NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Requests 1-RR-5-7 and 2-RR-5-7 the Fifth 10-Year Interval for the ISI Program
ML15103A007
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 04/10/2015
From: Carlson G
Northern States Power Co, Xcel Energy
To: Beltz T
Plant Licensing Branch III
References
TAC MF4834, TAC MF4844
Download: ML15103A007 (3)


Text

NRR-PMDAPEm Resource From: Carlson, Glenn A. [Glenn.Carlson@xenuclear.com]

Sent: Friday, April 10, 2015 4:06 PM To: Beltz, Terry Cc: Vincent, Dale M.; Hammargren, Benjamin J.

Subject:

RE: Prairie Island Nuclear Generating Plant, Units 1 and 2 - Requests 1-RR-5-7 and 2-RR-5-7 re: the Fifth 10-Year Interval for the ISI Program (TAC Nos. MF4843 and MF4844)

Good day, Terry.

We acknowledge your 4/1/2015 email below notifying us that the NRC staff will review the subject relief requests under 10 CFR 50.55a(a)(3)(i) (acceptable level of quality and safety) and not 50.55a(a)(3)(ii) (hardship or unusual difficulty) as proposed in the request.

We believe that 50.55a(a)(3)(i) is an acceptable basis for authorizing the relief we request.

Thank you and regards, Glenn Glenn A. Carlson, JD, PhD Xcel Energy l Responsible By Nature Senior Nuclear Engineer Regulatory Affairs Prairie Island Nuclear Generating Plant 1717 Wakonade Drive East, Welch, MN 55089 P: 651.267.1755 E: Glenn.Carlson@xenuclear.com XCELENERGY.COM Please consider the environment before printing this email.

This e-mail, and any attachments, may contain confidential or private material for the sole use of the intended recipient(s).

If you are not the intended recipient, please contact the sender by reply mail and delete all copies of this message and any attachments.

From: Beltz, Terry Sent: Wednesday, April 01, 2015 9:45 AM To: Carlson, Glenn A. (Glenn.Carlson@xenuclear.com)

Cc: Vincent, Dale M.; Alley, David; Vitto, Steven

Subject:

Prairie Island Nuclear Generating Plant, Units 1 and 2 - Requests 1-RR-5-7 and 2-RR-5-7 re: the Fifth 10-Year Interval for the ISI Program (TAC Nos. MF4843 and MF4844)

Dear Mr. Carlson:

Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(a)(3), proposed alternatives to the requirements of 10 CFR 50.55a(g), may be used when authorized by the U.S. Nuclear Regulatory Commission (NRC) if the licensee demonstrates that (i) the proposed alternatives would provide an acceptable level of quality and safety or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.

1

In the Subject request dated September 15, 2014, NSPM referenced a precedent for Arkansas Nuclear One, Unit 1 (ANO-1). The NRC staff authorized this alternative pursuant to 10 CFR 50.55a(a)(3)(i), in that the licensee requested to use the proposed alternative to the examination frequency requirements of ASME Code Case N-729-1 for the reactor vessel closure head at ANO-1 on the basis that the proposed alternative provided an acceptable level of quality and safety.

In the Subject request, NSPM is seeking NRC authorization in accordance with 10 CFR 50.55a(a)(3)(ii), based on hardship or unusual difficulty without a compensating increase in the level of quality or safety.

Based on other recent precedent, including the aforementioned ANO-1 request, the NRC staff is informing you that it will be reviewing the Subject relief requests under 10 CFR 50.55a(a)(3)(i), and not the section proposed in the request.

Finally, please be mindful (and to be noted for future submittals) that the NRC staff will be including the following paragraph in its safety evaluation to avoid any confusion regarding the changing of section numbers in 10 CFR 50.55a:

The paragraph headings in 10 CFR 50.55a were changed by Federal Register notice dated November 5, 2014 (79 FR 65776), which became effective on December 5, 2014 (e.g., 10 CFR 50.55a(a)(3)(i) is now 50.55a(z)(1), and 50.55a(a)(3)(ii) is now 50.55a(z)(2)). See the cross reference tables, which are cited in the notice, at ADAMS Accession No. ML14015A191 and ADAMS Package Accession No. ML14211A050.

Please let me know if you have any specific questions or concerns regarding this matter. Thanks.

Sincerely, TERRY A. BELTZ, SENIOR PROJECT MANAGER U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mail Stop: O-8D15 Phone: (301) 415-3049 Terry.Beltz@nrc.gov Confidentiality Notice: This email message, including any attachments, contains or may contain confidential information intended only for the addressee. If you are not an intended recipient of this message, be advised that any reading, dissemination, forwarding, printing, copying or other use of this message or its attachments is strictly prohibited. If you have received this message in error, please notify the sender immediately by reply message and delete this email message and any attachments from your system.

2

Hearing Identifier: NRR_PMDA Email Number: 1989 Mail Envelope Properties (f0cf991ef5594444a17475795831577a)

Subject:

RE: Prairie Island Nuclear Generating Plant, Units 1 and 2 - Requests 1-RR-5-7 and 2-RR-5-7 re: the Fifth 10-Year Interval for the ISI Program (TAC Nos. MF4843 and MF4844)

Sent Date: 4/10/2015 4:05:54 PM Received Date: 4/10/2015 4:05:58 PM From: Carlson, Glenn A.

Created By: Glenn.Carlson@xenuclear.com Recipients:

"Vincent, Dale M." <Dale.Vincent@xenuclear.com>

Tracking Status: None "Hammargren, Benjamin J." <Benjamin.Hammargren@xenuclear.com>

Tracking Status: None "Beltz, Terry" <Terry.Beltz@nrc.gov>

Tracking Status: None Post Office: PIEX01.ft.nmcco.net Files Size Date & Time MESSAGE 4570 4/10/2015 4:05:58 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: