ML15092A133

From kanterella
Jump to navigation Jump to search
Nuclear Property Insurance and Decontamination Liability Insurance
ML15092A133
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/30/2015
From: Brabec R
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
Download: ML15092A133 (2)


Text

SSOUTHERN CALIFORNIA EDISON An EDISON INTERNATIONAL Company Richard C. Brabec Principal Manager, Nuclear Regulatory Affairs and Emergency Planning March 30, 2015 10 CFR 50.54 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

Docket Nos. 50-206, 50-361 and 50-362 Nuclear Property Insurance San Onofre Nuclear Generating Station Units 1, 2, and 3

Dear Sir or Madam:

This letter is the report required by 10 CFR 50.54(w)(3). The following Nuclear Property and Decontamination Liability Insurance will be in effect for the San Onofre Nuclear Generating Station on the April 1, 2015 policy renewal date:

Policy (Amount)

Primary Property and Decontamination Liability Insurance Policy

($1,500 million)

Decontamination Liability, Decommissioning Liability and Excess Property Insurance Policy

($1,250 million)

Source Nuclear Electric Insurance Limited (NEIL Primary)

Nuclear Electric Insurance Limited (NEIL II)

All policies providing coverage mentioned above comply with 10 CFR 50.54(w), including provisions for the insurance proceeds to be prioritized for dedicated reactor stabilization/safety and then for decontamination of the site.

There are no commitments contained in this letter.

If you have any questions or require additional information, please contact Ms. Andrea Sterdis at (949) 368-9985.

e ely, P.O. Box 128 San Clemente, CA 92672 (949) 368-7418 PAX 87418 Fax: (949) 368-7575 Iohn.Brabec@sce.com ec~

Document Control Desk March 30, 2015 cc:

M. L. Dapas, Regional Administrator, NRC Region IV R. L. Kellar, Region IV, Branch Chief, Repository and Spent Fuel Safety J. E. Whitten, Region IV, San Onofre Unit 1 T. J. Wengert, NRC Project Manager, San Onofre Units 2 and 3 M. G. Vaaler, NRC Project Manager, San Onofre Unit 1