ML15112A998

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amends 93,93 & 90 to Licenses DPR-38,DPR-47 & DPF-55,respectively
ML15112A998
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/10/1981
From: Reid R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML15112A995 List:
References
NUDOCS 8103030923
Download: ML15112A998 (2)


Text

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKETS NOS. 50-269, 50-270 AND 50-287 DUKE POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES The U. S. Nuclear Regulatory Commission (the Commission)-has issued Amendments Nos.

93, 93, and 90 to Facility Operating Licenses Nos. DPR-38, DPR-47 and DPR-55, respectively, issued to Duke Power Company, which revised the Technical Specifications (TSs) for operation of the Oconee Nuclear Station, Units Nos. 1, 2 and 3, located in Oconee County, South Carolina.

The amendments are effective as of the date of issuance.

These amendments revise the Station's common TSs to support the opera tion of Oconee Unit No. 3 at full rated power during Cycle 6. The amend ments also add a new TS 3.1.11, Shutdown Margin, and a new Section 3.5.2.9 to TS 3.5.2,Control Rod Group and Power Distribution Limits, for Oconee Units Nos. 1, 2 and 3.

The application for the amendments complies with the standards and require ments of the Atomic Energy Act of 1954, as amended (the Act), and the Com mission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter 1, which are set forth in the license amendments.

Prior public notice of these amendments was not required since the amendments do not involve a significant hazards consideration.

The Commission has determined that the issuance of these amendments will not result in any significant environmental impact and that pursuant to 10 CFR §51.5(d)(4) an environmental impact statement or negative declaration 83108080

7590-01 and environmental impact appraisal need not be prepared in connection with the issuance of these amendments.

For further details with respect to this action, see (1.) the applica tion for amendments dated August 25, 1980, as supplemented December 22, 1980, and January 22, 1981, (2) Amendments Nos. 93, 93

, and 90 to Licenses Nos. DPR-38, DPR-47 and DPR-55, respectively, and (3) the Commission's related Safety Evaluation.

All of these items are available for public inspection at the Commission's Public Document Room, 1717 H Street, N. W.,

Washington, D. C. and at the Oconee County Library, 501 West Southbroad Street,.Walhalla, South Carolina. A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, ). C. 20555, Attention:. Director, Division of Licensing.

Dated at Bethesda, Maryland, this 10th day of February 1981.

FOR THE NUCLEAR REGULATORY COMMISSION obert W. Reid, Chief Operating Reactors Branch #4 Division of Licensing