RS-15-097, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
| ML15159A385 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 06/08/2015 |
| From: | Jim Barstow Exelon Generation Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| EA-12-051, RS-15-097 | |
| Download: ML15159A385 (11) | |
Text
Exelon Generation RS-15-097 June 8, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Nine Mile Point Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-63 NRC Docket No. 50-220 Order No. EA-12-051
Subject:
Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
References:
- 1. NRC Order Number EA-12-051, "Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," dated March 12, 2012
- 2. NRC Interim Staff Guidance JLD-ISG-2012-03, "Compliance with Order EA-12-051, Reliable Spent Fuel Pool Instrumentation," Revision 0, dated August 29, 2012
- 3. NEI 12-02, Industry Guidance for Compliance with NRC Order EA-12-051, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," Revision 1, dated August 2012
- 4. Constellation Energy Nuclear Group, LLC's Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated October 26, 2012
- 5. Constellation Energy Nuclear Group, LLC letter to NRC, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 28,2013
- 6. Constellation Energy Nuclear Group, LLC letter to NRC, Supplement to Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051),
dated March 8, 2013
- 7. NRC letter to Constellation Energy Nuclear Group, LLC, Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation, dated June 5, 2013
- 8. Constellation Energy Nuclear Group, LLC letter to NRC, Response to Request For Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051), dated July 5, 2013
U.S. Nuclear Regulatory Commission Report of Full Compliance with Order EA-12-051 June 8, 2015 Page 2
- 9. Constellation Energy Nuclear Group, LLC First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated August 27, 2013 (Nine Mile Point Nuclear Station, Unit 1)
- 10. Constellation Energy Nuclear Group, LLC Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 24, 2014 (Nine Mile Point Nuclear Station, Unit 1) 11. Constellation Energy Nuclear Group, LLC Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated August 26, 2014 (Nine Mile Point Nuclear Station, Unit 1)
- 12. Constellation Energy Nuclear Group, LLC Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 19, 2015 (Nine Mile Point Nuclear Station, Unit 1) (RS-15-058)
- 13. NRC letter to Constellation Energy Nuclear Group, LLC, Nine Mile Point Nuclear Station, Unit 1 - Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC No. MF1140), dated November 15, 2013 On March 12, 2012, the Nuclear Regulatory Commission ("NRC" or "Commission") issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," (Reference 1) to Exelon Generation Company, LLC (EGC), known previously as Constellation Energy Nuclear Group, LLC (Exelon, the licensee). Reference 1 was immediately effective and directed EGC to install reliable spent fuel pool level instrumentation.
Specific requirements are outlined in Attachment 2 of Reference 1.
Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance (Reference 2) and an overall integrated plan (OIP) pursuant to Section IV, Condition C. Reference 2 endorsed industry guidance document NEI 12-02, Revision 1 (Reference 3) with clarifications and exceptions identified in Reference 2. Reference 4 provided the EGC initial status report regarding reliable spent fuel pool instrumentation.
References 5 and 6 provided the Nine Mile Point Nuclear Station, Unit 1 OIP.
Reference 1 required submission of a status report at six-month intervals following submittal of the OIP. References 9, 10, 11, and 12 provided the first, second, third, and fourth six-month status reports, respectively, pursuant to Section IV, Condition C.2, of Reference 1 for Nine Mile Point Nuclear Station, Unit 1.
The purpose of this letter is to provide the report of full compliance with the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (Reference 1) pursuant to Section IV, Condition C.3 of the Order for Nine Mile Point Nuclear Station, Unit 1.
Nine Mile Point Nuclear Station, Unit 1 has installed two independent full scale level monitors for the Spent Fuel Pool (SFP) in response to Order EA-12-051. Nine Mile Point Nuclear Station,
U.S. Nuclear Regulatory Commission Report of Full Compliance with Order EA-12-051 June 8, 2015 Page 3 Unit 1 OIP Open Items were superceded by the NRC Interim Staff Evaluation Requests for Additional Information (RAls) contained in Reference 13, as documented in Reference 12.
