Pacific Gas and Electric Company James M. Welsch Diablo Canyon Power Plant Site Vice President Mail Code 104/6 P. 0. Box 56 Avila Beach, CA 93424 May 5, 2015 805.545.3242 Internal: 691.3242 PG&E Letter DCL-15-059 Fax: 805.545.4884 U.S. Nuclear Regulatory Commission 10 CFR 50.71(e)
ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units 1 and 2 Technical Specification Bases, Revision 9
Dear Commissioners and Staff:
Pursuant to Diablo Canyon Power Plant (DCPP) Unit 1 and Unit 2 Technical Specification (TS) 5.5.14, "Technical Specifications (TS) Bases Control Program,"
Pacific Gas and Electric Company (PG&E) hereby submits Revision 9 of the DCPP TS Bases. DCPP TS Bases, Revision 9, includes changes made to the DCPP TS Bases from August 29, 2013, through April 30, 2015, and replaces Revision 8 in its entirety. Changes are noted by revision bars in the right margin of the affected TS Bases.
PG&E is submitting the DCPP TS Bases, Revision 9, on the enclosed compact disc (CD), labeled "Diablo Canyon Power Plant Technical Specification Bases, Revision 9," dated May 2015. The contents are in Adobe Acrobat portable document format. A copy of this CD is being provided to the NRC Regional Administrator, Region IV, the DCPP NRR Project Manager, and the DCPP NRC Senior Resident Inspector.
The CD contains the following file:
File Name File Size (Mb) 01 DCPP TS Bases R9.pdf 2.83 Mb PG&E makes no new or revised regulatory commitments as defined by NEI 99-04, "Guidelines for Managing NRC Commitment Changes," dated July 1999, in this submittal.
If you have any questions regarding this submittal, please contact Mr. Philippe Soenen at (805) 545-6984.
A member of the STARS (Strategic Teaming and Resource Sharing)
AianceA 0
Callaway
- Diablo Canyon
- Palo Verde
- Wotf Creek
(
Document Control Desk May 5, 2015 Page 2 PG&E Letter DCL-15-059 Sincerely, Oames M.Wlc Site Vice President bnsm/4540/64082188 Enclosure cc:
Diablo Distribution cc/enc:
Marc L. Dapas, NRC Region IV Administrator Thomas R. Hipschman, NRC Senior Resident Inspector Siva P. Lingam, NRR Project Manager A
member of the STARS (Strategic Teaming and Resource Sharing)
Alliance Callaway
- Diablo Canyon
- Palo Verde -
Wolf Creek
PG&E Letter DCL-15-059 Enclosure Diablo Canyon - Units 1 and 2 Technical Specification Bases Revision 9, May 2015 (Revision 9 replaces Revision 8 in its entirety)