NRDC Reply Brief - NRDC V NRC - DC Cir 14-1225 - Limerick License Renewal
ML15141A329
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/21/2015
From: Crystal H, Fettus G, Glitzenstein E
Meyer Glitzenstein & Crystal, Natural Resources Defense Council
To:
NRC/OGC, US Federal Judiciary, US Court of Appeals for the District of Columbia Circuit
Creedon, Meghan
References
14-1225, 1553574
Download: ML15141A329 (36)


Text

[ORAL ARGUMENT NOT YET SCHEDULED]

No. 14-1225 IN THE UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT NATURAL RESOURCES DEFENSE COUNCIL, INC.

Petitioner,

v.

UNITED STATES OF AMERICA AND NUCLEAR REGULATORY COMMISSION, Respondents.

PETITION FOR REVIEW OF FINAL ORDERS OF THE UNITED STATES NUCLEAR REGULATORY COMMISSION REPLY BRIEF FOR PETITIONER NATURAL RESOURCES DEFENSE COUNCIL, INC.

Geoffrey H. Fettus Natural Resources Defense Council, Inc.

1152 15th Street, NW, Suite 300 Washington, D.C. 20005 (202) 289-2371 Howard M. Crystal Eric R. Glitzenstein MEYER GLITZENSTEIN & CRYSTAL 1601 Connecticut Ave., N.W., Suite 700 Washington, D.C. 20009 (202) 588-5206 (202) 588-5049 (facsimile)

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 1 of 36

TABLE OF CONTENTS PAGE TABLE OF AUTHORITIES.......................................... ii GLOSSARY...................................................... v INTRODUCTION AND

SUMMARY

OF ARGUMENT................... 1 ARGUMENT...................................................... 1 I.

THE COMMISSIONS DECISION THAT 10 C.F.R. § 51.53(c)(3)(ii)(L)

REQUIRED NRDC TO OBTAIN A WAIVER WAS ARBITRARY AND CAPRICIOUS................................................ 8 II.

THE COMMISSIONS DECISION THAT NRDC IS NOT ENTITLED TO A WAIVER OF 10 C.F.R. § 51.53(c)(3)(ii)(L) WAS ARBITRARY AND CAPRICIOUS.............................. 15 III.

IF THE COMMISSIONS REGULATORY SCHEME MUST BE READ TO PRECLUDE NRDC FROM A HEARING ON SAMA CONTENTIONS, THE COURT SHOULD FIND IT UNLAWFUL.... 22 IV.

THE CHOURT SHOULD VACATE THE RENEWED LIMERICK LICENSE PENDING CONSIDERATION OF NRDCS CONTENTIONS..................................... 27 CONCLUSION................................................... 28 USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 2 of 36

ii TABLE OF AUTHORITIES CASES PAGE Adams Fruit Co. v. Barrett, 494 U.S. 638 (1990).............................................................................................. 14 Alaska v. FERC, 980 F.2d 761 (D.C. Cir. 1992)......................................................................... 3, 10 Am. Farm Bureau Fed'n v. E.P.A.,

559 F.3d 512 (D.C. Cir. 2009).............................................................................. 14 Amherst v. Omnipresent, 173 F.3d 9 (D.C. Cir. 1999).................................................................................... 4 Blue Ridge Environmental Defense League v. NRC, 716 F.3d 183 (D.C. Cir. 2013).............................................................................. 13 Coal River Energy, LLC v. Jewell, 751 F.3d 659 (D.C. Cir. 2014).............................................................................. 26 FiberTower Spectrum Holdings LLC v. FCC, 782 F.3d 692 (D.C. Cir. 2015)............................................................................. 27 Gerber v. Norton, 294 F.3d 173 (D.C. Cir. 2002)....................................................................... 24, 26 Independent Cmty. Bankers v. Fed. Reserve, 195 F.3d 28 (D.C. Cir. 1999)................................................................................ 27

  • Limerick Ecology Action, Inc. v. NRC, 869 F.2d 719 (3d Cir. 1989)........................................................................... 20, 25 Massachusetts v. NRC, 708 F.3d 63 (1st Cir. 2013)............................................................................ 13, 21
  • Authorities upon which we chiefly rely are marked with asterisks USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 3 of 36

iii Massachusetts v. United States, 522 F.3d 115 (1st Cir. 2008)...................................................................... 9, 10, 22

  • New York v. NRC, 681 F.3d at 471 (D.C. Cir. 2012)............................................................. 25, 26, 28
  • Union of Concerned Scientists v. NRC, 735 F.2d 1437 (D.C. Cir. 1984)....................................................................... 4, 11 United States v. Emor, F.3d _, 2015 WL 2061817 (D.C. Cir. May 5, 2015)............................................ 23 COMMISSION DECISIONS In the Matter of Entergy Nuclear Power, CLI-07-03, 2007 WL 172517 (Jan. 22, 2007).......................................................16 In the Matter of Entergy Nuclear Generation Co.,

CLI-12-01 (Mar. 8, 2012).....................................................................................19 In the Matter of Entergy Nuclear Generation Co.,

CLI-12-06, (Mar. 8, 2012)....................................................................................16 In the Matter of Exelon Generation Co.,

CLI-13-07, 78 NRC 199 (2013)............................................................. 6, 8, 15, 18 STATUTES 28 U.S.C. § 2239(a)(1)(A)......................................................................................... 6 42 U.S.C. § 4321........................................................................................................ 2 USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 4 of 36

iv REGULATIONS 10 C.F.R. § 2.309....................................................................................................... 6 10 C.F.R. § 2.309(f).............................................................................. 1, 4, 6, 13, 19 10 C.F.R. § 2.335(a)...............................................................................................4, 8 10 C.F.R. § 2.335(b)................................................................................................ 15 10 C.F.R. § 51.53(c)(3)(ii)(L)............................................... 4, 7, 8, 9, 15, 17, 20, 21 10 C.F.R. § 51.53(c)(3)(iv)............................................................................... 4, 8, 9 USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 5 of 36

GLOSSARY BWR Boiling Water Reactor NEPA National Environmental Policy Act NRC Nuclear Regulatory Commission NRDC Natural Resources Defense Council SAMAs Severe Accident Mitigation Alternatives SEIS Supplemental Environmental Impact Statement v

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 6 of 36

INTRODUCTION AND

SUMMARY

OF ARGUMENT There is no dispute that, to date, the Nuclear Regulatory Commission (NRC or Commission) has never considered whether the Natural Resources Defense Councils (NRDC) SAMA contentions meet the contention admissibility factors in 10 C.F.R. § 2.309(f). Rather, while the government and Intervenors briefs repeatedly seek to obscure this critical fact, the Commission has flatly refused to apply those factors to NRDCs contentions on the grounds that its regulatory scheme precludes NRDC from even trying to demonstrate the contentions meet admissibility requirements.