EGC's response to the NRC OIP Request for Additional Information (OIP RAI), and the NRC Interim Staff Evaluation (ISE) Open Items (ISE RAls) identified in References 7 and 13 have been addressed and closed as documented in References 8, 9, 10, 11, 12 and below, and are considered complete pending NRC Closure. The information provided herein documents full compliance for Nine Mile Point Nuclear Station, Unit 1 with Reference 1.
The following table provides completion references for each NRC OIP RAI and ISE RAI.
OIP RAI Nos. 1, 2, 3, 4, 6, 7, 8, 9, References 8 and 12 10, 11 (Note: NRC did not provide NMPNS with an RAl-5.)
ISE RAI Nos. 1, 3, 4, 5, 6, 7, 8, 9, Reference 12 10, 11, 12, 14, 15, 16, 17, 18 ISE RAI Nos. 2, 13 Reference 12 and updated with this submittal as provided below NRC Audit Questions/Audit Report open items are considered complete pending NRC closure.
It is EGC's understanding that the NRC Site Audit Report contains no remaining audit open items regarding Nine Mile Point Nuclear Station, Unit 1 compliance with NRC Order EA-12-051.
The table below documents the completion of the final remaining open actions as identified in Reference 12. As stated above, EGC provides the response for the following items and considers them to be complete for Nine Mile Point Nuclear Station, Unit 1.
Item Description Reference ISE RAI No. 2 - Provide a final Refer to enclosed drawings (Figures 1-Complete labeled sketch or marked-up plant
- 4) for the SFP and associated SFP Level Sensors and waveguide tubing drawing of the plan view of the route. The NMP1 Spent Fuel Pool is SFP, depicting the SFP inside 33'-2" wide by 37'-5.5" long and 39'-2" dimensions, the planned deep. The primary level sensor will be locations/placement of the primary mounted on the east side of the and back-up SFP level sensor, southeast corner of the spent fuel pool and the proposed routing of the on elevation 340' in the Reactor cables that will extend from these Building. The back-up sensor sensors toward the location of the read-out/display device.
(redundant) will be mounted on the east side of the north east corner of the spent fuel pool on elevation 340' in the Reactor Building. Both Primary
U.S. Nuclear Regulatory Commission Report of Full Compliance with Order EA-12-051 June 8, 2015 Page 4 and Backup sensor tubing will proceed east for a short distance before each enter a new core bore through the refuel floor concrete slab. The sensor tubing will travel further east and vertically downward where the sensor electronics are mounted on the east wall of the Reactor Building (north and south for the respective level sensor) on the elevation 318' one level below the Refueling Floor. Local level indication is provided next to the sensor electronics at this location.
From this point, the instrument cables are routed in separate dedicated conduit within the Reactor Building down to elevation 261' and 250'. From there the cables are routed in separate cable tray through the Turbine Building and into the Auxiliary Control Room for primary and backup SFP level readout capability. The Auxiliary Control Room is located one elevation below and is accessible from the Main Control Room.
ISE RAI No. 13 - Provide the final The power control panel for the configuration of the power supply primary level instrument, PNL-54-65A, is fed from Reactor Protection System source for each channel so that (RPS) cabinet 1 S53, which in turn is the staff may conclude that the provided power by 120V RPS Bus #11, two channels are independent Circuit #19. RPS Bus #11 is fed from from a power supply assignment either UPS 162A or 162B. Both UPS perspective.
receive power from Battery Board #11.
The power control panel for the backup level instrument, PNL-54-65B, is fed from RPS cabinet 1 S55, which in turn is provided power by 120V RPS Bus
- 12, Circuit #30. RPS Bus #12 is fed from either UPS 172A or 172B. Both UPS receive power from Battery Board
- 12.
Each power control panel has its own independent battery supply contained within.
Complete
U.S. Nuclear Regulatory Commission Report of Full Compliance with Order EA-12-051 June 8, 2015 Pages MILESTONE SCHEDULE - ITEMS COMPLETE Milestone Completion Date Submit 60 Day Status Report October 26, 2012 Submit Overall lnteqrated Plan February 28, 2013 Submit Response to RAls July 5, 2013 Submit 6 Month Updates:
Update 1 Auqust 27, 2013 Update 2 February 24, 2014 Update 3 August 26, 2014 Update 4 February 19, 2015 Modifications:
Commence Engineering and Design 202013 Complete Enqineerinq and Desiqn 102014 Respond to NRC ISE RAls 102015 Receipt of SFP Instruments 302014 Commence Installation of SFP Instruments 402014 Complete SFPI Installation and Place Into Service April 2, 2015 ORDER EA-12-051 COMPLIANCE ELEMENTS
SUMMARY
The elements identified below for Nine Mile Point Nuclear Station, Unit 1, as well as the site overall integrated plan response submittal (References 5 and 6), the 6-Month Status Reports (References 9, 1 O, 11, and 12), and any additional docketed correspondence, demonstrate compliance with Order EA-12-051..
