 315-791-5200 Office 585 545 1586 Mobile www.exeloncorp.corn joselph.pacher@exeloncorp.com June 11, 2015 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk
SUBJECT:
R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 Docket No. 50-244 Response to Request for Additional Information
REFERENCES:
(A) Letter from Mr. Joseph E. Pacher (Ginna LLC) to Document Control Desk (NRC) dated March 28, 2013,
Subject:
License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (ML13093A064)
(B) Letter from Mr. Mohan Thadani (NRC) to Joe Pacher (Exelon) dated September 19, 2014,
Subject:
R.E. GINNA NUCLEAR POWER PLANT- SECOND ROUND OF REQUEST FOR ADDITIONAL INFORMATION CONCERNING REQUEST TO ADOPT NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA-805, "PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS," (TAC NO.
MF1393) (ML14254A166)
Enclosed is the response to the Request for Additional Information (RAI) to the License Amendment Request (LAR) for Ginna to Adopt NFPA 805 (Reference A). This response is for RAI 44.01.b received in the letter dated September 19, 2014 (Reference B).
Ginna has provided a response to PRA RAI 44.01.b on September 24, 2014, and in that response stated an approach, agreed upon with the NRC staff, to provide a response to PRA RAI 44.01 .b after the NRC had notified Ginna that the responses to 44.01 .a are acceptable and that there are no other PRA RAIs forthcoming. Ginna responded to further PRA RAIs on December 4, 2014 and March 18, 2015. On April 1, 2015, the NRC staff provided notification that the responses to the RAIs were acceptable and to prepare the aggregate analysis for submission. Attachments 2 and 3 contain the response to this RAI.
There are no new regulatory commitments identified in this letter; however, Attachment 1 of this letter replaces Enclosure 1 of Reference A; and Attachment 4 of this letter replaces This letter forwards Security-related information in accordance with 10 CFR 2.390. The balance of this letter may be considered non-Security Related upon the removal of Attachment 2.
Document Control Desk June 11, 2015 Page 2 page 64 of reference A. Due to the indeterminate schedule for NRC approval of the Topical Report on the RCP seal design that Ginna intends to use for one of the committed modifications, Ginna is proposing to implement modifications identified in the Ginna Transition Report of Reference A, Attachment S, Table S-2, "Plant Modifications Committed," no later than the Second Refueling Outage more than 12 months after NRC approval of the LAR.
Should you have any questions regarding this submittal, please contact Thomas Harding at 315-791-5219.
Sin erely yours, seph E. Pacher JP/kc ATTACHMENTS: (1) Revised Commitments (2) R.E. Ginna Nuclear Power Plant Responses to Request for Additional Information (3) R.E. Ginna Nuclear Power Plant Responses to Request for Additional Information (Redacted Version)
(4) Revised Section 5.5 cc: NRC Regional Administrator, Region I (w/o Attachment 3)
NRC Project Manager, Ginna NRC Resident Inspector, Ginna (w/o Attachment 3)
A.L. Peterson, NYSERDA (w/o Attachment 2)
Attachment 1 Revised Commitments
SUMMARY
OF REGULATORY COMMITMENTS The following table identifies commitments made in this document. (Any other actions discussed in the submittal represent intended or planned actions. They are described to the NRC for the NRC's information and are not regulatory commitments.)
Commitment Committed Date or Commitment Type "Outage" One-Time Action Programmatic (Yes/No) (Yes/No)
Ginna will implement No later than the modifications modiicatonsSecond Refueling identified in the Ginna Transition Seond Rfengthan 12 Outage more months after NRC Yes Report, Attachment approval of the S, Table S-2, "Plant License Amendment Modifications Request.
Committed" Within 180 days after Ginna will implement NRC Licenseapproval of the Amendment the fire protection Rense Amevent licensing basis Request. However, if including items that date falls within identified listed in the a scheduled Ginna GinnaTranstion Transition refueling then outage, implementation Yes thnipenaio Rabepo Attachment Report, Attachwill
, occur within 60 S, Table S-3, days after plant "Implementation dy fe ln Items" startup from that scheduled refueling outage.