On the other hand, the only adjudicatory body to have considered whether NRDCs contentions satisfy the strict admissibility requirements of 10 C.F.R.

§ 2.309(f) - the Atomic Safety Licensing Board - explicitly found those requirements met, observing NRDC has shown there are numerous new SAMA

[Severe Accident Mitigation Alternative] candidates which should be evaluated for their significance. Exelon Generation Co., LLC (Limerick Generating Station, Units 1 and 2), LBP-12-8, 75 NRC 539, 557, slip op. at 21 (Apr. 4, 2012)

(hereinafter Board Op.) (emphasis added) (JA 121). For example, NRDC USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 7 of 36

2 identified a long list of potentially cost-beneficial SAMAs never considered for Limerick. See Motion to Intervene Decl., ¶¶ 9-15 (JA 73-78).1 Had NRDC been admitted into the proceeding to pursue its SAMA contentions against Exelon Generation Companys (Exelon) Environmental Report when the Final Supplemental Environmental Impact Statement (SEIS) for Limerick was issued, it would have had the opportunity to adjudicate within the agency whether the Final SEIS had addressed SAMAs in the manner required by the National Environmental Policy Act (NEPA), 42 U.S.C. § 4321, et seq.

However, contrary to the governments incongruous suggestion that NRDC somehow passed up that opportunity, NRC Br. at 23 n.69, the Commission ruled NRDCs SAMA contentions may not be litigated in the Limerick relicensing proceeding, and thus NRDC is foreclosed from challenging before the Commission 1

These include various forms of alternative power or water supply to mitigate a severe accident that might disrupt primary power or water supplies essential to plant safety. Id.; see also, e.g., Board Op. at 556 (slip op. at 20) (JA 120) (finding that NRDC has provided a specific statement, as well as an adequate basis, for one contention); id. at 560 (JA 124-25) (finding NRDC provided the requisite genuine dispute on a material issue, statement of the alleged facts or expert opinion, and specific sources and documents on which it intends to rely);

Petitioners Opening Brief (Pet. Br.) at 16 and n.7 (summarizing Board opinion).

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 8 of 36

3 any aspect of the more than twenty pages of analysis in the Final SEIS addressing SAMAs. See Final SEIS at 5-3 to 5-26 (JA 677-700).2 Even more fundamentally, having categorically denied NRDC a hearing on these issues, the Commission has excluded NRDC altogether from obtaining judicial review regarding the adequacy of the Final SEISs analysis of the SAMA issues raised by NRDC, because, having been denied intervenor status, NRDC is not a party aggrieved under the Hobbs Act. Alaska v. FERC, 980 F.2d 761, 763 (D.C. Cir. 1992); see also NRC Br. at 1 n.2 (recognizing NRDC may not challenge any aspect of the license renewal because they are not parties to the proceeding).

Accordingly, while it is true the Commission does not argue the Court lacks jurisdiction to hear this Petition, NRC Br. at 51, that is a red herring, for the salient question here is whether the Commission may carry out its regulatory scheme in a manner that categorically excludes administrative, and therefore later judicial, review over the agencys consideration of SAMAs in the Limerick relicensing proceeding. Only if this petition is granted will NRDC have the opportunity to 2

This Petition is thus certainly not all about the adequacy of t[he]

determinations the Commission made in completing the Limerick SEIS, as Exelon claims, Int. Br. at 35 (emphasis added); rather it concerns whether NRDC will be afforded the opportunity to challenge the adequacy of those determinations.

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 9 of 36

4 seek to pursue SAMA contentions before the Commission, and then obtain ultimate judicial review in this Court.3 The governments responses to NRDCs arguments on these matters only further serve to highlight that, although there are several analytical pathways available to the Court, only one outcome is consistent with NEPA, the Atomic Energy Act, and the Administrative Procedure Act: concluding NRDC is entitled to have its SAMA contentions considered under 10 C.F.R. § 2.309(f).4 The most straightforward route to that result is to conclude that, reading 10 C.F.R. § 51.53(c)(3)(ii)(L) and 10 C.F.R. § 51.53(c)(3)(iv) together, there is no basis to conclude NRDCs contentions are barred by 10 C.F.R. § 2.335(a). Rather, given that the Commissions SAMA regulation purports to rely on a SAMA analysis done in connection with the original licensing of the Limerick plant as the 3

When NRDC finally is afforded the opportunity to challenge the consideration of SAMAs in the Final SEIS, it will detail numerous deficiencies, some of which are outlined below. See infra at 25 n.19.

4 Contrary to the Commissions repeated mischaracterization, NRDC does not claim an absolute right to a hearing, e.g. NRC Br. at 34, but simply seeks to overcome the Commissions automatic bar to a hearing here. Union of Concerned Scientists v. NRC (UCS I), 735 F.2d 1437, 1444 (D.C. Cir. 1984) (making clear the right to a hearing means a chance for submission and challenge of evidence as to any and all issues of material fact); cf. Amherst v. Omnipresent, 173 F.3d 9, 14 (D.C. Cir. 1999) (If the criteria or their administration effectively preclude towers no matter what the carrier does, they may amount to a ban in effect.)

(emphasis added).

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 10 of 36

5 SAMA for relicensing, at the very least that regulation cannot be read to bar a hearing during relicensing over new and significant SAMA-related information.