IDENTIFICATION OF LEVELS OF REQUIRED MONITORING - COMPLETE Nine Mile Point Nuclear Station, Unit 1 has identified the three required levels for monitoring SFP level in compliance with Order EA-12-051. These levels have been integrated into the site processes for monitoring level during events and responding to loss of SFP inventory.
INSTRUMENT DESIGN FEATURES - COMPLETE The design of the instruments installed at Nine Mile Point Nuclear Station, Unit 1 complies with the requirements specified in the Order and described in NEI 12-02 "Industry Guidance for Compliance with NRC Order EA-12-051". The instruments have been installed in accordance with the station design control process.
U.S. Nuclear Regulatory Commission Report of Full Compliance with Order EA-12-051 June 8, 2015 Page 6 The instruments have been arranged to provide reasonable protection against missiles.
The instruments have been mounted to retain design configuration during and following the maximum expected ground motion. The instruments will be reliable during expected environmental and radiological conditions when the SFP is at saturation for extended periods. The instruments are independent of each other and have separate and diverse power supplies. The instruments will maintain their design accuracy following a power interruption and are designed to allow for routine testing and calibration.
The instrument display is readily accessible during postulated events and allows for SFP level information to be promptly available to decision makers.
PROGRAM FEATURES - COMPLETE Training for Nine Mile Point Nuclear Station, Unit 1 has been completed in accordance with an accepted training process as recommended in NEI 12-02, Section 4.1.
Operating and maintenance procedures for Nine Mile Point Nuclear Station, Unit 1 have been developed and integrated with existing procedures. Procedures have been verified and are available for use in accordance with the site procedure control program.
Site processes have been established to ensure the instruments are maintained at their design accuracy.
This letter contains no new regulatory commitments. If you have any questions regarding this report, please contact David P. Helker at 610-765-5525.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 8th day of June 2015.
Respectfully submitted,
&~~
James Barstow Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC
Enclosure:
ISE RAI No. 2 - Figures 1-4 cc:
Director, Office of Nuclear Reactor Regulation NRC Regional Administrator - Region I NRC Senior Resident Inspector - Nine Mile Point Nuclear Station NRC Project Manager, NRR - Nine Mile Point Nuclear Station Mr. Jeremy S. Bowen, NRR/JLD/JOMB, NRC Ms. Jessica A. Kratchman, NRR/JLD/JPSB, NRC Mr. Jason C. Paige, NRR/JLD/JOMB, NRC
Enclosure ISE RAI No. 2 - Figures 1 - 4
Hoist Well STORAGE PIT ISE RAI No. 2 - Figure 1 Emergency Condensers Spent Fuel Pool t
SFP Level Inst.
Tubing J.
ISE RAI No. 2 - Figure 2 NMP1 SPENT FUEL POOL PLAN VIEW I
33*.2..
I
~-1--~~~~~~~~~~~~......::..:......::'--~~~~~~~~~~~~......i* SECONDARYLEVEL 37'-5.5" GATE STORAGE SPENT FUEL STORAGE RACKS I
FUEL PREP MACHINE
~
HORN & WAVE GUIDE
/
PRIMARY LEVEL HORN
&WAVE GUIDE
0 c
B A
Lj
~
/
- <';?~<""'
-......,~~.,,ro_
'o.
4>o~
-.-:-~~
-+'o"'(c--
- ~
6'_,.
CUSTOMER-'-~~--
CHANGE NOTES:
I. All DllENSIONS TO CENTERLINE JF PIPE.
- 2.
~.REVA TO SUPPLY BllNO rlANGE P<R OWG. 02-9205843, VEGA ro REPLACE Bl!ND tLM;cr tVfl FINAL CONNECT!Oll 13,4 - 14 NPSY).
