Category:Letter
MONTHYEARIR 05000445/20240032024-10-30030 October 2024 Integrated Inspection Report 05000445/2024003 and 05000446/2024003 IR 05000445/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000445/2024404 and 05000446/2024404 (Public) IR 07200074/20244012024-10-10010 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200074/2024401 Public 05000445/LER-2024-002-01, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions2024-10-0303 October 2024 Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions 05000446/LER-2024-001-01, Unit Two, Recurring Reactor Scrams Associated with Main Feedwater System Modifications2024-09-30030 September 2024 Unit Two, Recurring Reactor Scrams Associated with Main Feedwater System Modifications CP-202400335, License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel2024-09-12012 September 2024 License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel ML24031A6322024-09-11011 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4), Final Safety Analysis Report Update Schedule (EPID L-2023-LLE-0023) - Letter ML24243A0152024-09-0303 September 2024 – Notification of Comprehensive Engineering Team Inspection (05000445/2025012 and 05000446/2025012) and Request for Information ML24194A1332024-08-28028 August 2024 Issuance of Amendment Nos. 190 and 190, Respectively, Revision to Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24228A2252024-08-22022 August 2024 Relief to Use Later Code Edition for Inservice Inspection Program ML24179A0772024-08-20020 August 2024 Issuance of Amendment Nos. 189 and 189, Respectively, Extension of Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24232A2262024-08-19019 August 2024 Information Request, Security IR 2024404 ML24232A2412024-08-19019 August 2024 Information Request, ISFSI Security IR 2024401 CP-202400294, (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000445/20240052024-08-15015 August 2024 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2024005 and 05000446/2024005) CP-202400319, (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-13013 August 2024 (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality ML24177A2692024-08-0707 August 2024 Issuance of Amendment Nos. 188 and 188, Respectively, Revision to Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-0505 August 2024 (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality IR 05000445/20240022024-07-31031 July 2024 Units 1 and 2 - Integrated Inspection Report 05000445/2024002 and 05000446/2024002,and Independent Spent Fuel Storage Installation Inspection Report 07200074/2024001 IR 05000445/20244032024-07-16016 July 2024 Security Baseline Inspection Report 05000445/2024403 and 05000446/2024403 (Full Report) ML24187A0372024-07-15015 July 2024 Withdrawal of Requested Licensing Action Exemption from Select Requirements of 10 CFR Part 55, Operators Licenses ML24192A1862024-07-10010 July 2024 Notification of Inspection (NRC Inspection Report 05000445/2024003 and 05000446/2024003) and Request for Information ML24185A1382024-07-0202 July 2024 Inservice Inspection Request for Information CP-202400253, (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 52024-06-26026 June 2024 (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5 IR 05000445/20244012024-06-26026 June 2024 MC&A Program Inspection Report 05000445-2024401 and 05000446-2024401 Public-Final CP-202400235, (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 02024-06-18018 June 2024 (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0 IR 05000445/20240122024-06-17017 June 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000445/2024012 and 05000446/2024012 ML24120A3632024-06-10010 June 2024 Issuance of Amendment Nos. 187 and 187, Respectively Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants 05000445/LER-1924-002, (Cpnpp), Unit 1, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions2024-06-0303 June 2024 (Cpnpp), Unit 1, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions CP-202400205, (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval2024-05-30030 May 2024 (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval CP-202400175, (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-05-16016 May 2024 (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator 05000446/LER-2024-001, (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications2024-05-13013 May 2024 (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications 05000445/LER-2024-001, Re Potential Loss of Safety