Alternatively, the Court may find, irrespective of whether the SAMA regulation bars this result, the waiver regulation does not. Neither the governments nor Exelons arguments persuasively explain how the Commission reasonably rejected NRDCs waiver petition on the grounds that the issues raised were not sufficiently unique to Limerick. NRC Br. at 55-60; Exelon Br. at 26-29.

Characterizing a concern at a level of generality making it arguably applicable to many plants - by claiming NRDCs contentions simply involve the passage of time, NRC Br. at 55 deprives the regulation of all effect. Moreover, since Limerick is the only Boiling Water Reactor (BWR) subject to the regulatory exception to a SAMA analysis during relicensing, in fact the BWR issues raised in the SAMA contentions will not be grounds for a later waiver (and thus are unique),

since there is going to be a baseline SAMA analysis conducted for the other BWRs when they undergo relicensing (since one was not done in connection with licensing).

Indeed, the Commissions arguments are irreconcilable with its conclusion, in denying the waiver request, that new and significant information concerning SAMAs must be considered during relicensing for Limerick, including the very USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 11 of 36

6 information NRDC sought to address in its SAMA contentions. Exelon Generating Co, LLC (Limerick Generating Station, Units 1 and 2), CLI-13-07, 2013 WL 5872241, slip. op. at 22-23 (Oct. 31, 2013) (JA 395-96). Under the Commissions view, while these matters must be considered in this plant-specific relicensing -

and take up more than twenty pages of discussion in the Final SEIS - NRDC is entitled to neither a hearing on whether these matters were properly addressed, nor judicial review. This makes no sense, and reinforces why, at minimum, NRDC should be deemed to qualify for a waiver.

However, if the Court were nonetheless to conclude the Commissions regulatory scheme cannot be interpreted to allow NRDC an opportunity to have its SAMA contentions judged against the admissibility requirements of 10 C.F.R.

§ 2.309(f), then the scheme must be deemed incompatible with NEPA and the Atomic Energy Act. NEPAs hard look requirement is toothless without meaningful judicial review of whether an agency has faithfully carried out NEPAs mandates. In addition, Congress dictated there should be widespread participation in the critical health and safety issues surrounding nuclear energy, and created an explicit hearing right to further that objective, 28 U.S.C. § 2239(a)(1)(A) - and also made the Commissions final decisions subject to judicial review. Id. § 2344. By creating and implementing a scheme whereby a party is USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 12 of 36

7 not even permitted to attempt to obtain a section 2.309 hearing, or obtain judicial review, the Commission is thwarting these Congressional directives.

Finally, as also further discussed below, it is no answer for the NRC to rely on the Commissions Rulemaking Petition provisions as the escape valve permitting these matters to be considered and subject to ultimate judicial review.

A Rulemaking Petition is for a generic determination that applies to all plants, and seeks to change a regulation so all plants are subject to a different rule. At issue here, by contrast, is the effort to require further consideration of SAMAs for Limerick during relicensing. Thus, because 10 C.F.R. § 51.53(c)(3)(ii)(L) is not, in fact, a generic regulation, it makes no sense to suggest a Rulemaking Petition is the appropriate vehicle to insure SAMAs are properly considered before the Limerick plant is relicensed.5 5

While the Commission also claims the SAMA issue was reconsidered in the 2013 update to the Generic EIS, NRC Br. at 48 n.131, in fact that update reiterated the long-standing position that SAMAs cannot be a Category 1 issue because plant-specific mitigation measures vary greatly based on plant designs, safety systems, fuel type, operating procedures, local environment, population, and siting characteristics. Generic EIS Update NUREG-1437, Revision 1 at 1-27, available at http://pbadupws.nrc.gov/docs/ML1310/ML13106A241.pdf (last visited May 20, 2015) (emphasis added).

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 13 of 36

8 ARGUMENT I.

THE COMMISSIONS DECISION THAT 10 C.F.R. § 51.53(c)(3)(ii)(L)

REQUIRED NRDC TO OBTAIN A WAIVER WAS ARBITRARY AND CAPRICIOUS.

According to the Commission, the plain language of 10 C.F.R.

§ 51.53(c)(3)(ii)(L) precludes NRDCs SAMA contentions. NRC Br. at 29-51.

But the regulation does not and cannot bear the weight the Commission would give it.

The immediate purported bar to NRDCs challenge is 10 C.F.R. § 2.335(a),

providing a petitioner may not challenge a regulation in an individual license proceeding. Thus, NRDC may not pursue its SAMA contentions (absent a waiver) if doing so would pose a challenge to 10 C.F.R. § 51.53(c)(3)(ii)(L).

No such challenge is posed here, because the Commission concurs that, despite 10 C.F.R. § 51.53(c)(3)(ii)(L), in order to comply with 10 C.F.R.

§ 51.53(c)(3)(iv) (concerning consideration of new and significant information during relicensing), the Limerick Environmental Report - and ultimately the Final SEIS - must take a hard look at potentially new and significant information regarding already-completed environmental-impact analysis, including SAMAs.

CLI-13-07 at 22-23 (JA 395-96); see also NRC Br. at 21. Thus, because NRDCs contentions are limited to just such new and significant information - which must USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 14 of 36

9 be considered despite 10 C.F.R. § 51.53(c)(3)(ii)(L) - it makes no sense to conclude that contentions challenging whether such information was adequately considered contravenes the regulation.

As NRDC has explained, therefore, the appropriate manner to apply 10 C.F.R. § 51.53(c)(3)(ii)(L), in conjunction with 10 C.F.R. § 51.53(c)(3)(iv) and in view of NEPAs overriding obligations, is to conclude that the former regulation means a complete SAMA analysis must be conducted for plants that did not prepare a SAMA at the licensing phase, while plants that prepared a SAMA analysis associated with licensing may limit the analysis to the consideration of new and significant information - which then may be addressed in an individual adjudication. NRDC Opening Br. at 33-39; see also Waiver Pet. at 16-22 (JA 245-251) (making this argument before the Commission).6 The Commission argues this outcome would be inconsistent with the First Circuits ruling on Category 1 issues. NRC Br. at 40-41 (citing Massachusetts v.