- 3. BEND RAD :
" <85MMI !TYP. ).
- 4. GENERAL F ABRI A m fRANr.;s ARE +1-*1...
- 5. ADO !Tl ON
' ARE 0\\!Nff S RESPONSIBILITY.
- 6. CONCRETE CURB ~OT SHOWN F O~ CL AR !TY.
Et. USTEO l~ FOR 10!' (f FINIS~EO FLCOR.
- 1. REFUEL FLCJR HAS 1 1,a* Of GROUT TOPPING SO TOI' OF STRUCTURAL CONCRDE IS EL. 339' -10,,,., ALL ANCHOR 30L f ElllEO DEPTHS TG BE ~HSURfO fROM TCl' Of STRUCTURAL CONCRETE OllL Y.
- a. DIMENSIONS MARKED Wlili AN ASTnlSK l*l WERE PRO~WEO BY NINE MllE POl~f.
- 9. A SLCPE Of s" OVER l2" IS REQUIRED O~ER AcL HORIZON!~ SECTIONS.
- 10. l~JE HORIZONTAL DllofNSIONS ARE SHOWN. ACTUAL P !PE LENGTHS Mt:ST BE CAL CU.A J(j TO ACCOUNT FOR SLOPE.
11.ELE~ATIONS ARE PROVIOC:v FOR REFERENCE.
- 12. GROUT PIPE SUPPORTS ON ELEVATION 340'-0' AS REQUIRED TO MAINTAIN PIPE SLOPE PER PROC S-MMP-GEN-015. GROUT TO BE INSTALLED TO A MINIMUM HEIGHT OF \\t.!'.
4 CUSTOMER CHANGE ISE RAI No. 2 - Figure 3
~
sS PE 316 O* 'o2flll; pl*
,,.,,t 2.o 219
- rfJ ~ ~
,9212 ~s£
,. 9 !""
02..rilf 0:*r41,
- 26*
o-6;,1pr-:*s£N,.,.
'i~
~ ()f sEE ~~~~~/vsr.....t rff£~1£0 _..abE ~~
If*
Pl!; MJA*
El~~o! ~L~~G,,_,....-
10 '6£ 1"1e1
~~NAG£ ~,poLS
.nl* rfs"6o<*
""£P 7 0'1 62 12J, 6SA
£L*
c4' le
/
' O*O*
f L~NGfG> i
_ __,... 101 >/*
£L.Jl s,,o'
~
,1
,1 'f t-.
~
~
REV. I DAT£ 11111 1'%fe Fhfl'f
'<::?-
REVISION D!'.SCRJPTIOI uPllATE OF SUPPORT DIWllKG R£F£AENCE
& ADJUSTMENT OF D!UEllSIONS D-fREl'!RV'llllCIVILI l&c BGC ISMo l AJ<C I MM 1 111~0' REVISED DllENSIOll & SENSCll ClllEllTATION AND AllDtD NOT£ 8. 9. 10* & 11 Fl-18/l!*l.ttc.l-f:;"
cO~li~
A I AREVA NP INC.
AREVA 7207 IBM ORJVE, CHARLOTTE, NC 28262 NINE MILE UNIT 1 VEGA WAVEGUIDE ISOMETRIC (SOUTHEAST}
0 c
B 00 NOT SCALE, USE DIMENSIONS ONL y [""' i---
,.... j""*""
,.... I NTS C=22"xn* 02 9207221 C llJllJ2 A
?
1IOS OOC'.JIJM !>I@ Nl'f IHFOR>IA110H OO<fTMl<EO HEREli IS THE P!l()P[R!Y Cf "~
HP INC. (Nd.VA lfP) N4> IS 10 BE ~D PHCPR!EfARY NW r.cttFl!IENT... lllD llAY NOT BE R£PlilllJUttD IJl CoPED IN #!<01.f <XI IN Pm.
lHIS OOCIJMENi 5-tALL NOT 8£ AJRN191£D TO OTHERS \\VITHOVI' 1li£ EXPRESS
- .mrTEN CONSENT Of /Ji.M NP AW IS NOT TO BE USED IN Nff WAY MCH IS CR IAAY BE CEIRINENTIL TO AA£<* ""* THIS OOCUM£KT AND Nl'f COl'IES THAT ll.IY.... >£ BEEH llAOf MVS'I BE Rtll!RNED TO AREVA NP UPON REOU£ST.
