ML15154B606

From kanterella
Jump to navigation Jump to search

And Oconee Nuclear Station - Transmittal of Draft Safety Evaluation Regarding License Amendment Request Cyber Security Plan Implementation Schedule Milestone 8
ML15154B606
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 06/10/2015
From: Geoffrey Miller
Plant Licensing Branch II
To: Kapopoulos E
Duke Energy Carolinas
Miller G
References
TAC MF5165, TAC MF5166, TAC MF5167, TAC MF5168, TAC MF5169, TAC MF5170
Download: ML15154B606 (3)


Text

OFFICIAL USE ONLY SECURITY RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555--0001 June 10, 2015 Mr. Ernest J. Kapopoulos Jr.

Vice President Corporate Governance and Operations Support Duke Energy Carolinas, LLC P.O. Box 1006/ECO?H Charlotte, NC 28201-1006

SUBJECT:

CATAWBA NUCLEAR STATION, UNITS 1AND2, MCGUIRE NUCLEAR STATION, UNITS 1AND2, AND OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3-TRANSMITTAL OF DRAFT SAFETY EVALUATION REGARDING LICENSE AMENDMENT REQUEST RE: CYBER SECURITY PLAN IMPLEMENTATION SCHEDULE MILESTONE 8 (TAC NOS. MF5165, MF5166, MF5167, MF5168, MF5169, MF5170, AND MF5171)

Dear Mr. Kapopoulos:

By letter dated November 6, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14314A041), Duke Energy Carolinas, LLC (Duke, the licensee),

submitted a license amendment request for Catawba Nuclear Station, Units 1 and 2, McGuire Nuclear Station, Units 1 and 2, and Oconee Nuclear Station, Units 1, 2, and 3. The proposed amendment would modify the completion date for implementing Milestone 8 of the Duke Cyber Security Plan. Specifically, the proposed change would revise the date from June 30, 2015, to December 31, 2017.

Enclosed is the draft Safety Evaluation (SE) that the Nuclear Regulatory Commission (NRC) staff has prepared to support the proposed license amendment. Pursuant to Section 2.390 of Title 10 of the Code of Federal Regulations (10 CFR), we have made a preliminary determination that the enclosed draft SE does not contain security-related information, and the NRC staff requests that the licensee confirm that the draft SE does not contain any security-related information. If you believe that any information should be withheld from public disclosure, please identify such information line-by-line and define the basis pursuant to the criteria of 10 CFR 2.390. The NRC staff requests that Duke provide comments regarding the security-related content in the draft SE within 5 business days from the date of this letter. The response timeframe was discussed with Mr. Arthur Zaremba of your staff on June 10, 2015.

Since the NRC review is not yet complete, this letter and the enclosure do not convey or represent an NRC staff position regarding Duke's request. Should the amendment be approved, the NRC staff will issue a publically available, nonsecurity-related version of the SE.

The Enclosure transmitted herewith contains sensitive unclassified non-safeguards information.

When separated from the Enclosure, this transmittal document is DECONTROLLED.

OFFICIAL USE ONLY SECURITY RELATED INFORMATION

OFFICIAL USE ONLY SECURITY RELATED INFORMATION If you have any questions regarding this matter, I may be reached at (301) 415-2481 or by e-mail at ed.miller@nrc.gov.

Docket Nos. 50-413, 50-414, 50-369, 50-370, 50-269, 50-270, and 50-287

Enclosure:

Draft SE cc w/o encl: Distribution via Listserv Sincerely, G~~l~iJ Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation OFFICIAL USE ONLY SECURITY RELATED INFORMATION

ML151548606 RidsNrrPMMcGuire Resource RidsNrrPMOconee Resource RidsOgcMailCenter Resource RidsRgn2Mai1Center Resource

  • via e-mail OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DORL/LPL2-1 /BC SFigueroa NAME GEMiller (JBurkhardt for)

RPascarelli DATE 6/10/15 6/5/15 6/10/15