United States, 522 F.3d 115 (1st Cir. 2008)); see also Exelon Br. at 25. The comparison is inapt, however, for while the Commission repeatedly characterizes 10 C.F.R. § 51.53(c)(3)(ii)(L) as a generic determination for SAMAs (which the 6

The Commission curiously asserts NRDC does not challenge the Commissions reasoning in finding the SAMA contentions barred by the regulation. NRC Br. at 34. But that is precisely what NRDC is challenging here.

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 15 of 36

10 First Circuit ruled cannot be raised in an individual licensing hearing), in fact the Generic EIS and associated rulemaking expressly determined SAMAs may not be resolved generically. Envtl. Review for Renewal of Nuclear Power Plant Op.

Licenses, 61 Fed. Reg. 28,467, 28,480 (June 5, 1996) (JA 602); Generic EIS at 5-116 (JA 584) (discussing need for site-specific analysis of measures that could mitigate severe accidents); see also Generic EIS Update NUREG-1437, Rev. 1 at 1-27, available at http://pbadupws.nrc.gov/docs/ML1310/ML13106A241.pdf (last visited May 20, 2015) (reiterating that plant-specific mitigation measures vary greatly based on plant designs, safety systems, fuel type, operating procedures, local environment, population, and siting characteristics).7 Accordingly, NRDC is not seeking to relitigate a Category 1 issue, NRC Br. at 36 (citations omitted), for NRDC has never, until the Limerick relicensing 7

The First Circuit also has a significantly different approach to ultimate judicial review under the Hobbs Act, applying a functional test to determine whether one is a party aggrieved for Hobbs Act purposes - a test that does not equate the regulatory definition of a party in an (agency) proceeding with the participatory status required for judicial review. Mass., 522 F.3d at 131(citations omitted). If that approach were not foreclosed in this Circuit, which it is, see Alaska, 980 F.2d at 763, NRDC here arguably could have challenged the substantive adequacy of the SAMA analysis in the Limerick SEIS, despite having been denied the opportunity to do so in the adjudicatory process.

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 16 of 36

11 proceeding, had an opportunity to address whether SAMAs are being adequately considered during relicensing.8 To be sure, the Generic EIS and the SAMA regulation provide that a new baseline SAMA analysis for relicensing is not required if one was done during licensing. But there is nothing generic about that determination, which, unlike Category 1 issues, has nothing to do with resolving something as to all plants.

Thus, even assuming arguendo the First Circuit correctly ruled petitioners who possess new and significant information pertaining to a Category 1 issue during relicensing may only pursue the issue through a Rulemaking Petition, that reasoning simply has no application here because it is based on the premise that the issue is generic for all plants, while the Commissions has repeatedly, and uniformly, taken the position that SAMAs are not a generic issue.9 8

The Commissions effort to distinguish UCS I, 735 F.2d 1437, on the grounds that the safety matter at issue there was not a generic issue resolved in a generic EIS, NRC Br. at 34-35, therefore also fails because, in fact, SAMAs were not resolved in the Generic EIS here.

9 As we have explained, Pet. Br. at 36 n.16, even subsequent to the 1996 Generic EIS, the Commission has twice rejected the precise argument that SAMAs have been adequately addressed generically and should be removed from the NEPA relicensing process. These rejections make the Commissions extended discussion of SAMA developments that occur outside the NEPA process, NRC Br.

at 6, 12; see also Int. Br. at 8-9, 28, entirely irrelevant, for, again, the Commission has conclusively determined that these developments are not sufficient to deem SAMAs an issue beyond the scope of the NEPA process for relicensing. Indeed, if USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 17 of 36

12 In reality, what the Commission is attempting to do is to rely on the Limerick licensing EIS, and in particular the SAMA analysis there, as the basis for its SAMA analysis for relicensing. But this gives SAMAs less consideration than every other issue considered during relicensing, for as to all other issues the matter is either resolved in the Generic EIS or addressed on a site-specific basis in the relicensing Supplement. Again, particularly given the fact that, unlike every other issue, the Commission seeks to rely on the original NEPA review for its NEPA coverage on SAMAs for relicensing, the regulatory scheme should be read to permit a hearing over whether new and significant information bearing on SAMAs has emerged since licensing.10 the fact that the Commission determined that additional analysis of mitigation alternatives would provide too little value were dispositive of the Commissions NEPA obligations, NRC Br. at 12, then it would not have made sense to require any of the plants to conduct site-specific SAMA analyses at the relicensing stage.

10 By contrast, the new and significant information question for Category 1 issues is tied to information since the Generic EIS was issued. See 61 Fed. Reg. at 28,470 (JA 592). Thus, recognizing relicensing is a new major federal action for all other issues, the Commission completes an entirely fresh NEPA review, resolving some matters in the Generic EIS and the remainder in the site-specific Supplement for each plant. NRC Br. at 8 (explaining the Generic EIS and site-specific Supplement forms the full EIS for each plant). Only as to SAMAs, and only as to three plants (only one of which is a BWR), does the Commission purport to exclude the issue from consideration during relicensing.

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 18 of 36

13 The Commissions reliance on Massachusetts v. NRC, 708 F.3d 63 (1st Cir.

2013) and Blue Ridge Environmental Defense League v. NRC, 716 F.3d 183 (D.C.

Cir. 2013) is also misplaced. NRC Br. at 44-45. In the First Circuit case, the Commission had done a SAMA analysis in the site-specific relicensing SEIS because one had not been conducted at the licensing stage, and petitioners had not filed initial SAMA contentions.11 Petitioners were thus seeking to invoke the especially stringent standards for reopening a proceeding based on new information subsequent to the SEIS, see 708 F.3d at 76 standards not at issue here.

Similarly, the Blue Ridge case in this Circuit did not concern whether the Commission could categorically bar a hearing on an issue material to relicensing, but rather, the straightforward question whether petitioners had satisfied the contention admissibility requirements of Section 2.309(f). 716 F.3d at 196-200.

Again, in this case the only body to have considered NRDCs SAMA contentions under those factors - the Atomic Safety Licensing Board - determined the contentions should be admitted.