PROJECT owe. NO.
D c
B A
.4
~
~""""'...-~
/
~<_,.?o "'~..,
~~'c:?.......-_;,o+-
6"_,,
<~A"'
NOTES:
- 1. ALL 011.(NSIONS TO CENTERLINE OF PIPE.
- 2. AREVA TO SUPPLY BLIND FLANGE PER OIVG. 02-
~~~i~4~00~~~~ I~~ ~~:.L~C~ 4 B~t~ /LANGE FOR
- 3. BENO RAO
" 185t/Ml ITYP. l.
- 4. GENERAL FABRICATION TClERANCES ARE +!-*
- 5. ~~t~~Bll!TY.
ARE OlltlER' s cu s T 0 MER 6" ~~mMu~~ ~&\\ ~~~/~M~~~~TkooR.
CHANGE 7, REFUEL FLOOR HAS 1 t OF GROUT TOPP I NG SO TOP Of STRUCTURAL CONCRETE IS EL, 339'-10 z°* ALL ANCHffi BOLT EllBEO DEPTHS TO BE MEASURED FROM TOP OF STRUCTURAL CONCRETE ONLY,
- 8. DHUSIONS ~J\\RKEO WITH AN ASTERISK <*>
WERE PROVIDED BY NINE MILE POINT.
- 9. A SLOPE OF s OVER 12" IS REOUJREO OVER ALL HORIZONTAL SECTIONS.
- 10. TRUE HORIZONTAL DIMENSIONS ARE SHOWN. ACTUAi PIPE LENGTHS MUST BE CALCULATED TO ACCOUNT FOR SLOPE.
11.ELEVATIONS ARE PROVIDED FOR REFERENCE.
- 12. GROUT PIPE SUPPORTS ON ELEVATION 3411l'-lll' AS REQUIRED TO MAINTAIN PIPE SLOPE PER PROC S-MMP-GEN-015.GROUT TO BE INSTALLED TO A MINIMUM HEIGHT OF ~*.
4 3
3 ISE RAI No. 2 - Figure 4 fLR' 8,,o' w31 2
/
REVISION DESCRIPTION uPDATE OF SUPPORT DRAWING REFERENCE
& ADJUSTMENT !If DlllENSIOHS R£YISED OlllENSIOH & SENSIJI ORIENTATIOlt AND.ADDEO NOTE 9, g, 10, & 11
-CUSTOMER CHANGE CUSTOMER CHANGE DRlfl fREPI RYW ICIYILI I.it BGC ISMc I AKC
.....-.,----~J;.'OCSJUft A.C: ~ TIIT 2.:£:~:... :::!*13 A I AREVA NP INC.
AREVA 7207 IBM DRIVE, CHARLOTTE. NC 28262 DO NOT SCALE, USE Dlt.ENSIONS ONLY NINE MILE UNIT 1 VEGA WAVEGUIDE ISOMETRIC (NORTHEAST)
D c
B 1~--
l.... 0 1--
I NTS C=22"x17" 02 92121722121 c002I A THIS OOC\\lf,£Nl AND Nff INF'ORIMTION CONTAIN£D HEREIN IS THE PROPERTY Of ""'-VA NI' INC. (ARtvA NP) AND ~ TD B!: CONSllJERED PROl'RIETN!Y AND CONF'IOENTW.. ANO NAY NOT 8( REPROOUC'".D OR COPIED IN VIHCl£ OR IN PART.
THIS DOClJMENT SHAU. NOT BE fURNISH[O TO OTHERS WffiolOUT THE EXPRESS WRITTOf CONSENT OF" AREVA NP AND IS NOT TO BE USE0 ti! Nft WAY 'MiCH IS M MA.Y BE OCTRIENTM. TO AREVA fl.'P. lttS OOCUt.100 AND Ntt COPIES lHAl MAY HAVE BEEN MADE MUsr BE RUURN£0 TO MIEVA ti' uP0N REQUEST.
PROJECT OWG. NO.