Function Due to Inoperability of Both Trains of Uninterruptible Power Supply Heating, Ventilation & Air Conditioning2024-05-0606 May 2024 Re Potential Loss of Safety Function Due to Inoperability of Both Trains of Uninterruptible Power Supply Heating, Ventilation & Air Conditioning ML24120A3042024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Sylestine, R, Alabama-Coushatta Tribe of Texas ML24120A2902024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Bunch, J, United Keetoowah Band of Cherokee Indians ML24120A2912024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Cooper, D, Apache Tribe of Oklahoma ML24120A3032024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-SpottedBird, L, Kiowa Indian Tribe ML24107B1012024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Cernek, J, Coushatta Tribe of Louisiana ML24120A3022024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Pierite, M, Tunica-Biloxi Tribe of Louisiana ML24120A2922024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Dotson, Delaware Nation ML24120A2952024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Johnson, L.J., Seminole Nation of Oklahoma CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2024-04-29029 April 2024 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters ML24120A3052024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Woommavovah, M, Comanche Nation ML24120A3072024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Yargee, W, Alabama-Quassarte Tribal Town ML24120A2932024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Garza, Jr, Juan, Kickapoo Traditional Tribe of Texas ML24120A3002024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Morrow, R K, Thlopthlocco Tribal Town ML24120A2942024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Gonzalez, B, Caddo Nation ML24120A3012024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Parton, T, Wichita and Affiliated Tribes ML24120A2972024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Martin, R, Tonkawa Tribe of Oklahoma ML24120A2962024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Kaskaske, D, Kickapoo Tribe of Oklahoma 2024-09-30
[Table view] Category:License-Operator
MONTHYEARIR 05000445/20243012024-02-28028 February 2024 Notification of NRC Initial Operator Licensing Examination 05000445/2024301 and 05000446/2024301 ML23262A9942023-06-22022 June 2023 CP-2023-06 Public Forms ML23226A2342023-06-22022 June 2023 Post Exam Comments and Analysis with Letter CP-202200219, (Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 20262022-05-18018 May 2022 (Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 2026 ML21299A0252021-09-23023 September 2021 CP-2021-08-FINAL Outlines ML21299A0182021-09-23023 September 2021 CP-2021-08-DRAFT Operating Test ML21299A0202021-09-23023 September 2021 CP-2021-08-DRAFT Outlines ML21299A0192021-09-23023 September 2021 2021-08-DRAFT Outline Comments ML21299A0242021-09-23023 September 2021 CP-2021-08-FINAL Make Up Op Test ML21299A0222021-09-23023 September 2021 CP-2021-08-DRAFT Written Exam ML21299A0212021-09-23023 September 2021 CP-2021-08-DRAFT Written Exam Comments ML21299A0232021-09-23023 September 2021 CP-2021-08-FINAL Make Up Op Test Outlines ML21299A0152021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Outlines ML21299A0142021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Outline Comments ML21299A0172021-09-23023 September 2021 CP-2021-08-DRAFT Operating Test Comments ML21299A0162021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test ML21285A0372021-09-23023 September 2021 CP-2021-08-FINAL Operating Test ML21285A0392021-09-23023 September 2021 CP-2021-08-Post Exam Comments ML21299A0132021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Comments ML21285A0382021-09-23023 September 2021 CP-2021-08-FINAL Written Exam ML21299A0452021-09-23023 September 2021 CP-2021-08-Public Forms CP-202100570, (CPNPP) - Initial Operator Licensing Examination2021-08-24024 August 2021 (CPNPP) - Initial Operator Licensing Examination CP-202100559, (CPNPP) - Initial Operator Licensing Examination2021-08-17017 August 2021 (CPNPP) - Initial Operator Licensing Examination ML20174A6082020-05-21021 May 2020 05 Draft Written Examination ML20174A6092020-05-21021 May 2020 05 Final Outlines ML20174A6062020-05-21021 May 2020 05 Draft Outlines ML20174A6052020-05-21021 May 2020 05 Draft Outline Comments ML20174A6072020-05-21021 May 2020 05 Draft Written Examination Comments.Pdf ML20174A6102020-05-21021 May 2020 05 Final Written