11 See NUREG-1437, Supplement 29, Final Supplemental EIS for Pilgrim Nuclear Power, at Section 5.2, available at http://pbadupws.nrc.gov/docs/ML0719/ML071990020.pdf (last visited May 19, 2015). That SAMA analysis revealed seven potentially cost-effective SAMA measures. Id. at 5-5.

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 19 of 36

14 Finally, there is also no basis to the Commissions refrain that the Court should defer to its expertise and scientific judgment on these matters. NRC Br. at 27-28. Where, as here, the fundamental issue concerns the proper interpretation of Petitioners statutory rights - and particularly where, as here, the agencys interpretation is dispositive of the Petitioners rights to judicial review -

the agency is not entitled to deference, let alone the kind of extra deference afforded to scientific judgments. See, e.g., Am. Farm Bureau Fedn v. E.P.A., 559 F.3d 512, 6 (D.C. Cir. 2009) (explaining deference due where an issue implicates an agencys scientific judgment); see also, e.g., Adams Fruit Co. v. Barrett, 494 U.S. 638, 649-50 (1990).12 12 The Commission seeks to distinguish the cases cited by NRDC on the grounds that while those implicated federal court jurisdiction, this case only concerns an agencys determination of whether a party is entitled to a hearing under [the agencys] own regulations.... NRC Br. at 29 (emphasis in original).

This reasoning overlooks the critical fact that NRDCs obtaining an adjudicatory hearing is dispositive of its rights to ultimate judicial review of the merits of its SAMA contentions, and thus the agencys implementation of its scheme is inextricably intertwined with this courts jurisdiction to review the agencys decision-making. Thus, while the Court might have reason to defer to the agencys technical judgment as to the adequacy of the SAMA analysis conducted in the Limerick SEIS, there is no basis for that kind of deference in resolving whether that analysis is even subject to review at all, the only question at stake here.

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 20 of 36

15 II.

THE COMMISSIONS DECISION THAT NRDC IS NOT ENTITLED TO A WAIVER OF 10 C.F.R. § 51.53(c)(3)(ii)(L) WAS ARBITRARY AND CAPRICIOUS.

If 10 C.F.R. § 51.53(c)(3)(ii)(L) is a bar to having SAMA contentions heard in the Limerick relicensing proceeding, then NRDC is entitled to a waiver of that regulation under 10 C.F.R. § 2.335(b), which allows a contention to be pursued despite a regulatory bar based on special circumstances with respect to the subject matter of the particular proceedings.... Id. As a threshold matter, while the Commission argues NRDC cannot meet the waiver criteria because NRDC did not raise issues that belong in the particular Limerick relicensing proceeding, it entirely fails to explain how that position can be reconciled with its own instructions to the Staff to consider all the issues raised in NRDCs SAMA contentions in the site-specific Limerick Final SEIS. See CLI-13-07 at 23 (JA 396)

([W]e direct the Staff to review the significance of any new SAMA-related information in its environmental review of Exelons license renewal application, including the information presented in NRDCs waiver petition, and to discuss its review in the final supplemental EIS.) (emphasis in original). Having determined NRDCs SAMA issues were appropriately considered in the Limerick SEIS (and thus outside the rulemaking petition and generic rule context), the Commission necessarily recognized NRDC was raising issues that could have a material bearing USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 21 of 36

16 on the decision to relicense the Limerick plant in particular. By the same token, this means NRDC should have obtained a waiver.

While the Commission and Exelon repeatedly argue this case is controlled by the First Circuits rulings (e.g. NRC Br. at 54; Exelon Br. at 23-25), there is a critical distinction: in none of the Commissions decisions at issue in those cases did the Commission direct that the issues raised by Massachusetts be considered in the specific relicensing proceeding. To the contrary, in each case the Commission determined the issues should only be considered as to all plants, and thus a Rulemaking Petition was the appropriate vehicle to address the Commonwealths concerns. See Entergy Nuclear Power (Vermont Yankee Nuclear Power Station),

CLI-07-03, 2007 WL 172517, *3 (Jan. 22, 2007) (It makes more sense for the NRC to study whether, as a technical matter, the agency should modify its requirements relating to spent fuel storage for all plants across the board.)

(emphasis added); Entergy Nuclear Generation Co., CLI-12-06, slip op. at 15-16 (Mar. 8, 2012) (Because the concerns that Massachusetts raises apply generically to all spent fuel pools at all reactors, they are more appropriately addressed via rulemaking or other appropriate generic activity) (citations omitted) (emphasis in original). Again, had the Commission here in fact concluded that NRDCs SAMA issues had no application specific to Limerick, there would have been no basis to USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 22 of 36

17 direct that they be addressed in the Final Limerick SEIS. But, having directed that the issues be addressed in the Final SEIS, the Commission erred in concluding NRDC could not obtain a waiver.

The Commissions responses concerning the specific SAMA issues raised by NRDC are similarly unpersuasive. NRC Br. at 56. It makes no sense to suggest the issues specific to BWR plants could come up for other BWR plants, id., since Limerick is the only BWR plant subject to the regulatory exception in 10 C.F.R. § 51.53(c)(3)(ii)(L).13 Thus, when every other BWR comes up for license renewal, the Commission will be required to conduct a full SAMA analysis, and the regulation will pose no bar to adjudicating its adequacy - and hence addressing BWR-related SAMAs during the Limerick relicensing could not swallow the rule, NRC Br. at 58, because, as to BWR issues, the rule only applies to Limerick.

The Commissions further claim that the mere fact that SAMA information may be new is insufficient because it would mean a waiver might always have to be granted based on new information, makes the waiver test unpassable. NRC Br.

at 57-58. Indeed, what else could possibly form the basis for a waiver request than 13 See 61 Fed. Reg. at 28481 (JA 603) (identifying the three plants for which the Commission conducted a SAMA analysis at the licensing stage as Limerick, Companche Peak 1 and 2, and Watts Bar).; see also List of Power Reactor Units, http://www.nrc.gov/reactors/operating/list-power-reactor-units.html (last visited May 20, 2015) (identifying Comanche Peak and Watts Bar as Pressure Water Reactors (PWR)).

