ML15120A137
| ML15120A137 | |
| Person / Time | |
|---|---|
| Site: | SHINE Medical Technologies |
| Issue date: | 04/10/2015 |
| From: | Bynum R Shine Medical Technologies |
| To: | Office of Nuclear Reactor Regulation |
| Lynch S | |
| References | |
| SHINE, SHINE.SUBMISSION.12, SHN.PSAR.P, SHN.PSAR.P.5 | |
| Download: ML15120A137 (8) | |
Text
Chapter 9 - Auxiliary Systems Heating, Ventilation, and Air Conditioning Systems SHINE Medical Technologies Rev. 0 Figure 9a2.1 RVZ1 Ventilation Flow Diagram
- 1. THIS ALSO APPLIES TO THE NOBLE GAS STORAGE CELL AND TOGS SHIELDED CELL.
NOTES:
NOTE 1 NOTE 1 NOTE 1
Chapter 9 - Auxiliary Systems Heating, Ventilation, and Air Conditioning Systems SHINE Medical Technologies Rev. 0 Figure 9a2.1 RVZ2SA and RVZ2 Ventilation Flow Diagram
Chapter 9 - Auxiliary Systems Handling & Storage of Target Solution SHINE Medical Technologies Rev. 0 Figure 9a2.2 Irradiation Facility Target Solution Storage and Handling Process Flow Diagram
Chapter 9 - Auxiliary Systems Handling & Storage of Target Solution SHINE Medical Technologies Rev. 0 Figure 9a2.2 Subcritical Assembly Cross-Section Proprietary Information - Withhold from public disclosure under 10 CFR 2.390(a)(4)
Security-Related Information - Withhold Under 10 CFR 2.390
Chapter 9 - Auxiliary Systems Fire Protection Systems and Programs SHINE Medical Technologies Rev. 0 Figure 9a2.3 Fire Area and Fire Zone Boundaries Proprietary Information - Withhold from public disclosure under 10 CFR 2.390(a)(4)
Security-Related Information - Withhold Under 10 CFR 2.390
Chapter 9 - Auxiliary Systems Fire Protection Systems and Programs SHINE Medical Technologies Rev. 0 Figure 9a2.3 Fire Protection Site Layout
SUPPORT FACILITY BUILDING ADMINISTRATION BUILDING PRODUCTION FACILITY DIESEL GENERATOR BUILDING WASTE STAGING AND SHIPPING BUILDING FP WATER TANK FIRE PUMP HOUSE FIRE WATER PUMP POST INDICATOR VALVE HYDRANT / CURB BOX OS&Y VALVE CHECK VALVE FP WATER TANK CITY WATER SUPPLY Chapter 9 - Auxiliary Systems Fire Protection Systems and Programs SHINE Medical Technologies Rev. 0 Figure 9a2.3 Fire Protection Process Flow Diagram
NOTE 5 2.
3.
4.
5.
NOTE 2 NOTE 2 NOTE 3 NOTE 4 Chapter 9 - Auxiliary Systems Tritium Purification System SHINE Medical Technologies Rev. 0 Figure 9a2.7 TPS Process Flow Diagram