ML15112A840

From kanterella
Jump to navigation Jump to search
Notice of Issuance of Amend 66 to DPR-38,Amend 66 to DPR-47, & Amend 63 to DPR-55 Revising Common Tech Specs to Support the Oper of Unit 2 Full Rated Pwr During Cycle 4
ML15112A840
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/15/1978
From: Zwetzig G
Office of Nuclear Reactor Regulation
To:
Shared Package
ML15112A836 List:
References
NUDOCS 7812280267
Download: ML15112A840 (2)


Text

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKETS NOS. 50-269, 50-270 AND 50-287 DUKE POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendments Nos. 66, 66 and 63 to Facility Operating Licenses Nos. DPR-38, DPR-47 and DPR-55, respectively, issued to Duke Power Company, which revised Technical Specifications for operation of the Oconee Nuclear Station, Units Nos. 1, 2 and 3 located in Oconee County, South Carolina.

The amendments are effective as of the date of issuance.

The amendments revise the Station's common Technical Specifications to support the operation of Oconee Unit No. 2 at full rated power during Cycle 4 after core reload and removal of the orifice rod assemblies from the core. These amendments also revise the Technical Specifications for Units 1, 2 and 3 in regard to control rod operability.

The application for the amendments complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendments. Prior public notice of these amendments was not required since the amendments do not involve a significant hazards consideration.

7i81228 o61

7590-01

-2 The Commission has determined that the issuance of these amendments will not result in any significant environmental impact and that pursuant to 10 CFR 851.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with these amendments.

For further details with respect to this action, see (1) the application for amendments dated September 18, 1978, as supplemented September 25, and November 1, 1978, (2) Amendments Nos.

66, 66 and 63 to Licenses Nos. DPR-38, DPR-47 and DPR-55, respectively, and (3) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Coniission's Public Document Room, 1717 H Street, N. W., Washington, D. C., and at the Oconee County Library, 201 South Spring Street, Walhalla, South Carolina. A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, Attention: Director, Division of Operating Reactors.

Dated at Bethesda, Maryland, this 15th day of December 1978.

FOR THE NUCLEAR REGULATORY COMMISSION Crald BZ tzig, cting Chief Operating Reactors Branch #4 Division of Operating Reactors