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 23 of 36

18 some new information on an issue pertinent to relicensing? In sum, the Commissions effort to recast NRDCs specific new and significant information for Limerick into generic new information closes the entire window the waiver regulation was designed to (and is required to) leave open to allow issues to be raised in site-specific adjudications.14 The Commission also ignores that, as regards the contention involving economic costs, its final decision denying the waiver request recognized NRDC had provide[d] data that is specific to Limerick and the surrounding area....

CLI-13-07 at 20 (JA 393) (emphasis added). Rather than find it was not unique, the decision appears to have rejected this economic issue as insufficient on the merits.15 The Commission does not defend this aspect of the Denial. That is 14 For example, under the Commissions logic, if the agency decided to ignore during relicensing new scientific data revealing the Limerick plant is on a previously unknown seismic fault, thus exponentially increasing the likelihood of a severe nuclear accident, no one could obtain a waiver - and thus a hearing and judicial review - over that decision, which would merely raise new information alone. CLI-13-07 at 19 (JA 392). Simply to tease out the elements of the Commissions logic is to recognize that while the agency gives lip service to a waiver as a means to satisfy its obligation to provide a hearing on material issues, as applied by the Commission the waiver criteria can never be satisfied.

15 See CLI-13-07 at 21 (JA 394) (rejecting economic arguments on the grounds that [t]o litigate SAMA-related issues in an adjudicatory proceeding, however, we require the demonstration of a potentially significant deficiency in the SAMA analysis - that is, a deficiency that credibly could render the SAMA analysis unreasonable under NEPA standards.) (quoting Entergy Nuclear Generation Co.

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 24 of 36

19 telling, for, again, the Commission never considered whether NRDC meets the 10 C.F.R. § 2.309(f) contention admissibility factors. And again, the only body to have considered those factors - the Board - found NRDC satisfied each factor.

See supra at 1-2 & n.1.16 The Commission also does not explain how the decision that NRDCs arguments were insufficiently unique can be reconciled with the fact that SAMAs are a Category 2 issue for relicensing. Indeed, when the Commission issued its proposed relicensing scheme, it initially decided that the Generic EIS would adequately consider matters related to SAMAs, and that no further work would be necessary on a site-specific basis. Environmental Review for Renewal of (Pilgrim Nuclear Power Station), CLI-12-01 (Mar. 8, 2012); see also id. at 25

([U]nless a contention... raises a potentially significant deficiency in the SAMA analysis... a SAMA-related dispute will not be material to the licensing decision, and is not appropriate for litigation in an NRC proceeding.). It bears noting that the Pilgrim decision on which the Commission relied (CLI-12-01), was itself not a waiver case, but rather concerned whether the SAMA contentions met the contentions admissibility requirements. Id. (deeming the SAMA issues raised in the Pilgrim proceeding to not be material to the relicensing decision).

16 The Court should therefore not be misled by Exelons arguments that the SAMA issue was adequately addressed in the Environmental Report, and has now been adequately addressed in the Final SEIS. Int. Br. at 10-14. While NRDC disagrees, those matters are not at issue in this Petition, since NRDC has not yet obtained a hearing to challenge those conclusions and hence also cannot seek judicial review with regard to them. Exelons arguments that NRDCs contentions were not admissible under the admissibility factors, Int. Br. at 11-13 are similarly irrelevant, because, again, the Atomic Safety Licensing Board found the criteria satisfied and the Commission has not found otherwise.

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 25 of 36

20 Operating Licenses, 56 Fed. Reg. 47,016, 47,022 (Sept. 17, 1991). However, the Commission reversed course, determining in the Final Rule that - to comply with NEPA and Limerick Ecology Action, Inc. v. NRC, 869 F.2d 719 (3d Cir. 1989) - a site specific consideration of alternatives to mitigate severe accidents will be required at the time of license renewal. 61 Fed. Reg. at 28,480 (JA 602).

To be sure, in these regulations, and the Generic EIS, the Commission also concluded that SAMAs would not have to be considered from scratch during license renewal if they were considered at the licensing stage. E.g., 61 Fed. Reg. at 28,480 (JA 602). That is the basis for 10 C.F.R. § 51.53(c)(3)(ii)(L). However, the agency cannot reconcile how, on the one hand, it found NRDCs new and significant information concerning SAMAs to be generic, while at the same time concluding that new and significant information bearing on SAMAs are a site-specific issue that should be considered on a site-specific basis for each plant. See also, e.g., Limerick Ecology Action,, 869 F.2d at 737-39.17 Indeed, the Commissions effort to contrast the waiver petition (which it says is unavailable to NRDC) with a Rulemaking Petition (which it claims is the 17 The Commissions effort to distinguish Limerick Ecology, NRC Br. at 58-60, altogether ignores the specific portions of that decision on which we rely, see Pet. Br. at 45-46, where the Court rejected the Commissions argument that there were no unique circumstances at Limerick, 869 F.2d at 731-32, finding that SAMA issues vary tremendously among plants. Id. at 738.

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 26 of 36

21 appropriate vehicle for NRDCs concerns), NRC Br. at 60, only further serves to confirm the illogic of the agencys approach. Under the Commissions rules, a rulemaking petition is appropriate for impacts that are generic to all plants of a particular type. Massachusetts, 708 F.3d at 68. Thus, for example, in Massachusetts, the Court rejected Massachusettss waiver petition because it concluded the spent fuel accident issues the State sought to pursue had been resolved by a rule that applied to all plants, and thus that the appropriate vehicle to change that rule was through a Rulemaking Petition. Id. at 74-75.

By contrast, here the Rulemaking Petition the Commission insists NRDC should file would not seek to change a rule applicable to all plants, but rather would address a regulation that only applies to a single BWR, the Limerick Plant.

It simply makes no sense to suggest that such a concern is appropriately addressed through a Rulemaking Petition rather than through all of the other procedural mechanisms that NRDC tried and was rebuffed on, including the waiver petition that the Commission invited NRDC to pursue and then rejected.