Examination ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18309A3502018-11-0505 November 2018 Notification of NRC Initial Operator Licensing Examination 05000445/2018301 and 05000446/2019301 IR 05000445/20183012018-11-0505 November 2018 Notification of NRC Initial Operator Licensing Examination 05000445/2018301 and 05000446/2019301 ML18157A0602018-06-0606 June 2018 NRC Initial Operator Licensing Examination Approval 05000445/2018301; 050000446/2018301 CP-201800217, Transmittal of NRC Form 536, Licensed Operator Examination Data2018-04-18018 April 2018 Transmittal of NRC Form 536, Licensed Operator Examination Data ML18086B0842018-02-16016 February 2018 Facility Cover Letter - Riv - March 2018 - GFE ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17179A3462017-06-19019 June 2017 2017-06-Post Examination Comments ML17198B2822017-06-19019 June 2017 2017-06-Public Forms ML17179A0052017-06-19019 June 2017 2017-06-DRAFT Outline Comments ML17179A0062017-06-19019 June 2017 2017-06-DRAFT Outlines ML17179A0072017-06-19019 June 2017 2017-06-DRAFT Written Exam Comments ML17179A0032017-06-19019 June 2017 2017-06-DRAFT Operating Test Comments ML17179A0082017-06-19019 June 2017 2017-06-DRAFT Written Exam ML17179A0102017-06-19019 June 2017 2017-06-FINAL Outlines ML17179A0112017-06-19019 June 2017 2017-06-FINAL Written Exam CP-201700402, Response to RIS 2017-032017-04-28028 April 2017 Response to RIS 2017-03 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16262A0362016-07-18018 July 2016 2016-07 Post-Exam Comments and Analysis ML16262A0382016-07-18018 July 2016 2016-07 Final Written Exams ML16262A0372016-07-18018 July 2016 2016-07 Final Operating Test 2024-02-28
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000445/20243012024-02-28028 February 2024 Notification of NRC Initial Operator Licensing Examination 05000445/2024301 and 05000446/2024301 ML23226A2342023-06-22022 June 2023 Post Exam Comments and Analysis with Letter ML23262A9942023-06-22022 June 2023 CP-2023-06 Public Forms CP-202200219, (Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 20262022-05-18018 May 2022 (Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 2026 ML21285A0372021-09-23023 September 2021 CP-2021-08-FINAL Operating Test ML21285A0382021-09-23023 September 2021 CP-2021-08-FINAL Written Exam ML21299A0212021-09-23023 September 2021 CP-2021-08-DRAFT Written Exam Comments ML21299A0142021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Outline Comments ML21299A0162021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test ML21299A0152021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Outlines ML21299A0182021-09-23023 September 2021 CP-2021-08-DRAFT Operating Test ML21299A0172021-09-23023 September 2021 CP-2021-08-DRAFT Operating Test Comments ML21299A0202021-09-23023 September 2021 CP-2021-08-DRAFT Outlines ML21299A0192021-09-23023 September 2021 2021-08-DRAFT Outline Comments ML21299A0132021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Comments ML21299A0252021-09-23023 September 2021 CP-2021-08-FINAL Outlines ML21299A0452021-09-23023 September 2021 CP-2021-08-Public Forms ML21299A0232021-09-23023 September 2021 CP-2021-08-FINAL Make Up Op Test Outlines ML21299A0222021-09-23023 September 2021 CP-2021-08-DRAFT Written Exam ML21285A0392021-09-23023 September 2021 CP-2021-08-Post Exam Comments ML21299A0242021-09-23023 September 2021 CP-2021-08-FINAL Make Up Op Test CP-202100570, (CPNPP) - Initial Operator Licensing Examination2021-08-24024 August 2021 (CPNPP) - Initial Operator Licensing Examination ML20174A6052020-05-21021 May 2020 05 Draft Outline Comments ML20174A6062020-05-21021 May 2020 05 Draft Outlines ML20174A6072020-05-21021 May 2020 05 Draft Written Examination Comments.Pdf ML20174A6082020-05-21021 May 2020 05 Draft Written Examination ML20174A6102020-05-21021 May 2020 05 Final Written Examination ML20174A6092020-05-21021 May 2020 05 Final Outlines ML18309A3502018-11-0505 November 2018 Notification of NRC Initial Operator Licensing Examination 05000445/2018301 and 05000446/2019301 IR 05000445/20183012018-11-0505 November 2018 Notification of NRC Initial Operator Licensing Examination 05000445/2018301 and 05000446/2019301 ML18157A0602018-06-0606 June 2018 NRC Initial Operator Licensing Examination Approval 05000445/2018301; 050000446/2018301 CP-201800217, Transmittal of NRC Form 536, Licensed Operator Examination Data2018-04-18018 April 2018 Transmittal of NRC Form 536, Licensed Operator Examination Data ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17179A0082017-06-19019 June 2017 2017-06-DRAFT Written Exam ML17179A0062017-06-19019 June 2017 2017-06-DRAFT Outlines ML17179A0032017-06-19019 June 2017 2017-06-DRAFT Operating Test Comments ML17179A0052017-06-19019 June 2017 2017-06-DRAFT Outline Comments ML17179A0072017-06-19019 June 2017 2017-06-DRAFT Written Exam Comments ML17179A0102017-06-19019 June 2017 2017-06-FINAL Outlines ML17179A0112017-06-19019 June 2017 2017-06-FINAL Written Exam ML17198B2822017-06-19019 June 2017 2017-06-Public Forms ML17179A3462017-06-19019 June 2017 2017-06-Post Examination Comments CP-201700402, Response to RIS 2017-032017-04-28028 April 2017 Response to RIS 2017-03 ML16262A0382016-07-18018 July 2016 2016-07 Final Written Exams ML16262A0372016-07-18018 July 2016 2016-07 Final Operating Test ML16262A0362016-07-18018 July 2016 2016-07 Post-Exam Comments and Analysis ML16293A9752016-07-11011 July 2016 2016-07 Proposed OP Test Comments ML16293A9762016-07-11011 July 2016 2016-07 Final Outlines ML16293A9712016-07-11011 July 2016 2016-07 Proposed Outline Comments ML16293A9722016-07-11011 July 2016 2016-07 Proposed Written Exam 2024-02-28
[Table view] |
See also: IR 05000445/2015302
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E LAMAR BLVD
ARLINGTON, TX 76011-4511
May 27, 2015
Rafael Flores, Senior Vice President
and Chief Nuclear Officer
Attention: Regulatory Affairs
Luminant Generation Company LLC
Comanche Peak Nuclear Power Plant
P.O. Box 1002
Glen Rose, TX 76043
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC INITIAL
OPERATOR LICENSING EXAMINATION APPROVAL 05000445/2015302;
05000446/2015302
Dear Mr. Flores:
The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing examinations at the Comanche Peak Nuclear Power Plant.
The NRC has completed its review of the operator license applications submitted in connection
with this examination and separately provided a list of approved applicants to Garry Struble,
Licensing Exam Manager. Note that any examination waivers and application denials have
been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the
written examination in accordance with NUREG-1021, "Operator Licensing Examination
Standards for Power Reactors," Revision 9, Supplement 1, on June 8, 2015. The NRC staff will
administer the operating tests during the week of June 1, 2015. This examination has
undergone extensive review by my staff and representatives responsible for licensed operator
training at your facility. Based on this review, I have concluded that the examination meets the
guidelines of NUREG-1021 for content, operational, and discrimination validity. By
administering this examination, you also agree that it meets NUREG-1021 guidelines, and is
appropriate for measuring the qualifications of licensed operator applicants at your facility. If
you determine that this examination is not appropriate for licensing operators at your facility, do
not administer the examination and contact me at (817) 200-1159.
Please contact your Chief Examiner, Clyde Osterholtz, at (817) 200-1269, if you have any
questions or identify any errors or changes in the license level (RO or SRO) or type of
examination (partial or complete written examination and/or operating test) specified for each
applicant.
Sincerely,
/RA/
Vincent Gaddy, Chief
Operations Branch
Division of Reactor Safety
Luminant Generation Company LLC -2-
Dockets: 50-445; 50-446
Licenses: NPF-87; NPF-89
Enclosure: ES-201-4
cc w/enclosure:
Garry Struble
Licensing Exam Manager
Luminant Generation Company LLC
P.O. Box 1002
Glen Rose, TX 76043-1147
cc w/o enclosure:
Distribution via ListServ for Comanche Peak
Luminant Generation Company LLC -3-
Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (John.Kramer@nrc.gov)
Senior Resident Inspector (Jeffrey.Josey@nrc.gov)
Resident Inspector (Rayomand.Kumana@nrc.gov)
Administrative Assistant (Rhonda.Smith@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)
Project Engineer, DRP/A (Margaret.Tobin@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Team Leader, DRS/TSS (Don.Allen@nrc.gov
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
Branch Chief, DRS/OB (Vincent.Gaddy@nrc.gov)
Senior Operations Engineer, DRS/OB (Clyde.Osterholtz@nrc.gov)
X SUNSI Review ADAMS X Publicly Available X Non-Sensitive Keyword:
By: lah X Yes No Non-Publicly Available Sensitive NRR-079
OFFICE RIV:DRS:OB SOE:OB C:OB
NAME LAHurley COsterholtz VGaddy
SIGNATURE /RA/ /RA/ /RA/
DATE 05/19 /15 05/26/15 05/26/15
OFFICIAL RECORD COPY