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 27 of 36

22 Accordingly, to the extent the Court concludes that NRDC may not obtain a hearing absent a waiver of 10 C.F.R. § 51.53(c)(3)(ii)(L), the Commission erred in denying the waiver.18 III.

IF THE COMMISSIONS REGULATORY SCHEME MUST BE READ TO PRECLUDE NRDC FROM A HEARING ON SAMA CONTENTIONS, THE COURT SHOULD FIND IT UNLAWFUL.

The Commission asserts that, while its regulations preclude NRDCs SAMA contentions from being adjudicated, and NRDC is not entitled to a waiver, the regulatory scheme is lawful because NRDC has multiple opportunities to challenge the Commissions conclusions about the allegedly new and significant information on which NRDCs petition for review is based. NRC Br. at 63. Once again, however, each of the Commissions purported opportunities are, in fact, regulatory dead-ends, and none provides NRDC the opportunity to seek to 18 Exelon also urges that the Commissions approach is lawful in light of the non-adjudicatory means for SAMAs to be addressed in relicensing. Int. Br. at 28-

29. This ignores NRDCs right to obtain a hearing - and judicial review - if the regulations allowing a hearing are satisfied, an issue which, again, the Commission has not yet reached. See Mass., 522 F.3d at 130 (In theory, what fetters the agencys decision-making process and ensures ultimate compliance with NEPA is judicial review.) (emphasis added). In this regard it is critical to reiterate that, under the Commissions view, even if the Staff had completely ignored the Commissions instruction to consider NRDCs information in the Final SEIS, or relied on patently frivolous reasons for dismissing it, NRDC would have no recourse because it may not obtain a waiver and thus a hearing, prerequisites to ultimate judicial review.

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 28 of 36

23 challenge the adequacy of the more than twenty pages of discussion of SAMAs contained in the Final Limerick SEIS.

First, the Commission claims it is somehow sufficient that it acquiesces in the Courts jurisdiction over this Petition. NRC Br. at 61; see also id. at 51 (The very existence of the instant lawsuit also further confirms that NRDC has not been denied rights to judicial review.). But as the Commission elsewhere recognizes, NRC Br. at 2 n.4, this Petition only addresses whether the Commission erred in ruling that NRDC is categorically barred from a hearing on its SAMA Contentions, and does not and cannot address the adequacy of the SAMA analysis contained in the Limerick Final SEIS - an analysis the Commission has precluded NRDC from challenging. Thus, the fact that the Court has jurisdiction over this threshold issue obviously does not mean that Commission should prevail on the grounds that NRDC is not being denied judicial review over the merits of the SAMA arguments they want the Commission to consider. Indeed, a very similar heads the government wins and tails [Petitioner] loses argument was just recently rejected by this Court. See United States v. Emor, No. 13-3071, _ F.3d _, 2015 WL 2061817, *1 (D.C. Cir. May 5, 2015).

Second, the Commission rehashes its argument that NRDC, after exhausting every other procedural avenue merely to get its SAMA contentions before the USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 29 of 36

24 NRC (and a reviewing court), failed to select the one route that the Commission would actually entertain - a Rulemaking Petition. But not only is that position difficult to take seriously given the record before the Court - in which NRDC tried multiple pathways, including one invited by the Commission itself, only to run into successive dead-ends - but it makes especially little sense in the context of what NRDC is attempting to accomplish here. As we have explained, it would make no sense to submit a Rulemaking Petition where NRDCs concerns are specific to the Limerick Plant (which, again, is why the Commission itself sent them to Staff for consideration in the Limerick Final SEIS). Plainly, the Commission is playing little more than a bureaucratic game of hide and seek, Gerber v. Norton, 294 F.3d 173, 183 (D.C. Cir. 2002) (internal quotation omitted), in contending that if only NRDC had tried yet one more procedural avenue, it would finally have hit pay dirt.

Third, the Commission asserts that NRDCs opportunity to obtain a waiver demonstrates that the regulatory scheme is lawful. NRC Br. at 62. But, again, if, as we have demonstrated, the waiver rule is a regulatory dead end, that is not the kind of opportunity that can save the Commissions regulations.

Finally, the Commission relies on the fact that it directed the Staff to consider NRDCs materials in the Final SEIS, NRC Br. at 62, once again ignoring USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 30 of 36

25 both the incompatibility between that action and the finding that the issues raised do not pertain specifically to Limerick, and the fact that the pertinent question is whether NRDC may challenge whether Staff adequately considered those materials. Indeed, both the Commission and Exelon invite the Court to consider the analysis done by Staff in the Final SEIS, see, e.g., NRC Br. at 22, but in doing so ignore that the entire basis for this Petition is that, under the Commissions implementation of its regulations, NRDC itself is categorically barred from challenging that analysis before the Commission or the Court.19 19 Once NRDC has that opportunity, it will demonstrate fundamental inadequacies in the twenty pages of SAMA discussion in the Final SEIS, which must be reconsidered. For example, the Final SEIS discussion repeatedly relies on SAMA-related improvements made outside the NEPA process as a basis to conclude that there is no new and significant information on SAMAs to be considered. E.g. Final SEIS at 5-12 (JA 686) (claiming mitigating strategies...

would be implemented as part of the current licensing basis). This flies in the face of the Commissions repeated determination (as dictated by Limerick Ecology, 869 F.2d 719) that SAMAs may not be excluded from the NEPA process. See also, e.g., Final SEIS at 5-21 (JA 695) (discussing Limerick Individual Plant Examination and other non-NEPA developments); accord New York v. NRC, 681 F.3d 471, 479 (D.C. Cir. 2012) (rejecting Commission claim that an environmental issue will be resolved outside the NEPA process). As another example, in purporting to consider whether there is new and significant information concerning SAMAs implemented for other BWR plants that might be relevant to Limerick, the Final SEIS adopts Exelons proposal that the threshold for a SAMA that may meet this significance criteria is one that produces at least a 50%

reduction in risk. Final SEIS at 5-21 (JA 695). Particularly given the consequences of a severe accident, the Final SEIS entirely fails to justify why a measure that would reduce the risk by, say, more than 30% should not be considered. See Exelon Letter of Mar. 2, 2014, Enclosure at 9 (cited in Final SEIS USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 31 of 36

26 In short, this Court cannot sanction an outcome whereby the Commission successfully insulates itself from any judicial review over the adequacy of its consideration of SAMAs in the Limerick relicensing SEIS, a matter the Commission specifically directed its Staff to address in response to the issues raised by NRDC, by interpreting its regulatory scheme to preclude NRDC from becoming a party to the proceeding, and thereby precluding judicial review. If that is the only permissible reading of the Commissions regulations, the Court should deem them incompatible with NEPA, the Atomic Energy Act, and the Administrative Procedure Act. See, e.g., Coal River Energy, LLC v. Jewell, 751 at 5-20 (JA 694)) (identifying potential, unimplemented Limerick SAMA measure that would reduce risk by 33.9%) (available at http://pbadupws.nrc.gov/docs/ML1407/ML14071A378.pdf) (last visited May 19, 2015); see also New York, 681 F.3d at 478 (reiterating that an impact may be dismissed as not significant only if it is remote and speculative) (citations omitted). These and other issues will form the bases for NRDCs contentions against the Final SEIS SAMA discussion, supported by appropriate expert submissions, in the event this Court determines that, contrary to the Commissions rulings, NRDC is entitled to pursue admissible SAMA contentions against this portion of the Final SEIS, which it has been precluded from pursuing to date. See, e.g., Pet. Br. at 19 n.10 (citing Orders precluding NRDC from presenting SAMA contentions); Cf. Gerber 294 F.3d at 182-84 (finding plaintiff is entitled to have its concerns addressed by the agency, despite agencys post hoc claim that those concerns would not have changed the outcome).

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 32 of 36

27 F.3d 659, 664 (D.C. Cir. 2014) (deeming a regulation unlawful where inconsistent with applicable statute). 20 IV.

THE CHOURT SHOULD VACATE THE RENEWED LIMERICK LICENSE PENDING CONSIDERATION OF NRDCS CONTENTIONS.

The Commission ignores Petitioners request for relief, but Intervenors argue that at most a remand is appropriate. Exelon Br. at 34-37. To the contrary, it is well-established that vacatur is the presumptive remedy for the legal violation at issue here, see Pet. Br. at 51 (citing precedents), and Intervenor does not demonstrate otherwise. See also FiberTower Spectrum Holdings LLC v. FCC, 782 F.3d 692, 694 (D.C. Cir. 2015) (vacating and remanding Commission orders so the Commission can rule on the issues before it based on an accurate understanding of the record). Indeed, given that this Court had no difficulty 20 While Exelon passingly suggests NRDC is raising arguments for the first time, Int. Br. at 33, in fact NRDC has always maintained that the Commissions regulatory scheme cannot be applied to bar NRDCs contentions, and that such an interpretation would be inconsistent with statutory requirements. See, e.g., NRDC Waiver Pet. at 13-14 (JA 242-43) (arguing that reading the regulations to preclude a hearing would violate NEPA). It is also perfectly appropriate for NRDC to raise this argument at this time, when the Commissions scheme is being applied in violation of NRDCs rights to participate under NEPA and the Atomic Energy Act.

See, e.g., Independent Cmty. Bankers v. Fed. Reserve, 195 F.3d 28, 34 (D.C. Cir.

1999) (We have frequently said that a party against whom a rule is applied may, at the time of application, pursue substantive objections to the rule, including claims that an agency lacked the statutory authority to adopt the rule, even where the petitioner had notice and opportunity to bring a direct challenge within statutory time limits.) (citations omitted).

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 33 of 36

28 vacating the Commissions Waste Confidence Determination concerning spent nuclear fuel upon finding further NEPA review required, New York, 681 F.3d at 483, an outcome that had immediate bearing on the licensing process for many plants, see, e.g., LBP-14-15 at 4-5 (Oct. 7, 214) (JA 400-01) (discussing impact of the ruling in the Limerick proceeding), there is no basis for a different result here, particularly given that vacatur will have no disruptive effects. See Exelon Br. at 37 n.123 (explaining that the plant would operate under the original license in the event of vacatur); Pet. Br. at 51 (explaining the existing license extends for more than a decade).

CONCLUSION The Petition for Review should be granted.

Respectfully submitted,

/s/ Howard M. Crystal Geoffrey H. Fettus Natural Resources Defense Council 1152 15th Street, NW, Suite 300 Washington, D.C. 20005 (202) 289-2371 May 21, 2015 Howard M. Crystal Eric R. Glitzenstein MEYER GLITZENSTEIN &

CRYSTAL 1601 Connecticut Ave., N.W., Suite 700 Washington, D.C. 20009 (202) 588-5206 (202) 588-5049 (facsimile)

USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 34 of 36

CERTIFICATE OF COMPLIANCE PURSUANT TO FED. R. APP. P. 32(a)(7)(C)

I hereby certify that the foregoing Reply Brief for Petitioner Natural Resources Defense Council, Inc. contains 6,919 words excluding the parts of the brief exempted by the Federal Appellate and Circuit Rules.

/s/ Howard M. Crystal Howard M. Crystal USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 35 of 36

CERTIFICATE OF SERVICE I hereby certify that on May 21, 2015, undersigned counsel for Petitioner Natural Resources Defense Council, Inc. filed the foregoing Reply Brief For Petitioners with the U.S. Court of Appeals for the District of Columbia Circuit by filing the same with the Courts CM/ECF filing system. The following counsel will be served through this filing:

James E. Adler Andrew Averbach U.S. Nuclear Regulatory Commission Office of the General Counsel Division of Legal Counsel Mailstop O-15 D21 Rockville, MD 20852 John E. Arbab U.S. Department of Justice Environment & Natural Resources Division P.O. Box 7415 Washington, DC 20044 Counsel for Respondents Brad Fagg Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Counsel for Intervenor

/s/ Howard M. Crystal_

Howard M. Crystal USCA Case #14-1225 Document #1553574 Filed: 05/21/2015 Page 36 of 36